loading program 中文意思是什麼

loading program 解釋
輸入程序
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • program : 按遺傳密碼工作
  1. After loading the runtime and creating an application domain, the word processing program might compile the macro scripts into managed code and create an assembly using

    在加載運行庫並創建應用程序域以後,字處理程序可能會將宏腳本編譯為託管代碼並使用
  2. To meet the demands for large space and flexible compartmentation of buildings, laminated vierendeel trusses are adopted in high - position transfer story structures. first the bearing characteristics are analyzed, in which reasonable stiffness ratio of the upper chord, middle chord, and lower chord is derived. then combined with an actual engineering model ( 1 8 similar ratio ), the static loading and pseudo - dynamic tests of two models for laminated vierendeel truss used in transfer story structures are conducted, in which one model adopts reinforced concrete, and the other adopts prestressed concrete and shape steel concrete. seismic behaviors are analyzed, including inter - story displacement, base shear - displacement skeleton curves, and equivalent viscosity - damping curves. a program is programmed to carry out the elasto - plastic dynamic analysis, and displacement time - history curves of the two models are derived. the test and analysis results show that the laminated vierendeel truss with prestressed concrete and shape steel concrete has excellent seismic behaviors. it can solve the disadvantages of laminated vierendeel trusses used in transfer story structures. finally, some design suggestions are put forward, which can be referenced by similar engineering

    為滿足建築物大空間和靈活隔斷要求,在高位轉換層結構中採用迭層空腹桁架結構.首先分析了其受力性能,得出了空腹桁架各構件合理的截面剛度以及布局形式.然後結合一實際工程,進行了兩榀迭層空腹桁架轉換結構模型( 1 : 8相似比)的豎向荷載下靜力試驗以及擬動力試驗.其中一榀為普通混凝土迭層空腹桁架,另一榀配置了預應力和鋼骨混凝土,對比分析了兩模型的層間位移比、骨架曲線以及等效粘質阻力系數等抗震性能的比較,並進行了彈塑性動力分析.試驗和分析結果表明,配置預應力和型鋼混凝土的迭層空腹桁架轉換結構具有良好的抗震性能,可以成功地解決迭層空腹桁架作為轉換層結構所產生的弊端問題,最後對這類轉換層結構提出了相應的設計建議
  3. Program can analyze the multi - girder curved bridge, by using the diatropic distributing theory. it can calculate the dynamic programming loading, by using the combined influence. it can analyze the internal force under the action with the prestressed force, by using the equivalent load method

    程序採用橫向分佈的實用計算理論來處理多主梁曲線梁橋的空間受力分析問題;採用組合影響線來對曲線梁橋進行動態規劃加載;採用等代荷載法對曲線梁在預應力作用下的結構內力進行分析。
  4. The design includes managing software of dsp system ( including dsp initializing, dma reading of collected data ), isp programming of flash memory, boot loading of the fixing program, program of interfaces between dsp and pci, the design of pci card driving program, the skills of programming etc. the sixth chapter : this chapter draws a conclusion and also gives a prospect on the research work

    介紹了dsp系統管理軟體(包括dsp初始化、採集數據的dma讀取) 、 flashmemory的isp編程、固化程序的引導、 dsp與pci介面程序、 pci卡驅動程序設計、以及編程技巧等內容。第六章總結了以上的工作,並對以後的研究任務進行了展望。
  5. The ansys, a kind of fea program, was used to build model of small carriage. the procedure of gantry beam bump with secondary beam of bridge was reappeared by running nonlinear calculation and loading program which was written by apdl program language. the closest deforming result was gotten, and the deforming of main beam, secondary beam and end beam and inner stress distribution status were calculated

    採用大型三維有限元軟體ansys對該起重機以及小車架等進行了建模、應用apdl語言編寫加載程序、進行非線性計算,再現龍門橫梁與起重機副梁碰撞過程,最後得到與實際變形結果最接近的一種狀態,得出起重機橋架主梁、副梁、端梁的變形以及其內部的應力分佈情況。
  6. Converting a program ' s address to hardware addresses and loading it in main storage

