length for displacement 中文意思是什麼

length for displacement 解釋
排水量船長
  • length : n. 1. 長,長度,長短。2. (時間的)長短,期間。3. (賽艇的)一艇的長度;一馬的長度。4. 程度,范圍。5. 【板球】球程;投至適當距離的球。6. 【語言學】音長。7. 一段,一節。
  • for : FOR f o r = free on rail 【商業】火車上交貨(價格)。1 〈表示目標、去向〉向,往。 leave [sail] f...
  • displacement : n 1 轉位,移動;取代,置換;(人的)流離失所。2 撤換,免職。3 【機械工程】(活塞)排氣量;【航海...
  1. The analysis of precision about mould - cut main mechanism with clearances is advanced. on the basis of analysis of slider displacement error influenced by the crank length tolerance, the coupler length tolerance and clearances in revolute joints for mould - cut main mechanism, some reasonable suggestions about tolerance distribution of bars length and fitting precision of joints are put forward

    考慮運動副間隙對主切機構進行了精度分析,通過分析主切機構中各桿長誤差和運動副間隙對滑塊位移誤差的影響,對商標模切機設計初期桿長誤差分配和運動副間隙配合精度提出了合理的建議。
  2. Uss lexington cv - 2 length overall : 270. 8m beam max : 39. 7m hull : 32. 2m displacement standard : 41187t full load : 43054t the lexington, was originally designated cc - 1, laid down as a battlecruiser 8 jan 1921 quincy, massachusetts. authorized to be completed as an aircraft carrier 1 july 1922, commissioned 14 december 1927. on 7 december 1941, lexington based at pearl harbor, when word of the japanese attack on pearl harbor was recevied, she immediately launched searchplane to hunt for the japanese fleet

    1927年12月14日開始進入美國海軍序列服役。 1941年12月7日,以珍珠港為基地的列剋星敦號收到母港遭到襲擊的消息,她立刻派遣偵察機搜索日本艦隊。 1942年5月7日,列剋星敦號的艦載機擊沉了日本輕型航母祥鳳號。
  3. Uss gato ss - 212 1941 length overall : 95. 0m beam : 8. 3m displacement : 1825 t the first gato was laid down 5 oct 1940 by the electric boat co., and commissioned 31 december 1941. gato departed 16 february 1942 for pearl harbor via the panama canal and san francisco

    美國海軍小鯊魚號潛艇ss - 212 1941全長: 95m寬: 8 . 3m排水量: 1825t小鯊魚級潛艇的首艦於1940年10月5日在電船公司開工建造,並於1941年12月31日進入美國海軍服役。
  4. Uss gato ss - 212 1944 length overall : 95. 0m beam : 8. 3m displacement : 1825 t the first gato was laid down 5 oct 1940 by the electric boat co., and commissioned 31 december 1941. gato departed 16 february 1942 for pearl harbor via the panama canal and san francisco

    美國海軍小鯊魚號潛艇ss - 212 1944全長: 95m寬: 8 . 3m排水量: 1825t小鯊魚級潛艇的首艦於1940年10月5日在電船公司開工建造,並於1941年12月31日進入美國海軍服役。
  5. Through the calculating example results and the comparisons with other calculating theories, it is proved that the calculating formulas of the combined geometry curve theory is valid, practical and accurate. it can be used in the calculation of line shape at the preliminary design, and can meet the engineering need. ( 3 ) this thesis researches systemically on the calculating theory of the suspension bridge ’ s cable system, including calculating design line shape and internal force, erection line shape of cable and pre - displacement of saddle without loads, the fixed position for erecting cable and amendatory method of cable ’ s unstressed length

