initial station 中文意思是什麼

initial station 解釋
超始點
  • initial : adj 最初的,開始的;原始的;初期的,初發的。 the initial boiling point 【化學】初餾點〈第一滴餾物...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. On - site measurements of parameters such as temperature, ph, turbidity and dissolved oxygen are made using the multiparameter water quality measuring probe, and recorded in the data logger. the readings obtained are then compared against the normal ranges from that station, and any unusual readings result in a second set of measurements being made to check the validity of the initial reading

    另外,工作人員利用多參數水質計量儀實地量度多項水質參數,包括水溫酸鹼度混濁度及溶解氧,將測量結果記錄在數據記錄器內,再與該監測站的正常參數范圍比較,核實數據的真實性。
  2. 4. combined with the design of the three gorges prestressed concrete penstock with steel liner in the three gorges power. station, the consistence among the results of theory calculating, the analysis of plane finite element and three dimensional finite element is proved, the concrete stress distributions of the prestressed concrete penstock are analyzed with different steel liner thicknesses, different crack resistances, different concrete thicknesses and different initial radial gaps between steel liner and concrete. the feasibility of the design method of prestressed concrete penstock with steel liner is proved

    結合三峽電站鋼襯預應力混凝土聯合受力壓力管道的設計方案選擇及論證分析,對比分析了鋼襯預應力混凝土壓力管道理論計算、平面有限元和管壩整體三維有限元分析結果的一致性,確定了管道結構在不同鋼襯厚度、不同抗裂度要求、不同外包混凝土厚度及不同鋼襯與管壁混凝土間初始徑向間隙等因素影響下的內力分佈規律,驗證了鋼襯預應力混凝土壓力管道的設計方法。
  3. Displacement function means for calculating geostress in fem analysis of underground houses is used, based on crustal stress data of underground cavern of pump water station of tong guanshan yixing to store energy, applying the displacement function theory and 3d nonlinear fem, the thesis simulates a displacement field applied the boundary in engineering area and obtain the initial crust stress field through load function in ansys. the result shows that the error between regressed ones and actual ones is controlled in allowed limit and supply the important data for building and design

    根據宜興銅官山抽水蓄能電站地下廠房區的地應力實測資料,運用位移函數法理論,採用三維非線性有限元計算方法,反演出施加在廠房區邊界上的位移場,藉助州sys有限元分析軟體,獲取模型邊界節點的坐標信息,然後通過ansys軟體的載荷函數將邊界位移程序化施加到模型邊界上,最後得到整個區域的初始地應力場,結果表明回歸后的地應力值與實測值接近,為地下工程的施工設計提供了重要的資料。
  4. As to the tunnels of jinping hydroelectric power station in sicuan province, the thesis discusses how to reasonably consider the initial stress field when designing a large - scale tunnel with high initial stress and deep buried. first, by analyzing of the rock lab tests and discusses the feature of regional geomorphology. explains the production of initial stress field, analyze the initial stress of jinping hydroelectric power station ; second, using the fem, the paper creates the real model of region. according to the results of stress measurement point, by combining of ann and fem to decide the boundary condition, the paper calculates the initial stress field ; at last, the paper analyzes the influence of the initial stress field formed from different condition on the deformation and stress of the surrounding rock, and the main factor to influence the initial stress. on the basis of the former work, the author proposes some proposals, which will be helpful for studying and designing of the similar undergroun d engineering

    首先從巖體的應力?變形的特性入手,並結合工程區域的地形地貌特徵,對巖體初始地應力場的形成做出解釋,結合錦屏水電站初始地應力的現狀提出了將地應力場進行分帶;然後建立整個工程區的實體模型,在地質分析的基礎上,以工程區右半部分為代表,參照實測點的初始地應力值,採用了神經網路與有限元相結合的方法反演了該區域的初始地應力場;最後模擬隧洞的開挖,通過計算比較分析了初始地應力場對處于不同應力帶內的隧洞圍巖穩定性的影響,在此基礎上提出了作者的建議,力圖為該類工程的研究設計工作提供有益的幫助。
  5. Initial exploration of causes for cracking of turbine ' s seal ring in the ertan hydropower station

    二灘電站水輪機止漏環開裂原因初探
  6. In chapter 1, the thesis studys the following cauthy problem to hyperbolic system with nonlinear relaxation term we prove that for the initial value with bounded c1 norm, there exists a unique global smooth solution for the cauthy problem ( 1 ), ( 2 ) ; in chapter 2, the thesis considers the following hyperbolic system with relaxation term and the sclar conservaton law equation when e is fixed, for a certain class of initial data, in the large time station, the thesis gets a determined lp ( p > 2 ) decay rate between the golbal smooth solutions of system ( 3 ) and the rarefaction waves solution of equation ( 4 )

    在第一章中,研究如下帶非線性鬆弛項的雙曲組的柯西問題證明了,對c ~ 1模有界的初值,柯西問題( 1 ) , ( 2 )存在唯一的整體光滑解。在第二章中,考慮如下帶鬆弛項的雙曲組和單守恆律方程u _ t + f ( u ) _ x 0 , ( x , t ) r r ~ + 。 ( 4 )當固定時,對一類初值,得到方程組( 3 )柯西問題的整體光滑解與方程( 4 )的稀疏波解間在大時間狀態下的l ~ p ( p 2 )衰減率。
  7. Initial enquiries revealed that police officers from the narcotics bureau mounted an operation at the lo wu kcr station this morning

    初步調查顯示,毒品調查科人員今日上午在羅湖火車站進行一項行動。
  8. The paper analyzes and researches the operation modes in the initial operation period of letan hydropower station and under the conditions of normal operation, on the premise of ensuring pivotal project and units to be safe and stable, the modes call hydropower station into full play in the systems and improve power benefit

    摘要對樂灘水電站初期及正常運行情況下的運行方式進行分析研究,使其運行方式在確保樞紐工程和機組的安全、穩定的前提下,充分發揮電站在系統中的作用,提高發電效益。
  9. Altogether, 122 recruits comprising 10 station officers and 112 firemen have successfully completed initial training during the year

    年內,共有122名消防學員順利完成初級訓練,其中包括10名消防隊長和112名消防員。
  10. Initial d is movie adaptation of a japanese comic. despite some minor modification of the characters, like, in the comic, itsuki chapman to is supposed to be only a worker at the gas station, but now he becomes the son of the station owner, the movie generally follows the original as faithful as possible

    頭文字d由同名的日本漫畫改篇人物和情節基本上都從原著取材但編導也作出一些改動例如阿木杜汶澤飾演原著稱阿樹和油站老闆本來沒有關系在電影內卻變成父子。
分享友人