layout area 中文意思是什麼

layout area 解釋
藍圖區;詳細規劃區
  • layout : 安放,布置,劃線
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. In the entitative routing stage, the macro - cell layout must be compressed for optimization area and time delay. it should be compared beauty with the routing result by manual. an algorithm, which is gridless, variable widths and minimizing layer permutation, is advanced for channel region

    晶體管級實體布線階段,由於庫單元的復用性,要求庫單元版圖緊湊,即要求單元版圖在滿足各約束條件的前提下面積、性能優化程度較高,能與手工設計的版圖相媲美。
  2. According to the diagnoses of agricultural pollutant kinds, quantity and extent in taizhou, applying the systems engineering theory, using the prevention and cure experiences of advanced area for reference, the synthetic prevention and cure countermeasures of agricultural pollution are excogitated which include administrate mechanism, restraining technology, rule of law, scientific layout and devoted mechanism etc

    摘要本研究在調研分析泰州市農業污染源種類、數量及污染程度基礎上,剖析了農業污染的現狀,應用系統工程原理,借鑒先進地區的治理經驗及做法,從防治的管理機制、控制技術、法律法規、科學規劃以及投入機制等五個方面,組裝集成了農業污染綜合防治的對策。
  3. Located in the junction of hexi avenue and taishan road, xincheng international mall, covers floorage of 300, 000 sq. m. with a total building area of nearly 180, 000 sq. m. ( 18 hectares ) in the layout

    新城國際商城位於河西大街與泰山路的交界處,總規劃建設用地近18萬平方米(約270畝) ,總建築面積約30萬平方米。
  4. Paragraph of time, the physical - training teacher educating a branch to organize implement new class bid to middle and primary school reforming condition making an investigation, indicate on inquiry in the front, scale is small since a little school running a school, a little rural area elementary school, does not move space especially, be not enough to pay attention to waiting a minute or to physical training, do not have very good according to that new class switches over to demand to open enough physical education, since entering the higher school the system restraint, a little school defies student sports activities and good health, physical education birthplace having some of higher class with the method of work " resorting to fraudulence ", go ahead culture class within outside row physical education, at present major middle and primary school stadium field layout, equipment and material facilities are obsolete, short - supplied, foundation has no way to ensure that regular sports of school is flexible carrying out, is difficult to say material request adapting to new class more

    前段時間,教育部門組織體育教師對中小學實施新課標改革情況進行調查,調查表明,一些學校由於辦學規模小,特別是一些農村小學,沒有運動場地,或者對體育鍛煉不夠重視等等,沒有很好地按照新課改要求開足體育課,由於升學制度的制約,一些學校無視學生體育活動和身體健康,有些高年級的體育課貫用「偷梁換柱」的做法,外排體育課,內上文化課,目前多數中小學體育場地布局、器材設施陳舊、緊缺,根本無法保證學校正常的體育活動的開展,更難以說適應新課材的要求。
  5. A new planning method - analysis of factors of point line and area and control points optimization, which is based on the analysis of urban spatial structure, is tried to put forward. analyzing the important functional clusters in the spatial layout of the urban, the intracity medium - long distance vehicle traffic major directional desire line how the urban to link up with the highway network and the whole structure of expressway system, the skeleton of the expressway network can be obtained. using the degree of importance method analytic hierarchy process ( ahp ), one or several intersections can be selected

    該法對城市空間結構布局中的重要節點、主要的中長距離機動車交通流徑期望線的分佈、大城市與區域干線公路網的銜接以及快速路系統線網的整體結構等進行分層次的分析研究,得出快速路系統線網構架,運用重要度法、層次分析法找出大城市重要功能組團中重要程度最高的一個或數個關鍵交叉口作為快速路系統線網規劃的控制點,考慮快速路線路走向的控制點對線路走向進行優化。
  6. The content of the study as follow : 1 to choice the ship form, mainly ship ' s overall size ; draft, according to design of shanghai deep - water port and development of container ; 2. to deside the date of width ; depth ; path ; tract and sinkage through simulator tests ; 3. to replenish and modify some date for channel design to very large container vessels in " design code of general layout for sea port " 4. to study ship ' s turning area ; ship ' s stop distance the new and special content of the study as follow : 1. statistics of path at the channel given by difference operators with the affections certain wind. currents. seas and other influences shows the path really needed under certain condition

    並可在各類航道和水域的通航安全評估及操船方法,航跡帶寬度,航道寬度,航跡帶分佈,船舶各種航行狀態時的下沉量研究中應用。本課題研究的內容: ( 1 )根據洋山深水港設計規劃和集裝箱船舶的發展趨勢,通過研究、分析、比較,選擇最合適的船型,尤其是船舶主尺度和船舶吃水。 ( 2 )在大量模擬研究情況下,得出進港航道所需的航道寬度和深度。
  7. While the brother was speaking with his co - workers about a new layout, the exhibition s organizer unexpectedly removed two wooden walls around the stage area that had been blocking the view of master s picture. this change created a much more open view of the tainan center s display so that even from a distance people could see master s large, magnificent photo, and the crowds congregating in front of the stage could conveniently access the booth

