key rock 中文意思是什麼

key rock 解釋
標準層
  • key : n 1 鑰匙。2 要害,關口,要沖。3 關鍵,線索,秘訣;解法。4 (外國書的)直譯本,圖例,題解,圖解,...
  • rock : n 1 巖,巖石,磐石,巖壁;卵石;〈常 pl 〉〈美口〉石子兒;暗礁,巖礁。2 〈the R 〉直布羅陀 (Gibr...
  1. Edge of the granule image by video is the key of its image partition, the article tries to carry through a deeper research on image partition at the same time. granule is made up of savageness mater and industry material ( including of rock, sand, earth, atomy, steel, china, concrete, ink powder, magnetism powder, light fine and tiny powder used silicon, cell etc. )

    顆粒是構成天然物質和工業材料(巖石、礦石、沙子、泥土、塵埃、鋼鐵、陶瓷、水泥、墨粉、磁粉、光纖和料封裝材用高純硅微粉、細胞等)的基本單元,顆粒尺寸(粒度)是顆粒的首要特徵和粉體材料的第一指標。
  2. Stability of rock slopes is generally controlled by the structure of rock masses, especially the soft structure surfaces. analysis of rock mass structures is a key to establish geological models and numerical simulation and a foundation to assess the stability of rock slopes. the weak structure surfaces are mainly bedding planes, faults, joints, schistosity plane and contact zones of intrusive bodies. since they are different in genesis and scale, the rock masses are different in features and mechanical intensities. based on the combination of rock structure bodies, 15 basic modes of deformation and failure of rock slope are systematically summarized. the deformation and failure of rock masses actually result from the recombination and rearrangement of these rock bodies. there are 11 types of rock mass structures and various deformation and failure of bank slopes are present in the reservoir area of the three gorge project

    巖體結構,特別是軟弱結構面對基巖斜坡變形與破壞具有顯著的控製作用,巖體結構模式分析是建立斜坡地質模型和數學模型的關鍵和評價斜坡穩定性的基礎。巖層層面斷裂構造節理裂隙片理與劈理以及侵入體和圍巖的接觸帶等是控制基巖斜坡穩定的軟弱結構面,這些成因不同大小不一的結構面將巖體分割成性質各異力學強度不均的各種巖體結構體,構成了15種基巖斜坡變形破壞的巖體結構基本模式。不同結構體的重新組合與排列是斜坡失穩的內在原因。
  3. The research of large igneous rock province - ermei basalt extrusion - mantle plume shows that songpan - ganzi folded belt is a hopeful target for breakthrough of petroleum exploration, and the key issue is how to make well a coupling and optimization among its faults, structures, traps and reservoirs

    根據地震測深、重、磁、電等的探查,發現該褶皺帶深部有一低速高導層,而對大火成巖省峨眉玄武巖噴溢地幔柱的認識深化均表明,四川松潘甘孜褶皺帶是可望獲得油氣勘探突破的靶區,重要的是斷裂構造、圈閉、儲集層的耦合與優化。
  4. This paper introduces the latest progress of high level radioactive waste disposal programs in the world, and discusses the key scientific issues as follows : ( 1 ) the precise prediction of the evolution of a repository site ; ( 2 ) the characteristics of deep geological environment ; ( 3 ) the behaviour of deep rock mass, groundwater and engineering material under coupled conditions ( intermediate to high temperatures, geostress, hydraulic, chemical, biological and radiation process, etc ) ; ( 4 ) the geochemical behaviour of transuranic radionuclides with low concentration and its movement with groundwater : and ( 5 ) the safety assessment of disposal system

    在介紹國內外最新研究進展的基礎上,重點討論高放廢物地質處置的若干關鍵科學問題:處置庫場址地質演化的精確預測、深部地質環境特徵、多場耦合條件下(中(高)溫、地殼應力、水力作用、化學作用、生物作用和輻射作用等)深部巖體、地下水和工程材料的行為、低濃度超鈾放射性核素的地球化學行為與隨地下水遷移行為及處置系統的安全評價。
  5. The key state - level scenic spot ? simianshan mountain combines the landscape of mountains, laks, rivers, forests and waterfalls with magnificence, peculiarity, serenity and steepness. it is the only one subtropical lrsadleaf wildwood at the same latitude. it has the highest waterfall with a height difference of 152meters ? wangxiangtai waterfall ( a platform to overlook the hometown ), ranking one 12 new scenic spots of chongqing. bexides, it has rock frescos with the hetght of 9 meters and the length of 163 meters

