loaded parts 中文意思是什麼

loaded parts 解釋
受力零件
  • loaded : adj. 1. 載重的;有負荷的,裝著貨的,有含意的。2. 裝子彈的;灌過鉛的;攙有雜質的;加有填料的。3. 〈美俚〉喝醉了的。4. 〈美俚〉富有的,錢很多的。5. 吃飽了的。
  • parts : 部分
  1. Straight moving type relief valves, mainly valve disc, valve body, spring - loaded, roof, regulation pole, conditioning nut, and other integral parts

    直動型溢流閥,主要有閥芯、閥體、彈簧、上蓋、調節桿、調節螺母等零件組成。
  2. At about 5. 30 pm on april 3, two motorised sampans loaded with cargoes were spotted manoeuvring near tuen tsui in sai kung. following a pursuit, one of the sampans with no person but 500 boxes of audio and visual equipment as well as computer parts worth some $ 2. 26 million on board was intercepted off shek ngau chau

    水警于本月三日下午約五時三十分西貢短咀附近發現兩艘載滿貨物的機動舢舨,經過一輪追截,其中一艘舢舨在石牛洲對開海面被截獲,船上載有五百箱總值約二百二十六萬元的影視器材及電腦零件,但舢舨上並沒有人。
  3. The primary measures for control precept are : sufficiently and effectively utilizing the the air compressors " interior data, realizing online surveillance and alarming for failure of the the air compressors " running interior parts ; letting the air compressors running by master and slave manner, by reasonable arranging the alignment of the air compressors, making the masters yielding pressed air and the slaves adjusting the pressure of the air. this decreases the times of loading and unloading greatly and the decreased failure of air compressors and low maintain ; at the same time we adopt abundant value of the set pressure for stabling the compressure. the air compressors become loaded or unloaded ahead by the abundant value ; caning unloading control for saving power, when the air compressors get along with unloading for a while, the system will stop them ; consummating the purposes for control, enhancing offline control for over - press and low - press, continual loading control and unloading control

    經過分析研究,針對原來存在的問題,在控制方案上主要的改進措施有:充分、有效地利用了空壓機的內部參數數據,對空壓機的內部部件的運行情況實現了在線監視及故障報警;對空壓機採用了主、輔結合的運行方式,通過對空壓機加、卸載隊列的合理排序,使空壓機自動實現主機產氣、輔機進行氣壓調節,減少了空壓機的加載和卸載次數;在壓縮空氣壓力的穩定上進行了裕量控制,在壓縮空氣壓力不到供能品質所規定的上、下根就根據一定的裕量提前進行卸載和加載操作;在節約電能方面對空壓機進行了卸載停機控制,當空壓機在一定時間內一直處于卸載狀態,系統就認為該空壓機沒有運行的必要,自動將其停機;完善了控制效果,增加了超壓低壓脫網控制、連續加載控制、連續卸載控制等功能。
  4. Illustrated by a tensile composite plate with an open hole and a pin - loaded hole, fiber placement path planning of the fully - steered ply is studied. the optimization of fiber placement paths for composite plate - parts is studied, two kinds of algorithm are brought out to meet different requirements of base - line - path

    3 .將層合板的加強層纖維鋪放路徑優化方法推廣應用於曲面板類復合材料構件的纖維鋪放軌跡規劃,並根據不同基準鋪放路徑數目提出了兩種纖維鋪放軌跡密化演算法。
  5. On dec. 13, another lot of machined parts were being loaded in containers and would be exported to japan

    2006年12月13日我公司又有一批外協加工件正在裝櫃出口去日本。
  6. Then we consider the problem as a " conjunction " problem : according to the solutions for wave problem in interface between two conjunctive homogeneous elastic half - spaces as well as the scattering problem of sh - waves by an arbitrary - shape - cavity in homogeneous material, we divide the elastic space with an interface cavity into two parts along the interface, each is elastic half space with an arbitrary - shape - canyon. and then dividing surfaces are loaded with undete rmined antiplane forces, and with some antiplane reacting forces to appear cracks

    然後將界面任意形孔洞和孔邊裂紋對sh波的散射問題視為「契合」問題:即從兩個相互契合的完整彈性半空間的界面波動問題和彈性均勻介質中任意形孔洞對sh波散射的解答出發,沿界面處將含孔洞的彈性空間剖分為兩個含有任意形凹陷的彈性半空間,在其剖分表面上加置未知的反平面荷載,在出現裂紋的位置加置反平面反力構造出裂紋。
  7. Analyze whether the assembly relation between the parts is rational, whether exists interfere appearance, analyze the loaded intensity of each part

    分析零件之間的裝配關系是否合理,是否存在干涉顯現,分析各個部件的載荷強度。
  8. The test data demonstrate that the column strengthening by the prestressing force can be removed load and strengthened synchronously and the lagging of strain of the new parts compared that of the old can be cleared up when twice - loaded. the bearing capacity of whole construction is increased remarkably and the material of both the new parts and the old reach ultimate states

    通過試驗數據分析可見,預應力法加固軸心受壓構件可以達到加固與卸載同步進行,使新加部分在二次受力相對于原混凝土的應變滯后現象得到較好的消除,加固后組合構件整體承載力得到顯著提高,新加部分與原構件材料的承載潛力可以達到最大的發揮。
  9. There are two parts in this paper. in the first part, the deformaion behavior of soil loaded is analyzed. then we construct the equation that considers the lateral deformaion of the settlement of foundation which is loaded by rectangle vertical equal loading through recongnizing the characteristics of deformation

    本文主要由兩部分構成:第一部分是在我們分析了土體受壓后的變形特性,並在對其變形性質認識的基礎上,建立了矩形面積均布豎向荷載下考慮側向變形的地基沉降計算公式。
  10. Because a single derby database instance is limited to allowing simultaneous access only through jdbc drivers loaded by the same class loader, the database configuration and sql login module configuration must be deployed as parts of a single application

    因為單個derby數據庫實例被限制為只允許通過由同一個類裝載器裝載的jdbc驅動程序進行的同時訪問,所以數據庫配置和sql登錄模塊配置必須部署為單個應用程序的各個部分。
  11. When the whole structure is loaded twice, the strain of new parts lag behind that of the old, so that the new parts cannot reach ultimate state when damaged

    這樣整個結構在二次荷載下,新加部分的應變將滯後於原構件總的應變水平。破壞時,新加部分將可能達不到自身的極限狀態,其潛力得不到發揮。
  12. By adopting the calculating analysis method of elastic - plastic three - dimensional fem numeric simulation, this paper makes a simulation analysis on the structure stability of the shallow cover and unsymmetrically loaded parts in tongyoushan tunnel, mainly simulates the effects caused by different construction orders on surroundings and supporting structure stability, and it centers on the analysis on the weak part, the midwall in the lining of the connecting - arch tunnel

    摘要採用彈塑性三維有限元數值模擬計算分析的方法,對桐油山隧道淺埋、偏壓地段結構穩定性進行了模擬分析,主要模擬了不同施工順序對圍巖及支護結構穩定性的影響,重點對連拱隧道整體襯砌中的薄弱環節中墻進行了分析。
分享友人