inspection after construction 中文意思是什麼

inspection after construction 解釋
成品檢驗竣工后的入級檢驗
  • inspection : n. 1. 檢查,檢驗;審查。2. 檢閱,視察;參觀。
  • after : adv 在後;繼后;后來。 follow after 跟著。 look before and after 瞻前顧后,前思後想。 soon after ...
  • construction : n 1 建築,結構,構造,架設,鋪設;建設;設計;工程;建築法,構造法,建築物;【戲劇】搭置,布景,...
  1. The thesis has summarized the development of the oblique - pull bridge, its construction technology and the importance of bridge construction control, then has introduced project general situation, and has narrated detailed regulation, organization construction, the major work and difficult part of this bridge construction control. the following is the key part of this thesis, firstly, it has introduced the experiment work of early stage, structural calculation and its theoretical result : the absolute altitude of each operating mode, the absolute altitude of building mould in each section and the absolute altitude after pouring concrete ; then, it has discussed the method and content of the line shape control of the main beam, actual absolute altitude of building mould is put forward, and it has described the method of structural stress monitoring, how to arrange measure point and collect data, and how to analyze data. it has also narrated the method of rope force detection and structural temperature inspection

    本論文在總結了斜拉橋的發展及其施工工藝,並指出了橋梁施工控制的重要性之後,簡要的介紹了工程概況,敘述了炳草崗金沙江大橋監控細則、組織機構及監控的主要工作和難點部分;論文的核心部分,在介紹了炳草崗金沙江大橋施工控制與監測工作的前期實驗工作和施工各工況標高、各節段支模標高、澆注混凝土后的標高的結構計算和其理論計算結果之後,詳細論述了主梁的標高線形控制方法和內容,實際支模標高的提出,結構應力監控的方法、布點、測讀及其對測讀數據的合理分析方法,索力檢測和結構溫度監測的方法。
  2. Inspection after construction

    施工后檢驗
  3. Reliability : combined with actual examples of gyratory sprayed piles and complex foundation piles this chapter describes selection of gyratory sprayed pumping, scope, spraying materials, determination of gyratory spraying parameters, quality inspection and detailed construction process. based on the results the article summarizes settlement laws through analysis of ground base settlement observation materials and this shows that after treatment ground base settlement was reduced greatly and the method is effective

    本文結合工程實例分析了注漿以後形成的旋噴樁以及復合地基的力學特徵,然後對旋噴注漿方案的選擇、注漿邊界范圍、注漿材料、旋噴參數的確定、旋噴質量檢驗方法等具體施工過程進行了詳細描述,通過對工程處理后地基沉降觀測資料的分析,表明處理后地基沉降量有了明顯降低,說明該方法在控制沉降方面非常有效。
分享友人