    國家重點風景名勝區?四面山集山、水、林、湖、瀑於一體,融雄、奇、幽、險、秀於一身,是地球同緯度僅存的一片亞熱帶原始常綠闊葉林;有高距為152米的神州第一高瀑?望鄉臺瀑布,為重慶新巴渝十二景之一;有長163米、高9米的灰千巖摩崖壁畫;有「天下第一切工作奇聯」等。
  6. 3d numerical simulation of impact of key fault and fault enhancement on foundation rock mass of guangzhao high gravity dam

    光照重力壩壩基斷層影響及處理的三維數值模擬
  7. Based on the analysis of sedimentary facies in individual wells and the correlation of three cross sections of sedimentary facies, it is elaborated that sedimentary facies of jianglingjiang formation are vertically and laterally developed within qianwei area. by the method of single - factor analysis, it is pointed out facies distribution of four key formations after thorough study of four geologic factors that could embody sedimentary environment and facies, that is the thickness of formation, grainstone and dolostone, and lithofacies. with the above results, combining with reservoir and structural features, of which the emphasis is the reservoir characteristics of different rock and microfacies types, it is pointed out favorable reservoir zones, by the method of multi - factors superposition

    採用單因素分析法,選取並研究地層厚度、顆粒巖厚度、白雲巖厚度和區域巖相等四種能反映沉積環境和沉積相的地質因素,指出了四個重點層段的沉積相平面分佈特徵;根據沉積相的研究成果,結合儲層特徵和構造發育特徵,著重討論了不同巖石類型和微相類型的儲集特徵,採用多因素疊合法對犍為地區嘉陵江組有利儲集相帶進行了預測,指出了有利儲集相帶的分佈。
  8. Research on key blocks in the surrounding rock mass of underground powerhouse, the three gorges project

    三峽工程地下廠房圍巖關鍵塊體研究
  9. On the basis of appraising a traditional method, the method of the stereographic projection and proportionally stereographic projection of a solid volume, this paper has introduced such methods as determination of dominant discontinuities, kinematic tests for rock - mass failure modes, geometrical judgment of a removable block, and determination of a key block, extending perfecting the traditional method, and thus making it has better suitability or availability and practicality

    摘要本文在評價用傳統方法即赤平極射投影和實體比例投影方法分析節理邊坡穩定性的基礎上,結合具體工程實例引進了優勢結構面的確定、巖體破壞模式的運動學判釋、可移動塊體的幾何判定和關鍵塊體的確定等方法,使傳統方法得到拓寬和完善,從而具有更好的適用性和可操作性。
  10. ( 3 ) p and s wave velocity and dynamic & static modul of sand rock in huanhua basin are the first time measured using " mts rock physical parameter testing system under formation condition " of " state key laboratory of oil and gas reservoir geology and exploitation ". at the same time, relationship between seismic response and oil & gas is discussed and summarized

    ( 3 )利用「油氣藏地質與開發工程」國家重點實驗室mts巖石物性測試系統,首次對黃驊坳陷砂巖進行了高溫高壓下的縱、橫波速度及動彈模量的測定,對黃驊坳陷砂巖的地震響應與油氣關系進行了分析和總結。
  11. With the continuously expanding of seismic exploration in the basin, it is carried out to tackle key problem of mountainous seismic technology, based on the old data analysis and exploration experience, through implementing a series of measures including observation system design aimed at the target, fine investigation for surface structure, sampled parameters test, well depth design by selecting rock and bed and other acquisition techniques, a series of more mature exploration technique suited for complex mountainous region has been developed and the break through has been made its quality of data acquired field, providing the strong technique support for petroleum exploration in complex mountainous region

    隨著盆地地震勘探的不斷深入,在總結,分析以往資料和勘探經驗的基礎上,在該區進行了山地地震攻關,通過針對目標的觀測系統設計,精細的表層結構調查、科學的採集參數試驗、選巖選層的井深逐點設計及其他相應的採集技術措施,形成了一系列比較成熟的復雜山地勘探技術,在野外採集資料品質方面取得了突破性的進展,為復雜山地的油氣勘探提供了強有力的技術手段。
  12. On the base of foreign countries ' experiences in the expressway rock slope green design and in terms of ecological landscaping design principles, the paper set forth the basic design principles for the green design, i. e. first of all to ensure stabilized safety rock slope with engineering measures, followed by green vegetation planting of different kinds of plants, including local and naturalized plants, to be in harmony with the local landscape and capable of stabilizing the side slope, with detailed description of the key points of the design

