  1. In order to detect the bottom thickness, cavity, leak and deformation of steel meshes in secondary lining of concrete in tunnel construction, the authors evaluate the wave character and the detected result in the second lining of the tunnel using surveying radar technology and conclude the wave character in the tunnel lining which has mass defect and tested the accuracy and reliability of this technique

    摘要為檢明隧道混凝土二次襯砌中的底界厚度、空洞、漏水、鋼筋網變形等質量問題,利用探地雷達技術,通過對檢測方法及工程檢測實驗的研究,進行隧道二次襯砌中雷達波形特徵參數及檢測結果評價,總結了隧道襯砌質量問題的雷達波形特徵,驗證檢測方法的精度和可靠性。
  2. Besides, this paper adopts the random finite element method, uses geometric and physical mechanical parameters that are relevant to lining weight of surrounding rock, coefficient of lateral pressure, height or buried depth of vertical loading, elastic resistance coefficients of surrounding rock, elastic modulus of support structure, unit weight of concrete, thickness of the structure as well as torsional strength and compression strength of concrete and etc., as random variables, applies the monte - carlo method to sampling by computer, preliminarily evaluates the reliability of bearing capacity and stability of molded concrete lining of the xuefeng mountain tunnel, and obtains the related displacement of the lining, mean value and variance of internal force, and computed the reliability index of lining structures

    此外,本文採用隨機有限元方法,將圍巖容重、側壓力系數、垂直荷載高度或埋深、圍巖的彈性抗力系數、支護結構的彈性模量、混凝土容重、結構的厚度以及混凝土的抗扭與抗壓強度等與襯砌結構有關的幾何與物理力學參數作為隨機變量,應用蒙特卡洛理論進行計算機隨機取樣,對雪峰山隧道模注混凝土襯砌的承載力與穩定性的可靠度進行了初步評估,得出了襯砌的相關位移與內力的均值和方差,並計算出了相應的襯砌結構可靠指標。
  3. As for non - destructive inspection of t railway tunnel lining quality, the two principal indices are strength and depth of lining, of which the latter will only be investigated in this paper

    隧道襯砌質量檢測的最主要的兩個指標是強度和厚度,本文只討論厚度的無損檢測。
  4. The geological conditions are very complicated in hejiazhai tunnel which is located in guizhou shuibo railway, this tunnel is named " mashed tunnel " with the most difficult geological conditions such as the high dense gas and developed karst and gushing water assembled together, the geological hazards like the gushing water and sand, the collapse of tunnel, surface subsidence and slide, cracking of tunnel lining were often happened during construction period

    摘要貴州水柏鐵路何家寨隧道,工程地質條件極其復雜,集「高瓦斯、強巖溶、大涌水」為一體,施工期間曾發生多次涌水涌砂、洞內坍方、地表塌陷與滑坡、支護襯砌開裂變形等地質災害,堪稱水柏鐵路施工難度最大的「爛洞子」 。
  5. However the diversion tunnel is generally discarded after used, because the construction period of hydraulic power station is pressing, the lining standard of tunnel needs being improved and the up and down steam water level is difficult to be joined

    而導流洞在完成導流任務后,又往往因為工期緊,襯砌標準需提高,上下游水位銜接等困難而被廢置不用。
  6. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行隧道島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  7. The lining of a tunnel in the area with high groundwater table does not bear high external water pressure in - normal, the surrounding rock reinforced by intrusion concrete does it. in the case, the groundwater through reinforced rock accumulated in the space between lining and rock must be drained in time

    一般鐵路隧道通過高水位富水區時,不用襯砌直接承受較高的外水壓力,要實現這個設計目標必須做好襯背的排水工作,使通過加固圈滲透過來的水量及時排走,及時削減累積的水量。
  8. The theory and its calculated methods of tunnel section design is researched in this paper, including the foundation and methods of the choice of profile and line types, and value and distribution of load, and the common calculated methods of lining structure

    研究了水工隧洞斷面設計的理論及其計算方法,包括斷面選型和襯砌型式選擇的依據和方法,荷載的取值和分佈,襯砌結構常用計算方法的研究。
  9. The results of the studies show that the size, length, and scope of tunnel lining crack can be identify by infrared thermography images