    將程序的地址轉換為硬體地址,並將它加載到主存儲器中。
  7. Then an thorough computer modeling using finite element program with material, geometry and state triple - nonlinear taken into account is carried out on a series of influencing factors, such as comparison with npn - beam splice connection, comparison of varies designed theories, and the varying of fraction coefficient, diameter, grade, pretension and arrangement of bolts, thickness of web and flanges of beam and column, splicing location, axial loading on column, etc. lots of useful conclusions are drawn form computer modelling. finally, design and construction suggestions are given out. this study fills the black in the field of steel beam - to - column connection with cantilever beam high - strength bolted - splicing at both home and abroad

    然後,本文在考慮材料、幾何和狀態三重非線性的基礎上,對該連接形式進行了全面的計算機模擬,主要考慮了帶懸臂梁段全螺栓拼接的樑柱連接節點與無拼接的樑柱連接及翼緣對接焊接腹板拼接的連接節點的對比,各種設計方法之間的對比,以及翼緣拼接和腹板拼接的螺栓間距、直徑和數量,拼接點與梁端之間的距離,梁和柱的翼緣、腹板厚度,柱的軸力,接觸面的摩擦系數,翼緣和腹板拼接板的厚度等因素的影響。
  8. Considering the similitude law for shaking table test, we study the test results and obtain some conclusions which are a ) generally, the silty soil in test box liquefies and the liquefied time has relation with the amplitude of acceleration, b ) when the intensity is on and above eight degree, the silty soil deposit will be liquefied dramatically, c ) the relationship of the pore water pressure is relevant to the cycle loading which represents when the cycle loading ranges from little to great, the relationship is represent as a concave curve, or else as a protruding curve and tends to stability. ( 3 ) based on the triaxial compression test and the resonant column test, some studies are made such as a ) the duncan - chang parameters of constitutive model, b ) the dynamic shear modulus ratio and c ) the damping ratio of the site soil deposits. in order to deal with the test data, a computer program is compiled

    ( 2 )利用小型振動臺進行了k _ 0固結狀態下粉土的振動液化模擬研究,通過分析正弦荷載作用下的試驗資料,驗證了粉土的孔隙水壓力增長模式的合理性;從微分方程推導了基於土體振動臺模型試驗的相似律,並從模型實體、孔壓時程曲線和相似律等方面做出了分析,得出了如下結論:在小型振動臺試驗中,模型箱中的粉土都發生了液化,液化的時刻和輸入加速度幅值有關,而對頻率的變化不太敏感;粉土在相當於8 9度地震烈度的加速度幅值作用下可能產生嚴重的液化;孔壓的增長曲線形狀與施加的荷載有關:當施加荷載為由小到大的形式時,曲線形狀為上凹的曲線;當施加荷載為等幅的正弦荷載或荷載幅值由大到小時,曲線形狀為上凸的曲線,且逐漸趨于穩定。
  9. All of the researches are carried out on the background of a spatial continuous beam - arch composite bridges, and the relative loading experimental results are compared with the calculated values. it indicates that the theory of elastically supported continuous beam method load lateral distribution is a kind of simple convenience and safe practical engineering calculation method. 2 ) the suspender force and correlated modality is analyzed with the use of general calculation program ansys. during testing suspender force, the influence of the rigidity of suspender must be considered

    在此基礎上,以一座實際的預應力混凝土連續梁拱組合體系橋梁為工程背景,採用一般的試驗研究方法對該橋進行了荷載試驗研究,並將有關的荷載試驗結果與理論計算值作了比較,結果表明:所提出的彈性支承連續梁法計算值,與空間有限元分析理論值及荷載試驗測試值基本吻合。
  10. Other segments can be made available by loading their segment selectors into these registers during program execution