    在國外高速公路巖石邊坡綠色設計經驗的基礎上,從生態景觀角度出發,提出了寧杭高速公路東蘆山巖石高邊坡綠色設計以確保穩定的巖石邊坡為前提然後使用多種與周圍環境融洽的本地或歸化植物來維護和改善生態環境的設計原則和設計內容,並詳細說明了其設計要點。
  13. With the rapid development of the constructions in western china, the research on the design and building technology, the quality control and the evaluation parameters of high rock - filled embankment has been one of the key technologies in highway building in mountainous areas

    隨著我國西部建設的高速發展,高填石路堤的設計、施工技術及其質量控制方法和評價指標的研究已成為山區高等級公路面臨的關鍵技術之一。
  14. 3. solve the key problem during the 2d engaging design of the tri - cone rock bit. if you move or rotate any insert with mouse, the other two inserts in the same cycle change same positions

    解決了三牙輪鉆頭二維嚙合設計中的關鍵技術?聯動布齒,通過鼠標移動和旋轉任意一個牙齒,同一齒圈上的其它兩個牙齒做相同的位置變動。
  15. The famous project of gas transiting west to east and the cross - river tunnel of huangbu river in shanghai also will be constructed with this technique, which is under the plan. among the shield tunneling methods, up to now, earth pressure balanced shield tunneling ( epbs ) is the most universal type, and it is very certain that the epbs method adopt to our country increasingly. the key factor to success in epbs is converting the muck which is lack of fluidity excavated from the cutter face to the plasticity soil. but when the shied tunneling machine advancing, it is considerably difficult to reach this requirement because of the ground soil condition, which is consist of stiff clay, silt, weathered rock, and so on

    近些年來我國城市地鐵建設迅速發展,盾構施工法作為一種安全而又環保的施工方法得到了廣泛的使用,另外在黃浦過江隧道,西氣東輸的穿黃隧道等工程也在使用盾構隧道施工技術。這其中土壓平衡式盾構在我國的使用最為普遍,成為地鐵隧道施工技術的主流。土壓平衡式盾構施工成功的關鍵是要將開挖面切削下來的土體在壓力艙內調整成一種「塑性流動狀態」 。
  16. Combined with the engineering practice of small interval tunnel in china, this paper points out its five key technology problems : its concept, reasonable clear interval, support parameter, construction method and strengthening technology for the shamed surrounding rock

    摘要結合國內小凈距隧道建設現狀,筆者認為其設計施工關鍵技術主要在於小凈距隨道的合理凈距、支護參數、施工方法、中夾巖加固技術等。
  17. Therefore, in the process of load transfer within the unconsolidated confined aquifer, the key strata of overburden rock are prone to have a compound breakage when the load on the upper interface of bedrock is great and the bedrock is very thin

    在鬆散承壓含水層的載荷傳遞作用下,作用在基巖頂界面的載荷較大,當基巖厚度較薄時,采場覆巖關鍵層易產生復合破斷。
  18. The example analysis indicates that the compound key strata objectively exists in the motion of rock strata, and it plays a much more important controlling role than that of single rock, which is separated from same rock groups

    實例分析表明,復合關鍵層在巖層運動中是客觀存在的,比同組巖層分開后的單一巖層的控製作用的線性疊加要大得多。
  19. Displacement back analysis and optimum design of excavation subsequence in underground engineering are important to reliability analysis of surrounding rock and detail design. in underground engineering the method to determine initial ground stress and mechanical parameters of surrounding rock mass and excavation subsequence is key problem to design and study

    地下工程位移反分析及開挖順序優化設計是地下工程圍巖穩定性分析與施工設計的重要內容,探討地下工程圍巖初始地應力與力學參數以及其開挖施工順序的確定方法是目前地下工程設計與研究的關鍵問題。
  20. Viscoelasticity analysis and application of key strata of covering rock to short wall mining

    短壁開采覆巖關鍵層黏彈性分析與應用
分享友人