load measuring 中文意思是什麼

load measuring 解釋
桿量,稱量
  • load : n 1 裝載,擔子;負擔;工作(負荷)量。2 (車船等的)裝載量;一馱,一車,一飛機。3 【電、機】(機...
  • measuring : n. ,adj. 測量(的),測量用(的)。 remote measuring 遙測。
  1. Electric power ergograph is a load or device of absorbing power, which mainly is used of measuring power for middling torque

    電力測功機是常用的負載與吸功設備,主要用來對中等大小的扭矩測功。
  2. The method for measuring the plane strain fracture toughness klc has been introduce to high polymer bonded explosives ( pbx ) by systematically studying technologies concerning the shape of specimen, the depth and its machining of crack, the loading rate, the measurement of critical fracture load, and the computation of klc, etc. the method has been used to test and study klc of three typical high polymer bonded explosives which are j2, jl, j3 respectively both at normal temperature and unmoral temperature

    本文以高聚物粘結炸藥為研究對象,對測試高聚物粘結炸藥的平面應變斷裂韌度所涉及的樣品形狀、裂紋深度及裂紋制備、加載速度、臨界斷裂載荷p _ q的確定及平面應變斷裂韌度k _ ( ic )的計算等方面進行深入研究,建立了較為完善的炸藥平面應變斷裂韌度測試方法。
  3. To prepare international standards for electrical energy measuring and electrical load control equipment ( such as watt - hour meters, var - hour meters, maximum demand indicators, telemetering for consumption and demand, equipment for remote meter reading, time switches, equipment for the control of loads and tarifs and consumer services ) including the equivalent electronic forms of these devices and their accessories

    負責制定電能測量和負荷控制設備(如:有功、無功電度表、最大需量指示器、損耗和需量的遙測、遠程抄表設備、時間開關、負荷和費率控制設備及用戶服務等)的國際標準,包括功能相近的運用電子技術實現的設備及其附件。
  4. Through developing the comprehensive experiment device with large - scale drum strength and stability, the stress - measuring experiments of various wall thickness of the normal drums of the cranes were performed. the law that the stress of the drums along the circumference and along the axis changes with the load increase of the wire ropes was studies for the first time

    通過研製全比尺大型捲筒強度、穩定性綜合試驗裝置,對起重機常用規格的捲筒進行了各種壁厚條件下的應力測量試驗,首次對捲筒體周向和軸向應力隨鋼絲繩逐步加載過程變化的規律進行了研究,發現最大應力產生在鋼絲繩繞過后3 ~ 5圈截面處,該現象與理論分析結果也是符合的。
  5. The experiment procedure and analysis result about exteriorly extended end - plate connection with high strength bolt are introduced primarily ; each sample ' s dimension is given. the adding load equipment, measuring apparatus placed, measuring point established is detailed. adding load measure load and m - curve is produced ; the single span gabled frames horizontal displacement formula is deduced when the horizontal concentrated force is applied to it

    重點介紹了外伸端板高強螺栓連接的實驗過程及實驗分析結果,介紹了各組試件的形狀尺寸、加載裝置、測量儀器安放、測點的布置等;給出加載方式及測出的m -曲線;計算出試驗節點的初始剛度;推導水平集中力作用下單跨門式剛架考慮節點半剛性的側移計算公式。
  6. According to the characteristics of the load on the canopy, the method for measuring the load on the canopy with a pressure sensor is presented, and then the flight measurement of the load spectrum of the canopy is realized for the first time

    根據實測活動艙蓋載荷曲線特點,提出了任務類型劃分方法,建立了活動艙蓋載荷譜數據統計方法和載荷譜編制方法,並依此編制出k8飛機活動艙蓋載荷譜。
  7. Electromechanical components for electronic equipment. basic testing procedures and measuring methods. part 5 : impact tests free components, static load tests fixed components, endurance tests and overload tests

    電子設備用機電元件基本試驗規程及測量方法第5部分:撞擊試驗
  8. Specification for electromechanical components for electronic equipment : basic testing procedures and measuring methods - impact tests free components, static load tests fixed components, endurance tests and overload tests

    電子設備用機電元件規范:基本試驗程序和測量方法.第5部分:沖擊試驗
  9. The measuring range and eventually exsisting initial load tara can be adjusted on site

    量程和初始負載皮重可以現場調節。
  10. By the research about the equipment long time, we have advanced and designed a set of staticly measuring weight automatic stepless adjustment empty and load equipment. the static measuring weight automatic stepless empty - load measures the vehicle load in static, then records the weight as the gist of the next brake

    本文所述的靜測重無級自動空重車調整裝置,它採用靜測重方式實現載重信號的採集,並將所採集的信號進行記憶,為輸出制動壓力提供依據。
  11. Standard test method for measuring load induced subsidence of an intervertebral body fusion device under static axial compression

