intake water 中文意思是什麼

intake water 解釋
進水
  • intake : n 1 吸入,納入,收納。2 進水口 (opp outlet); 輸入端,(礦井的)進風巷道,通風孔。3 吸氣,進氣。...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. Carbon absorption system, coagulation flocculation system, maceration, filter - cartridge, filter - packed bed, floatation unit, grease trap, grit removal, mixer, oil interceptor, oil water separator, screen intake, sedimentation system, uv steriliser

    絮凝系統、浸析、過濾筒、過濾填充床、浮起設置、隔油池、除砂器、混合器、截油器、油
  2. Carbon absorption system, coagulation flocculation system, maceration, filter - - cartridge, filter - - packed bed, floatation unit, grease trap, grit removal, mixer, oil interceptor, oil water separator, screen intake, sedimentation system, uv steriliser

    絮凝系統、浸析、過濾筒、過濾填充床、浮起設置、隔油池、除砂器、混合器、截油器、油
  3. Hard and soft water, water works, industrial water, surface water intake facilities, distribution facilities, filtration facilities, etc

    硬軟水、水務工程、工業用水、水源設施、配水設施、過濾設施等
  4. The water intake and outlet of power plant in tidal river bend is researched by model test with adopting w shaped rippled groove which meets the request of model roughness

    摘要進行了潮汐彎道段電廠取排水模型試驗,採用w形波紋凹槽方式加糙,使模型糙率達到了模型試驗的要求。
  5. Meanwhile in the condition of high temperature, water vapors can participate in combustion. water gas reaction will happen, which will reduce carbon particle in flame, and reform combustion performance, so improve combustion efficiency. the article developed a kind of technology of water injection into intake ports for 4135g diesel engine, meanwhile designed a suit of water injection system

    同時在高溫條件下,水蒸汽參與燃燒,部分水分子與未完全燃燒的熾熱的炭粒發生水煤氣反應,形成可燃性氣體,從而減少了火焰中的炭粒,提高了油的燃燒程度,改善了燃燒狀況,提高了油的燃燒效率。
  6. From water jacket intake manifold

    自進氣歧管水套
  7. The flow behavior of resin, water outlet structure at bottom of the mixed bed, water inlet position of hydraulic transportation, water intake ratio, and pneumatic transportation etc. have been analysed, giving out optimal selection of them combined with reality in the field

    對樹脂的流動性能、混床底部出水結構、水力輸送進水位置、進水比例以及氣力輸送等進行了分析,並結合實際給出了最佳選擇。
  8. Optimization design of intake of dalian water diversion from biliuhe reservoir

    大連引碧渡槽施工的保溫措施
  9. The results showed : ( 1 ) the activity concentration of 95zr in water reduced quickly for subsidence, soil absorption, crucian intake, hornwort ' s absorption and adsorption. the dynamics of its disappearance accorded with binomial index regression law : cw. = 43. 36e - 1. 74t ' + 12. 85e - 0. 15 ( 2 ) the hornwort had stro

    結果表明: ( l )從水體中引入的95zr由於沉降、土壤吸附、被魚體攝入和金魚藻的吸收、吸附作用使水體中的gszr比活度呈快速下降,其消失動態符合二項指數衰減規律, cw = 43 . 36e . , . 74t + 12 . 85e一住『 」 。
  10. Water will auto refill untill the air intake hose can ' t intake air

    瓶內的水就會自動加入缸內,直到進氣喉不能在進氣。
  11. The analysis starts with the criterion of flood control and the capacity of flood discharge of the watercourse, where the water - intake pump house lies. through an analysis of a large amount of historical hydrological materials, a mathematic model is set up and the calculation is done

    課題分析研究主要是從取水泵房所處河道的防洪標準和行洪能力兩大方面入手,通過對大量歷史水文資料的分析建立數學模型進行分析。
  12. The optimal layout scheme and design scale of the plant site are determined through the analysis and evaluation of the capacity of flood control and flood discharge of the watercourse nearby the pump house of zhongning electric power plant. this will provide use for reference for the similar water - intake engineering in the future. it has great significance for theoretical research and practicable value for application as well

    本課題通過對中寧發電廠取水泵房廠址附近河道的防洪及河道行洪能力的分析和評價來確定其廠址的最優布設方案和設計規模,對今後類似的黃河上取水泵房的設計提供借鑒,因此具有重要理論研究意義和實際應用價值。
  13. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取水工程的布設要考慮工程所處河段的地質水文等諸多因素。如該河段上下游水庫的庫容,泄水流量、河道沖刷、淤積、河床形態、水流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪工程的影響及對周圍環境和第三人合法權益的影響等等。
  14. Norm of water intake - part 1 : electric power production

    取水定額第1部分:火力發電
  15. Norm of water intake - part 3 : petroleum refining

    取水定額第3部分:石油煉制
  16. Intake of other foods such as kelp, soy beans, pumpkin seeds, water melon seeds, almonds, peanuts, yeast, malt, and milk helps to increase the body s melatonin production

    此外,攝取諸如海帶黃豆南瓜子西瓜子杏仁果花生酵母麥芽牛奶等食物,也有助於褪黑激素的合成。
  17. Indication of moisture in intake ; numerous water leaks from fuselage

    進氣道有水汽;飛機漏進許多水。
  18. Experiment study on hydraulic model of the water intake in ash depot of thermal power plant

    火電廠貯灰場排洪壩進水口模型試驗研究
  19. Effects of water intake on sedimentation in entrance channel and port basin

    電廠從港池取水對進港航道及港池回淤的影響
  20. Norm of water intake - part 2 : iron and steel complex

    取水定額第2部分:鋼鐵聯合企業
分享友人