    師兄與工作人員協商移動位置后,主辦單位竟然也把舞臺區的兩面木墻拆了,我們攤位的視野剎時豁然開朗,來往人群在遠處就可看到師父美麗莊嚴的大法相,舞臺區聚集的人潮常順便來到我們的攤位叄觀。
  8. The site was enlarged to include the adjacent former new astor hotel site and rezoned to " comprehensive development area 1 " on the draft tsim sha tsui ozp gazetted on october 17, 2003. revised master layout plan approved with conditions by the ctpur under the delegated authority of the tpb on june 23, 2004. construction in progress

    有關地盤的范圍被擴大,以便把毗鄰的前新雅圖酒店所在地(載於二零零三年十月十七日刊憲的尖沙咀分區計劃大綱草圖)包括在內;該范圍在該草圖上,亦已改劃為綜合發展區( 1 )地帶。
  9. Abstract : the author introduces such basic status of the community shopping centers in pudong new area as the development course, the layout of the formats and the function of serving the neighborhoods, and the view points upon the existing problems and the development trend as well

    摘要:介紹浦東新區社區購物中心的發展過程、業態分佈等基本情況,及其發揮功能和服務居民的作用,對存在問題和發展趨勢也提出了看法。
  10. Water - drawing project of taohe river, productive forces layout of mid - area of gansu province and sustainable development

    引洮工程與甘肅中部地區生產力布局和可持續發展
  11. Layout is an important part of the sea reclamation works, which consists of for kinds of rational layout of the exploitation of the embanked area, the irrigation and drainage works, the sea exploitation work schedule and the silt acceleration work schedule. not only are the four kind layout works interrelated and interrestricted, but also they come down to many natural and society factors

    圍海工程規劃是圍海工程重要組成部分,圍海規劃由圍區土地合理開發利用規劃、圍區排灌工程規劃、圍塗開發進度規劃和圍塗的促淤進度規劃組成,這四部分的內容不僅相互聯系又相互制約,而且還涉及到眾多的自然因素和社會因素。
  12. In the base of essential datum and basic analysis, the article raises a general layout program in the third chapter, including : activity capacity layout, storage area, platform of receiving and delivering goods and activity area project, routing of drug out and in warehouse and supplement

    在藥品基本資料分析的基礎上,給出了物流中心的總體規劃策略及方案,主要包括:存儲區、收發貨平臺和辦公區的平面區域規劃策略及方案,藥品出入庫以及補貨的動線規劃和系統作業能力分析。
  13. Minor layout area

    小型藍圖區
  14. The traditional bandgap reference circuit was improved in the design, which includes the applying of self - bias structure and cascode structure, output of the opamp was used as self - bias voltage, saving bias circuit, and then it was helpful to get low power consumption. through using poly resistance of high value with low temperature coefficient, we reduced the influnce to circuit, if power supply did not change, we must decrease operating current to decrease power consumption, and increasing value of resistor could decrease the operating current efficiently. poly resistance of high value had large value of squared resistor, so we could save layout area

    對傳統帶隙基準電路進行了改進設計,採用自偏置結構和鏡像電流鏡結構,利用運放的輸出電壓作為運放的偏置電壓,節省了偏置電路,降低了功耗;使用低溫度系數的多晶硅高值電阻,降低了電阻溫漂對電路的影響;在電源電壓不變的情況下,為了減小功耗就必須減小工作電流,而增大電阻的阻值能有效地減小工作電流,多晶硅高值電阻的方塊電阻很大,可以節省版圖面積。
  15. The total layout area is nearly 3. 5 squar rilometers, the first - phase area of 400, 000 square meters has been arranged with projects, up to now numbers of enterprises have invested and built plants here

    規劃總面積約3 . 5平方公里一期約40萬平方米基礎設施建設已經完成,目前已有數十家企業入駐。
  16. Structure that specifies the maximum layout area for the text

    結構,它指定文本的最大布局區域。
  17. Within the specified layout area

    繪制時,測量指定的字元串。
  18. At last, the layout area is transferred to optimization layout model so as to get layout sense by computing models

    通過計算模型獲取擺放區域,然後傳給優化擺放得到場景結果。
  19. Located in the picturesque coastal sightseeing area, the community occupies 110, 000 m2 layout area. it meets the need of residents studying, relaxation, sports and recreation, etc. the whole project was completed in december, 2003

    海昌欣城位於黃海之濱旅遊風景區海之韻廣場附近,規劃用地11萬平方米,總建築面積34萬平方米,可滿足人們居住學習休憩運動娛樂的需要。
  20. In the process of design, the thesis using the circuit structure of inverter series within memory cell, and sharing read and write ports within multi - bit for the first time, solves dominoes effect for driving multi - read port problem, and reduces layout area of double - memory cell for about 40 %, respectively

    在設計過程中,首次對位單元採用反相器級聯的電路結構,解決了由於驅動多讀出埠問題引起的電路驅動多米諾效應;首次採用了多位共享讀寫埠的電路結構,減小了雙存儲體40 %的版圖面積。
分享友人