island eastern corridor link 中文意思是什麼

island eastern corridor link 解釋
東區走廊連接路
  • island : n 1 島,島嶼。2 島狀物;孤立的地區;孤立的組織。3 【造船】航空母艦或船隻的上層建築〈如艦橋、艦臺...
  • eastern : adj. 1. 東(方的);〈E-〉 東方的,東部(地方)的。2. (風)從東吹來的。3. 朝東的。n. 1. 東方人。2. 東正教信徒。
  • corridor : n 【建築】走廊;通路;【築城】覆道。 corridor carriage 〈英國〉有走廊的客車。 corridor train 通廊...
  • link : n 1 環鏈環。2 (編織物的)鏈圈。3 (鏈狀物中的)一節(多節香腸等的)一節單節小香腸。4 承前啟后的...
  1. Major projects under planning include the traffic improvements to tuen mun road town centre section, reconstruction and improvement to tuen mun road, widening of the tolo highway fanling highway between island house interchange and fanling, the central - wanchai bypass and the island eastern corridor link, improvement to island eastern corridor between causeway bay and north point, central kowloon route, widening of gascoigne road flyover, route 4 between kennedy town and aberdeen and retrofitting of noise barriers on 8 existing road sections. hk - zhuhai - macao bridge hk project management office

    而籌劃中的項目有屯門公路市中心段交通改善工程屯門公路重建及改善工程舊政務司官邸附近道路交匯處與粉嶺之間的吐露港公路粉嶺公路擴闊工程中環及灣仔繞道和東區走廊連接路銅鑼灣至北角的東區走廊改善工程中九干線加士居道行車天橋擴闊工程四號干線堅尼地城至香港仔及加建隔音屏障工程於八條現有道路。
  2. Essential strategic transport infrastructure, including central - wan chai bypass, island eastern corridor link, road p2, north hong kong island line, and connection for the fourth rail harbour crossing section of the shatin to central link

    建造必需的策略性運輸基礎設施,包括中環灣仔繞道、東區走廊連接路、 p2路、北港島線,以及沙田至中環鐵路線過海線段(第四條過海鐵路)的接駁道路
  3. To provide land for central - wan chai bypass and island eastern corridor link

    提供土地建造中環及灣仔繞道和東區走廊連接路
  4. The wdii will provide land to build a sound road network comprising the central - wan chai bypass, the island eastern corridor link, the mtr north hong kong island line, a fourth cross - harbour rail tunnel and other roads

    灣仔發展計劃第二期工程將提供土地用作建設道路網,包括中環灣仔繞道東區走廊連接路地下鐵路北港島線第四條海底鐵路隧道和其他道路。
  5. This project together with central reclamation phases i, ii and iii will mainly provide land for the construction of the central - wan chai bypass and the island eastern corridor link, the hong kong island section of the shatin to central link and the north hong kong island line

    這計劃會連同中環填海計劃第i ii及iii期,主要提供土地興建中環及灣仔繞道和東區走廊連接路沙田至中環線鐵路港島段及北港島鐵路線。
  6. Central wan chai bypass and island eastern corridor link

    中環灣仔繞道及東區走廊連接路
  7. Central - wan chai bypass and island eastern corridor link

    中環灣仔繞道和東區走廊連接路
  8. Date central - wan chai bypass island eastern corridor link

    中環灣仔繞道和東區走廊連接路
  9. Cwb is a strategic road linking the rumsey street flyover with the island eastern corridor via the island eastern corridor link

    中環環仔繞道是一條非常重要的道路,可經由東區走廊連接路把林士街天橋和東區走廊連接起來。
  10. The central - wanchai bypass " cwb " is a strategic road linking the rumsey street flyover with the island eastern corridor via the island eastern corridor link

    中環環仔繞道是一條非常重要的道路,可經由東區走廊連接路把林士街天橋和東區走廊連接起來。
  11. The cwb will link rumsey street flyover in the west and the island eastern corridor in the east via a new island eastern corridor link to form a relief route to connaught road central harcourt road gloucester road on hong kong island

    -中環灣仔繞道會經由東區走廊連接路,把西面的林士街天橋和東面的東區走廊連接起來,以紓緩港島干諾道中夏道告士打道的交通。
  12. This would replace the previously proposed lantau north south road link between tai ho wan and mui wo, which was found to have an unacceptable environmental impact. other major road projects under planning include the central - wan chai bypass and island eastern corridor link, route 7 between aberdeen and kennedy town, and route 10 between the yuen long highway and north lantau

    其他規劃中的主要道路工程,包括中環灣仔繞道和東區走廊連接路、七號干線香港仔至堅尼地城段,以及十號干線(元朗公路至北大嶼山段) 。
  13. The wan chai development phase ii reclamation scheme was gazetted under the foreshore and sea - bed ( reclamations ) ordinance. also, the associated roads, including road p2 and the central - wan chai bypass - island eastern corridor link trunk road, were gazetted under the roads ( works, use and compensation ) ordinance

    灣仔發展計劃第二期填海工程根據《前濱及海床(填海工程)條例》在憲報公布,而有關的道路,包括p2路及中環灣仔繞道東區走廊連接路亦根據《道路(工程、使用及補償)條例》在憲報公布。
  14. The island eastern corridor the eastern end of the cwb the island eastern corridor link

    東區走廊中環灣仔繞道的東端及東區走廊連接路。
  15. The 10. 5 billion us 1. 35 billion central - wan chai bypass and island eastern corridor link

    耗資105億元13 . 5億美元的中環灣仔繞道和東區走廊連接路
  16. The $ 10. 5 billion ( us $ 1. 35 billion ) central - wan chai bypass and island eastern corridor link

    耗資105億元( 13 . 5億美元)的中環灣仔繞道和東區走廊連接路;
  17. Central - wan chai bypass and island eastern corridor link is currently planned for completion by 2010 because of the unavailability of land

    因用地缺乏,中環灣仔繞道和東區走廊連接路現計劃於2010年前建成。
  18. " to bring urgent relief to traffic congestion, the only feasible and environmentally acceptable way is to construct the four - kilometre - long central - wan chai bypass through the reclamation, and enhance the existing road network. " the new link will connect the rumsey street flyover with the island eastern corridor via the island eastern corridor link

    要減輕這些道路的負荷,唯一可行的方法,是在中區現有的海岸線以外,透過填海提供土地,興建長達4公里的中環-灣仔繞道,連接林士街天橋和東區走廊,同時強化現有的道路網,疏導交通。
分享友人