    通過算例驗證了混合線形理論公式的實用性和正確性,並且與其它計算理論的結果比較,證明公式有足夠的精度,可用做初步設計中主纜線形的計算,能夠滿足工程的需要; ( 3 )對自錨式懸索橋主纜系統計算理論進行了系統研究,包括成橋線形和內力計算、空纜線形和內力計算、鞍座預偏量計算、索夾安裝位置計算和索鞍處主纜無應力長度修正方法。
  6. Secondly, calculation theory of construction for suspension bridge is presented under the ideal condition of dead load design. linetype change stiffness of cable and slip stiffness of supporting points are deduced based on segmental catenary theory. then numerical analysis method through sgkz2000 software are introduced in detail about calculating design linetype for suspension bridge, unstressed length of cable, erection linetype of cable and pre - displacement of saddle without loads, erection linetype of wire strands, the fixed position for erecting cable band and linetype of lifting stiffening girders

    其次,根據懸索橋恆載設計理想狀態建立了懸索橋施工計算原理;以分段懸鏈線索理論為基礎,推導了懸索的線形變化剛度和懸索支點的滑移剛度;介紹了懸索橋成橋設計線形計算、吊索無應力長度計算、空纜線形與預偏量計算、絲股架設線形計算、索夾安裝位置計算和加勁梁吊裝線形計算的具體方法、數值演算法及軟體sgkz2000的計算模塊的實現。
  7. This paper also presents the methods of controlling unstressed length of cable, pre - displacement of saddle, anchor span tension, erection of wire strands, the fixed position for erecting cable band and cable length. determination and control approach of displacement of saddles during cable erection are also introduced. at the same time, the change course of linetype during construction period for suspension bridge is analyzed

    再次,介紹了懸索橋的施工控制內容與方法,利用軟體sgkz2000對多座懸索橋進行了施工計算,提出本文關于懸索橋的主纜無應力長度控制、索鞍預偏量控制、錨跨張力控制、絲股架設控制、索夾安裝位置與吊索長度控制的方法;介紹了吊梁階段鞍座頂推量的確定與控制方法,分析了施工階段懸索橋的線形變化過程。
  8. In this paper, the three level fortification criterion, two stage design method and the elastic response spectrum theory are adopted, and the program of nba ( the program of nonlinear - aseismic analysis for beam bridge ) is used to calculate. through gathering, analyzing and calculating a lot of bridge design materials, this paper induces a simple way to calculate the relative displacement of the beam and the pier, and then according to the current design method, it concludes a better design principle of the supporting length of the beams. at the same time the dynamics is adopted to put forward the design method of the carrying capacity and the lengthen of prestress wire ( steel bar ) falling - off prevention structures of highway bridges

    本論文採用三水準設防、兩階段設計方法、彈性反應譜計算理論,運用橋梁結構非線性地震響應分析程序nba ( theprogramofnonlinear ? aseismicanalysisforbeambridge )進行計算;通過收集大量的實橋設計資料,經分析計算,歸納總結出計算上下部結構相對位移的簡便計算方法;並綜合國內外的經驗值,提出梁的支承長度se的設計原則;同時運用動力學突加荷載的原理,推導分析了預應力鋼絞線式(鋼棒連接式)落梁防止裝置設計承載力的計算方法和設計伸長量s _ f的取值;最後本文通過實橋計算,說明了落梁防止系統設計的方法。
  9. The next this text is based on the appearance theories, according to the characteristics that the temperature dispersion of super thick mass concrete planceer of high - rise building primarily is an even difference in temperature and an even constringency, suppose the level shears are line with the displacement, adopting a big physical volume concrete of planceer in flexibility foundation for plank computing model, from theoretically deducing the difference in temperature of mass concrete contracting should basic formula of dint, and analysis the crack rule and the influence factor of mass concrete temperature contract, and bringing up the theory calculation method about temperature stress of mass concrete and the biggest whole method that sprinkle the length, at the same time according to basic formula of the temperature stress of mass concrete and the concrete construction experience, bringing five technique measures to prevent the temperature crack of mass concrete