    經實地檢測高雄市西子灣隧道和高雄縣大關山隧道,發現隧道襯砌之孔洞與裂縫部位,其紅外線熱影像溫度差異變化大於沒有孔洞裂縫之襯砌。
  10. In - site studies are carried out at the kaohsiung hiziwan tunnel and the daguan mountain tunnel to evaluate the quality of tunnel lining

    研究結果顯示隧道襯砌之裂縫、空洞等瑕疵,透過紅外線探測與比對色階,可判斷出其位置、大小與范圍。
  11. And then according to every process of tunnel construction, simulated analysis is carried out. by combining with monitoring and instrumentation of surround rock periphery displacement and the face of land to sink, surround rock with spray laminating force, surround rock body internal displacement, anchor rod axle force and protect and lining build strength, we have carried out scientific analysis and synthesis judgement of the stability of tunnel wall rock and the security of timbering structure

    然後,根據隧道施工的各個工序進行模擬分析,並結合對圍巖周邊位移、地表下沉、圍巖與噴層壓力、圍巖體內部位移、錨桿軸力、支護及襯砌強度進行的量測與監控,對量測結果作出了科學分析,從而對隧道圍巖的穩定性和支護結構的安全性做出了綜合評判。
  12. Technique and application for nondestructive inspection of tunnel lining

    隧道襯砌無損檢測技術及應用
  13. The optimal design and research of tunnel lining section in loess stratum

    黃土隧道襯砌斷面優化設計與研究
  14. Security estimate and stress test of tunnel lining structure for huangcao tunnel on yuhuai railway

    渝懷鐵路黃草隧道襯砌結構受力測試及安全性評價
  15. Because there are small openings and the three cracksin the concrete lining of gas tunnel, the gas should intrude into the gas tunnel built. this effect will endanger the transport safety. the authors study on the operation ventilation technology in the gas tunnel and put forward an economical, safety and effective ventilation plan, and therefore furnish a theoretical basis for the gas tunnel ventilation design in the future

    由於瓦斯隧道混凝土襯砌本體中的細小孔隙和「三縫」等缺陷的存在,建成后的瓦斯隧道必然受瓦斯侵襲,這對運營安全危害極大,為此,本文對瓦斯隧道運營通風技術進行了認真研究,提出了經濟、安全、有效的通風方案,為未來瓦斯隧道的通風設計提供了理論依據。
  16. This thesis pass through the laser delimitation instrument and the geological radar instrument means, to tunnel initial stages support and secondary structure. at past the research of tunnel lining thickness depend on opening dig figure, don " t consider the effect of tunnel lining inner figure. adopting the integrate method of the laser delimitation instrument and the geological radar could most exact reflect the change rule of tunnel lining thickness, but also could do lots unbroken examination, have very important for summing - up the rule of tunnel lining thickness change, and have very amplitude extend value

    本文通過激光限界儀和地質雷達綜合方法,對新建高速公路隧道初期支護和二次襯砌混凝土內輪廓和厚度進行了檢測,對襯砌厚度的分佈規律以往的研究中,多以開挖和襯砌的輪廓變化為依據,並未考慮襯砌內輪廓的影響,而採用激光斷面輪廓限界儀和地質雷達綜合方法能較為準確的反應襯砌厚度的變化規律,並且能夠無破損的做大量的檢測工作,為總結混凝土厚度的規律有很大作用,並有極大的推廣價值。
  17. The objective of this research is to make the quality evaluation of tunnel lining by using infrared thermography

    摘要本研究系探討以紅外線熱影像分析技術來評估隧道襯砌之品質。
  18. On approaches to control quality of tunnel construction in using tunnel lining trolley

    隧道襯砌臺車在襯砌施工中的質量控制對策
  19. Based on the current studying situation of the stratum displacement caused by shield tunneling and the interaction of soil and lining of tunnel, the thesis has discussed the shield tunneling process, which has significantly influenced the stratum displacement and earth pressure

    本文論述了盾構法隧道對周圍地層的影響和盾構襯砌結構與土體共同作用的研究現狀及存在的主要問題,即目前的研究基本上沒有考慮施工過程的影響。
  20. Displacement - based method for reliability analysis of shotcrete lining of tunnel

    隧道噴混凝土襯砌結構可靠度分析的位移方法