    測量在靜態軸向壓縮下椎間體融接器件的負載引發衰耗的標準試驗方法
  12. This paper describes mainly system functions, measuring methods, circuit design, software program and errors analysis of a new type of measuring instrument. this instrument can measure and monitor electric parameters in single - phase circuits, three - phase ( three - wire or four - wire ) circuits. this system can be applied to electric devices and power plants, transformer substations with harmonic pollution. it can measure current, voltage, power, energy, frequence, power factor etc. it also can detect load quality, phase sequence, alarm, display and print results, as well as detect and dispose negative power

    該儀器適用於含有諧波污染情況下的機電設備現場、發電廠、供電局、企業變電所現場,可用來測量電流、電壓、有功功率、無功功率、視在功率、有功電能、無功電能、視在電能以及頻率和功率因數等電參數,並具有負載性質(感性、容性)判別,正、逆相序判別指示功能;超限報警功能;列印記錄功能和負功檢測及處理功能。
  13. In the areas of impact dynamics and high velocity impact dynamics, measuring impact load and pressure between two contacted interfaces is still a difficult work. polyvinylidene difluoride ( pvdf ) piezofilms are of interest to solve the above problem as potential gauge materials since they have quick response to dynamic load and available plasticity

    在碰撞及高速碰撞動力學的研究中,界面與界面之間壓力、撞擊載荷隨時間的變化等的測試一直是一個難題, pvdf壓電特性的發現為解決這一難題提供了可能。
  14. The force laboratory provides calibration services for force measuring instruments such as proving rings and load cells in the measuring range from 0. 5 kn to 3 mn

    本所可為0 . 5kn至3mn力值范圍的測力計,例如測力環和載荷傳感器提供校正服務。校正0
  15. The static loading test for three group of testing piles of jiading power plant secend stage project are analyzed and studied in this thesis, and the practical applying of high - accurate data collector, technique of waterproof insulation and testing technique of burying in the body of pile are introduced also. the vertical and horizontal loading features of three group of piles of different kind and constructing technique in different earth layer at the pile point are analyzed and compared and summed up with basic integro - differential equation calculating the pile earth system load transmit, transforming principle of stress - deforming and pile body rating of burying electric measuring element. changing law of stress, and changing law of pile body shifting and bending for different testing piles under vertical and horizontal load are showed so that the loading features of soil layer and pile at testing spot, reliable design data for pile type and base for scientific construction technique are provided

    本文僅就嘉定電廠二期工程中的三根試驗樁的靜載試驗進行了分析和研究,利用樁土體系荷載傳遞分析計算的基本微分方程及應力-應變轉換原理,結合預埋電測元件的樁身率定,對三組不同種類、不同施工工藝、不同持力層中的樁的豎直、水平承載特性進行了分析、比較和歸納,通過大量、全面的實測數據,經過整理、轉換和推演,揭示了不同試驗樁在豎直、水平荷載作用下的應力變化規律和樁身變位、撓曲變化規律,最終提供試驗場地土層和樁的承載特性,為該工程合理設計樁型提供了可靠的設計參數,為確定科學的施工工藝提供了有力的依據。
  16. According to our experimental investigations of varying load amplitude, it was found that the phenomena of fatigue crack growth retardation occurred for pmma material following a high overload cycle exerted among the regular constant amplitude load cycles, the ratio of peak value of overload to that of the regular cycles should be over at least 1. 35 to make the retardation taking effect. the experiment scheme for measuring the shutting - off ratio of overload ( defined as the overload ratio when da / dn < 10 - 7 / cyc. )

    本文試驗分析了變幅載荷對裂紋擴展的影響,證實了有機玻璃也存在超載遲滯現象,通過金相觀察分析,提出超載遲滯的過程實際上是裂紋前緣萌生新的裂紋的過程的觀點,同時提出超載遲滯的合理的解析,並且給出超載遲滯比,為隨機載荷下疲勞擴展模型的建立提供了一個重要的參數。
  17. In order to gather and analyse the load information automatically and promote the level and precision of distribution network plan, line loss analysis and operation mode adjustment, the data from distribution measuring devices, load supervising system and automatic message registering are centralized through mapping in dgis ( distributuin geography information system ) and other three systems

    摘要為實現對配網中負荷的自動採集和分析,以提高配網規劃、線損分析及運行方式調整的水平與精度,採用中心數據庫數據集中方式將配電綜測儀、負控系統和抄表程序數據集中管理。
  18. Research of load measuring device of oil film bearing used in high - speed wire rolling mill

    高線軋機油膜軸承載荷特性測試裝置研究
  19. Load measuring of powered supports with magnetoelastic stress sensor

    磁彈性應力傳感器檢測支架載荷試驗研究
  20. Simulated load measuring of large power gearbox based on virtual instrument

    基於虛擬儀器的大功率減速器模擬加載測控
分享友人