life cycle cost analysis method 中文意思是什麼

life cycle cost analysis method 解釋
壽命周期費用分析法
  • life : n (pl lives)1 生命,性命。2 一生;壽命;【原子能】(亞原子粒子的)生命期;使用期限,耐久性。3 ...
  • cycle : n 1 循環,周期,一轉。2 周時,周年,年紀。3 (詩、故事等的)始末。4 自行車,三輪車,摩托車。5 【...
  • cost : n 1 費用;代價,價格;成本。2 犧牲;損害,損失。3 〈pl 〉訟費。vt (cost; cost)1 值,要價(苦幹...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  • method : n 1 方法,方式;順序。2 (思想、言談上的)條理,規律,秩序。3 【生物學】分類法。4 〈M 〉【戲劇】...
  1. Different equations to corresponding components are presented by analysing and transformating the general equations of fluid routes, then static characteristics mathematical model of liquid propellant space propulsion system is presented. based on the data of static characteristics calculation, mass model of thruster, propellant, propellant tank, gas, gas bottle, pipe and valve is presented using both the method of statistical regression and the method of stress analysis, then corresponding mass model is presented. based on the characteristics of liquid propellant space propulsion systems, analyse the five phases ( concept and definition, design and improvement, manufactureing and arrangement, operation and ma intenance, disposal ) in which life cycle cost of liquid propellant space propulsion systems is cost separately, then discompsed structure of life cycle cost and model of life cycle cost are presented

    將組件分成氣路組件和液路組件,再對氣路組件和液路組件進行相應的分類,然後通過對通用流路方程進行分析和變換對不同類型的組件分別建立不同的方程,從而建立了一個適用於液體推進劑空間推進系統的靜態數學模型;根據靜態計算所得到的數據,應用統計回歸法和應力分析法分別建立推力室、推進劑、推進劑貯箱、氣體、氣瓶以及導管和活門等的質量模型,從而建立相應的質量模型;結合液體推進劑空間推進系統特點,對液體推進劑空間推進系統全壽命周期費用發生的五個階段(概念和定義、設計和改進、製造和安裝、運行和維修、處理)分別進行分析,建立了液體推進劑空間推進系統全壽命周期費用分解結構和全壽命周期費用模型。
  2. On the basis of collecting and processing many datum and materials. firstly. this paper analyzes main activities and cost constitutions of each stage of the life cycle of a fcs, and lay a foundation for later analysis and evaluation of system lcc. secondly, a basis method and usage range for estimating the system lcc are introduced. a multivariate linear regression model of pcs development cost and cost driven factor is built by use of the parametric method and supplies the base of cost estimation of newly - developed systems. thirdly, combine actual examples and make statistical analysis of lcc of a certain pcs developed by our institute, predict unhappened usage and service cost with grey prediction method, obtain proportion of each constitute to the lcc. forthly, according to actual conditions, use the fuzzy theory to overall evaluate efficacy of the fcs, fifthly, combimng our actual conditions, investigate specific measures of how to implement the life cycle cost management in our institute and put forward a new conception of developing web - based flight control system lcc management information system with pdm as the platform. at last, investigate important factors such as reliability and maintainability that may affect the life cycle cost of the fcs in detail, and put forward specific methods of lowering the life cycle cost of the fcs

    論文在收集和整理大量資料的基礎上,首先深入分析了飛控系統壽命周期各階段的主要活動以及各階段的費用構成,為以後系統壽命周期費用的分析和評價奠定了基礎;其次,介紹了壽命周期費用估算的基本方法和使用范圍,並利用參數法建立了飛控系統研製費用與費用驅動因子的多元線性回歸模型,為新研系統的費用估算提供了依據;第三,結合實例對我所研製的某型飛控系統的壽命周期費用進行統計分析,運用灰色預測方法對未發生的使用及維修費用進行預測,得出了該系統的壽命周期費用以及各組成部分所佔比例;第四,根據實際情況,首次運用模糊理論對飛控系統的系統效能進行了綜合評價,構造了飛控系統系統效能模糊綜合評價模型;第五,結合我所實際,探討了如何在本單位實施加強壽命周期費用管理的具體措施,提出以pdm為平臺,開發基於web的飛控系統lcc管理信息系統的新構思;最後,對影響飛控系統壽命周期費用的重要因素如可靠性和維修性等進行了詳細地研究,提出了降低飛控系統壽命周期費用的具體方法。
  3. Study on decision - making of pavement maintenance amp; amp; rehabilitation strategy based on life - cycle cost analysis method

    基於壽命周期費用分析的路面養護維修決策方法初探
  4. 2 ) on the aspect of the decision of optimal time for equipment renewal and rejection, it pre - calculates the optimal rejection time of typical machine by analysis of existed cost of quipment and based - built cost model and by the method of life cycle cost analysis

    2 )在設備最佳更新報廢時機的確定方面,通過對設備已發生費用分析和所建立的費用模型,運用壽命周期費用分析的方法對典型機種的最佳報廢時機作了試算。
分享友人