latest finish 中文意思是什麼

latest finish 解釋
最晚完成
  • latest : adj (late 的最高級)最遲的,最後的;最近的,最新的。 the latest fashion 最新式樣。 the latest ne...
  • finish : vt 1 完畢,完成,結束;使…畢業,使…卒業。2 磨光,【機械工程】給…拋光;給…最後加工;潤飾,修整,整...
  1. Secondly, we propose a heuristic schedule algorithm based on deadline and survivability, taking the latest finish time of application assigned by users as a qos example

    第二,以「用戶指定的其所能容忍的應用程序完成的最晚時間」這種qos為例,給出了一種基於deadline和生存性的啟發式調度演算法。
  2. Embossed with floral motifs, with heavy duty welting of more urban city - style finish, these are the latest creations from this firm

    壓有美觀的花朵圖案,並帶大量凸飾,風格極為都市化的鞋大底,這些是該司的最新款式。
  3. I will start to work by next monday at the latest, because i will hand in my resignation to my boss, in addtion, i am going to finish my current work and hand over other some work to my colleagues

    我最晚會在下周一來公司上班,因為我要遞交辭職書給老闆,另外還要處理完當前的工作,並將一些工作移交給同事。
  4. Our leading products are polished steel shafts, which are at the highest level in the industry in terms of their straightness, surface finish, form, workability, etc. employing the latest it, we have constructed a production management system that allows us to control both in - house and external operations to improve our response to customer needs

    回應客戶所有要求的方式是開發尖端股份商品。對主力產品拋光軸的要求,精度,真直度,表面肌,形狀,被加工性等方面,本公司在業界具有最高水準。不論公司內還是公司外,通過it構築生產管理系統並回應客戶的需要。
  5. Firstly, we use the algorithm of the least cost scheduling in network plan. and a useful heuristic model described as the latest finish time model for resources scheduling is selected to solve the resource optimization, which based on investigation of heuristic methods of resource - constrained activity network

    首先對網路計劃進行工期? ?費用優化,然後基於對多資源約束網路計劃的啟發式方法分析的基礎上,選擇一種簡捷實用的啟發式方法? ?最遲完成時間( lft )判斷法,對網路計劃進行多資源綜合協調。
  6. The paper explains the process of an integrated expert system application in micro - irrigation using gathered rainfall in hilly mountain areas. the expert system is developed by the latest computer language, and uscs microsoft visual basic 6. 0, autocad 2000, microsoft excel and microsoft access software it sufficiently uses the features of these software, such as visual programme, cad drawing and database management and so on. and it can automatically finish the design and project of the micro - irrigation engineering according to the detail requirements

    該系統集成了visualbasic 、 visualc + + 、 autocad 、 microsoftexcel 、 microsoftaccess等應用軟體,充分利用了vb和vc的可視化編程、 cad繪圖、 excel電子表格、 access數據庫等相應特點,並結合雨水集蓄條件下微灌系統規劃設計要求,實現了微灌工程規劃設計的自動化。
  7. The project plan ' s critical path is the sequence of tasks that ends on the latest finish date

    項目規劃的「關鍵路徑」是指在最後完成日期結束的任務間的順序。
  8. * * * * your project ' s finish date is determined by the latest finish dates of its tasks

    因為項目的完成日期由其任務的最後完成日期決定,而這些完成日期又受完成任務所需時間的影響。