irrigation water capacity 中文意思是什麼

irrigation water capacity 解釋
灌溉用水量
  • irrigation : n. 1. 灌溉;水利。2. 【醫學】沖洗(法),〈pl. 〉沖注洗劑。adj. -al ,-ist n. 灌溉者,水利專家。
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. The soil self - purification, the influencing and determinate factors of the soil environmental capacity, and its application in controlling the area gross pollutants, constituting the soil - environmental quality standards, the irrigation water quality standards and the contaminative mud standards in farmland were discussed

    論述土壤自凈作用,土壤環境容量影響和確定因素,土壤環境容量在區域污染物的總量控制、土壤環境質量的標準的制定、農田灌溉水質標準、污泥農田施用標準等方面的應用。
  2. The research posed the strategic aim and choice of irrigable agriculture in the area, . by analysis and discussion of latent capacity and present conditions of water resource and land resource. the focus points include : formulate and implement reform strategy ; agriculture industrialization strategy ; economical irrigation strategy ; sustainable development strategy ; agricultural modernization stratagem

    本文主題是甘肅省東中部地區灌溉農業的發展方略問題,通過對東中部地區水資源和土地資源的現狀和潛力進行大量的分析和探討后,提出甘肅省東中部地區灌溉農業發展的戰略目標和戰略選擇。全文共分為五大部分展開論述。
  3. This paper analyzes the present situation of water capacity distribution in pishihang irrigation area, and puts forward the countermeasure to solve the existing problem

    摘要文章分析了淠史杭灌區水量分配現狀,對存在的問題提出了解決的對策。
  4. First each of the eight factors, i. e., per capita water resource available, per capita water requirement quantity, environmental water use rate, utilization rate of water resource, industrial water requirement quantity per 10, 000 industrial product value, water requirement module, regional irrigation rate was analyzed. then the water resource capacity in hejin city was evaluated by applying the fuzzy comprehensive estimation

    選取了人均水資源可利用量,人均供水量,生態需水率,水資源利用率,萬元工業產值需水量,需水模數,生活需水定額,耕地灌溉率等8個評價因素,利用模糊綜合評判模型對其水資源承載能力進行了評價研究,並提出了河津市水資源安全對策。
  5. But with the continuous decrease of ice mountain water flow, the water conservancy and hydropower potential will diminish, the industrial production will be adversely affected, and the agricultural output will reduce due to lowered irrigation capacity

    但是,隨著冰山水流的不斷減少,水利發電的能量潛力也將減少,工業生產將受到影響,同時灌溉能力的降低也將造成農業減產。
  6. An instrument of measuring irrigation water flow with higher precision has been developed by means of integrating smart ic card with turbine flow sensor, which improves the existed flow measuring technique for pumping well from the aspects of precision, sensing, capacity, data storage, safety and monitoring, and then enhances the precision of the irrigation flow measuring device from 1m ^ 3 to over 0. 01m ^ 3

    摘要將渦輪流量傳感器與智能ic卡技術進行集成應用,開發出高精度的灌溉用水計量設備,從精度、傳感、容量、數據存儲、安全、監控6方面提高了現有機井量水技術,將灌溉量水設備精度由1立方公尺提高到0 . 01立方公尺以上。
  7. Throug the study on irrigation quota and irrigation times for licorice root planted in arid sandy land of middle ningxia, the result shows : by increasing irrigation frequency and irrigation fixed quantity properly, it can play a positive role in the conserving and increasing water - holding capacity in arid - belt sandy area

    摘要通過對寧夏中部乾旱帶沙地種植甘草的不同灌水定額及次數的研究,結果表明,適當的增加灌水次數和灌水定額對于保持和增加乾旱帶沙壤土持水率具有積極的作用,有利於植物的生長發育。
  8. Jahezi reservoir is located at the northwest arid area of china, the primary tasks of which are flood control land irrigation. it has been reinforced in 2003 so the discharge capacity and the safety of dam were increasing at large degree, which created the conditions to utilize the flood sufficiently by raising the limited water level

    夾河子水庫地處我國西北乾旱區,主要承擔防洪及灌溉任務, 2003年除險加固完成後,水庫的泄流能力及大壩安全都有很大程度的提高,為水庫抬高汛限水位,實現洪水資源化創造了條件。
  9. For example, when the design flow of upward of the peace bridge of upward of the east - one main canal is 45m3 / s, the actual flow quantity is 23. 8m3 / s on the 30th of september in 1989, the water level of the transition region terminal of the mouth of hao wan flume of the east - one main canal had gained the design level of 4. 3m, and the level between downstream and shang tian yuan tunnel was generally higher. it says that the actual discharge capacity now is only about 24m3 / s which is half of the design value. this not only make the benefit of the irrigation district abnormal, but also greatly hinder the economic development of the irrigation district, and lead to the canal run frequently at small flow, high water level, lengthen the discharge duration

    如東一乾渠上段太平橋以上設計流量45m ~ 3 s , 1989年9月30日實測通水流量23 . 8m ~ 3 s時,東一乾渠郝灣渡槽出口漸變段末端水位已達到設計水位4 . 3m ,其下游至上天院隧洞水位也普遍偏高,即東一乾渠上段目前僅能通過流量24m ~ 3 s左右,只有設計值的50左右,不僅使灌區效益得不到正常發揮,嚴重阻礙了灌區范圍內的經濟發展,而且使渠道經常處于小流量、高水位運行,延長了次通水時間,大大增加了渠道工程的安全管理難度。
  10. Water delivery has been run over 30 years. the main canal has the problem that the actual conveying capacity is very low now and the conveying capacity of the east - one main canal i only half of the design value, this lead to guaranteed real - time efficiency of the irrigation of the farmland recede greatly. the downstream has no water and crops were drought to death have been seen more times in the irrigation period, this lead to the contradictory between the upstream and downstream on water usage, moreover, the lower discharge capacity of the dry canal in irrigation period is the main cause of the actual irrigated area is only half of the design value

    經過三十年的輸水運行,目前乾渠工程存在嚴重的輸水能力低問題,其中東一乾渠輸水能力只能達到原設計的1 2 ,使農田的適時灌溉保證率大大降低,多次發生灌溉期下游見不到水而旱死莊稼的情況,造成上下游用水矛盾突出,而且灌溉期乾渠過流能力偏小,是導致實際灌溉面積僅為設計值的1 3的重要原因。
分享友人