load line 中文意思是什麼

load line 解釋
滿載吃水線。

  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • line : n 1 線;繩索;釣絲;測深度用繩,捲尺。 a fishing line 釣魚線。 be clever with rod and line 會釣魚...
  1. On the basis of remote sensing technique ' s good characteristic with large - area, multi - time, multi - photograph variety, manifold abundant spectral information and high ground resolution, the fault tectonics frame, river geomorphy ( such as terrace, floodplain, shoal, etc ) and suspended load, etc. were explained after analyzed the fault tectonics, river geomorphy, characteristic in the tm image by gray bar statistics, primary component analyses, tm741 image integration, line convolve enhancement and model recognition etc. especially 9 piece of fault tectonics were explained in this thesis, in succession, the impacts of the factors severally were analyzed

    遙感技術具有大范圍、多時相、多片種、多層次、含有豐富的光譜信息及具有較高的地面解析度的特點。本文利用該技術,運用灰階統計特徵分析和主成分分析、 tm741多波段融合、線性卷積增強、模型提取等一系列遙感解譯分析方法,分析了斷裂構造、河流地貌(階地、漫灘、沙洲)及懸浮物等在tm遙感圖象上的影像特徵,解譯出了安徽南部斷裂構造格架、河流地貌和懸浮物的分佈,並新解譯出了9條近東西向的斷裂。
  2. In oilfield, feeder line of 6kv often has many branches. the pole high voltage automotive capacitor compensation system controlled by single chip computer is designed for this situation. in the system, we separate the measure position and compensation position and realize the supervision of reactive load in local area

    文章以油田6kv輸配電線路為例,針對多分支樹狀結構線路的特點,研製出由單片機系統控制的戶外術上型高壓電容器自動補償系統。
  3. As a finishing coat on ships ' exterior hull from rail to load line, steelstructure on deck and similar

    作為面漆塗在船殼外表面欄桿至載水線部位,甲板上的鋼結構表面及類似部位。
  4. Planning of assembly line production cycle time based on the balance of load

    基於負荷平衡的流水線生產節拍設計
  5. The actual delays depend on line speed and system load

    真正的延遲時間依賴于線路的速度和當時的系統負載。
  6. Maximum load factor of line

    線路最高滿載率
  7. The drawing of ac load line in amplificatory circuit

    放大電路交流負載線的作法
  8. Winter north atlantic load line

    冬季北大西洋裝載線
  9. Fresh water tropical load line

    淡水熱帶載線
  10. Load line certificate

    滿載吃水線證書
  11. Fresh water load line

    淡水載重線
  12. Tropical load line

    熱帶裝載線
  13. Timber load line

    木材載重線
  14. Summer load line

    夏季載重線
  15. Results : 1 ) under the same condition of loading, the stress and displacement of mesial occlusal rest design was smaller than that of distal occlusal rest design in abutment teeth and soft tissue under the base, however, the magnitude in the soft tissue under base was bigger. 2 ) when a distributed vertical load was applied to the artificial tooth abutment teeth regions, the stress distribution was similar to that of concentrated load in the artifitial tooth, and stress magnitudes were higher. 3 ) under the condition tested, the mesial occlusal rest design caused the stresses that were more in line with the long axes of the abutment teeth than did the distal occlusal rest design

    結果: 1 )在同一加載條件下,近中(牙合)支托設計與遠中(牙合)支托設計相比,基牙及基托下軟組織的應力和位移值減小;基托下軟組織的應力和位移值大於基牙; 2 )基牙及義齒整體加載時,各基牙應力分佈規律與人工牙加載相同,但應力值增大; 3 )近中(牙合)支托設計使基牙受力更趨于軸向。
  16. Load on the implement : a tool for cutting the drip line ( pruning shears, cutting knife ), suitable tools connectors in an amount for one working day, stakes for marking problems during embedding, shearing screws and a suitable tool box

    裝上安裝工具包括:割斷滴灌管的刀子(修枝剪,切刀) ,夠一天使用的合適的連接件,用於標記安裝時出現問題的樹枝,螺絲刀和工具箱。
  17. The steel construction is made up of roof beam, post, purlin, roofing and wall, adopt the automatic production line to weld and take shape in the factory, construction site spend high - strength bolted joint reduce weld work load, make progress and quality receive the complete assurance

    鋼結構由梁、柱、檁條、屋面和墻體組成,工廠內採用自動化生產線焊接成形,施工現場用高強螺栓連接,減少了焊接工作量,使進度和質量得到完全保證。
  18. Based on the resolving algorithm of continuous - layer method, the time order analyzing curves, acceleration curves and the response spectra of transfer function at the different points of the ground and at the same point on the different ground conditions are gained. it demonstrates that the responses of ground in x, y and z axial directions all change by time, and the obvious wave propagation appears in ground. for different observing points on the same ground condition, at more distant points from the load line, the less swings are found, that is to say, vibration possesses the obvious characteristic of attenuation

    基於分層法的解析演算法,得到了在不同點以及在同一點但不同地質條件下的時程分析曲線、加速度變化曲線和傳遞函數反應譜,結果表明,地基土在x 、 y 、 z三個方向的響應都是隨時間變化的,並且伴隨有明顯的波動現象產生;對于相同地質條件的不同觀察點,距離荷載作用線越遠的地方振幅越小,即振動具有明顯的衰減性。
  19. Under action of uniformly distributed load, line load along inside edge or uniform moments along outside edge, upper and lower critical loads of truncated conical shells and spherical shells with linearly variable thickness were computed

    出了在均布荷載、內邊緣均布線荷載或外邊緣均布力矩作用下,線性變厚度開頂圓錐殼、球殼的上、下臨界荷載。
  20. Not suited below deep load line in association with impressed current cathodic protection

    當裝有外加電流陰極保護裝置時,本品不宜塗在重載水線以下。
分享友人