    其次本文以唯象理論為基礎,根據高層建築超厚底板大體積混凝土承受的溫差主要是均勻溫差和均勻收縮的特點,闡述了大體積混凝土溫度應力理論計算的簡化方法和最大整澆長度的計算方法,同時根據大體積混凝土溫度收縮應力基本公式和大體積混凝土結構施工經驗,提出了防止大體積混凝土溫度裂縫的五項技術措施。最後本文以廈門郵電大廈3 . 5m超厚底板施工為實例,從大體積混凝土溫度應力計算、混凝土保溫材料厚度計算、混凝土配合比的確定,鋼筋工程、模板工程、混凝土的泵送和澆築以及大體積混凝土內部溫度的監測和後期養護等方面進行了理論應用。
  10. Automatic tester for dial gauges is an intelligent instrument unified mechanism light and electronic. the grating displacement sensor that has high accuracy ( length gauge ) and camcorder is image sensor consummately automatic sampling is adopted. it is controlled and handled data by computer. so it has realized the intelligence and automation of calibrating course. the instrument has features of high precision, efficiency, flexible and convenient in operation, and so on

    指示表自動檢定儀是機、光、電一體化的智能化儀器,採用了具有高精度的光柵位移傳感器(長度計)和ccd攝像機作為圖像傳感器完成自動采樣,用計算機進行控制與數據處理,從而實現了檢定過程的自動化和智能化,使儀器具有高精度、高效率、操作靈活、使用方便等特點。
  11. Layout input pole length ' s locus when the mechanism follows kadang movement in two ways. one is multinomial curve locus and the other is linearity intermixed by parabola curve locus. we study the displacement > velocity and acceleration curve consulting time under variety velocity characters, and get the best curve and the best velocity character, which will have a very important significance for kadang movement ' s input control of this mechanism

    對卡當運動輸入桿件的伸長進行了軌跡規劃,採用了多項式與混有拋物線的線性函數作為規劃軌跡,研究了不同速度參數條件下的位移、速度、加速度的時間變化曲線,給出了最優曲線和最優速度,這對于機構卡當運動輸入控制的實現和優化具有重要意義。
  12. In order to restrict the displacement of relaxed rock effectively, the factors affecting the efficacy of anchor measures are analyzed according to mechanism of action of anchor. in terms of principle orthogonal design, the influence of parameters of anchor to displacement of excavation slope are elevated by computing using finite element method simulation, and the optimal scheme of anchoring parameters including length of anchors and space between bolts and thickness of shot concrete are defined. finally, the optimal scheme of anchor parameters are determined with considering results of theory analyse and numerical calculation, which provide theory bases for engineering

    為了有效防治邊坡開挖后巖體的鬆弛變形,根據錨桿的作用機理對影響錨固效果的主要因素進行分析,並利用處理多因素試驗的科學方法?正交設計原理,以有限元數值計算為手段,以有效約束邊坡開挖位移為標準,評價了錨桿長度、錨桿間距、混凝土噴層厚度等錨固參數對邊坡變形的影響大小和規律,經過比較分析最終提出了錨固參數的優化設計方案,為工程設計提供了理論指導。
  13. Laser interferometer systems are now in widespread use in engineering metrology for the measurement of length, displacement and other dimensional quantities

    在工程計量學上,激光干涉儀已被廣泛使用於測量長度、位移及其他與長度有關的量值。
  14. At last, a 3d - fem model is used for a soil - nailed supporting system in a classical two - layer distribution. the spatial distribution of horizontal displacement is reached by the analysis. some other analyses are made for the different ratio of length of foundation pit and the effect of the ratio on the largest horizontal displacement of the slope is analyzed

    在邊坡破壞模式研究中利用有限元方法對成都砂卵石地區典型的二元體土層基坑開挖進行了數值模擬,認為其破壞並不取均質土的圓弧破壞模式,而是一種折線形破壞模式,同時建議在噴錨網支護設計中錨桿長度的變化和極限平衡分析中考慮折線形滑動面。
分享友人