    要想使用其它的段,可以在程序運行時把這個段選擇子載入段寄存器中。
  11. ( 6 ) run and debug the program on an electro - hydraulic servo loading system, and analyze the result

    根據上面所做的工作,使用vc + + 6 . 0編寫出一套模擬轉臺通用軟體。
  12. According to elasto - plasticity theory, with the help of finite - method program ansys, the paper undertakes the computer analogue tests about the bearing capacity of pile tip arranged by orthogonal principle, and attains the relations of pile - tip bearing capacity to embedment depth, pile diameter, cohesion, internal friction angle and modulus of deformation. by the means of mathematical statistic, regression equation of the ultimate bearing capacity calculated by finite element method is gained through the regression analysis of 81 group data from the computer analogue tests. by comparison and analysis of the values calculated by finite - element regression equation and the values of in situ loading test, the regression equation is gained which calculates the size effect for base resistance of large diameter pile

    根據彈塑性理論,運用大型有限元軟體ansys按正交設計理論對樁端承載力進行模擬計算,獲得樁端承載力與樁長(埋置深度) 、樁徑、粘聚力、內摩擦角及變形模量等主要影響因素的關系,並採用數理統計方法,對81組ansys模擬試驗結果數據進行回歸分析,得到有限元法確定樁端極限承載力的回歸公式,並將有限元法回歸公式計算值與現場小壓板載荷試驗值進行比較分析,得到大直徑樁端阻的尺寸效應系數計算公式。
  13. So how to transfer scientifically self - balanced test data into top load curve according to its actual working behavior, become the obstacle of its practical application. in accordance with actual forcing behavior and reaction mechanism between pile and soil, the article analyzes the relation between top part and bottom part, load transferring mechanism and difference with other loading way by ansys program. so the reliability of determine bearing capacity by self - balance method has been proved

    本文根據自平衡加載方式下樁身的實際受力狀況、樁土間的相互作用機理以及單樁破壞機理,建立了單樁的離散元模型,採用ansys通用分析軟體,選取合理的單元類型、材料特性等,數值分析了基樁在自平衡加載方式下上下樁段的相互關聯、荷載傳遞機理以及與其它加載方式的區別,論證了採用自平衡試樁法測定單樁極限承載力的可行性。
  14. Based on remaining the dismantling and loading, we make full of the equipped instrument, and fall the whole cycle into three modules : speed - adjusting module, pressure module and multi - execution instrument module. we must compile the related plc control program and pc control program, and redesign the control cabinet and re - fix the electric cycle. we complete the auto - control of the hydraulic experiment table through the loading and recapitulate debugging

    在保留其元件可裝拆性的基礎上,我們充分利用現有液壓實驗臺的液壓元件,對其基本迴路進行重新組合,分為調速、壓力和多執行元件控制迴路三個模塊,並編制可編程式控制制器程序和上位機數據採集程序控制迴路動作,重新設計該實驗臺的電氣控制櫃,並進行現場接線和安裝調試,實現所有教學必須實驗迴路的自動控制。
  15. At first, based on the theory of system engineering, through analysis, this system can be divided to four subsystems : locating tramcar, loading mine controlling, dispatching conducting and mining calculating, thus a general program of the system was worked out

    首先,應用系統工程的方法,對本系統進行分析,把本系統分解為礦車對位、裝礦控制、調度指揮和出礦計量四個子系統,確定了系統的總體方案。
  16. Emphasis is on how to choose the " appropriate " exercise loading, for this is the key to the success of the program

    如何選擇適當強度的離心收縮運動是本文重點,作者認?審慎的給予離心收縮運動,將可成功地減輕或治愈肌腱炎,使病人的關節恢復正常的功能。
  17. Finally, basing on the if sr receiver subsystem hardware platform, by ad6620 programming on the line and tms320c6713 loading the digital signal quadrant demodulation program, the thesis having realized the demodulation of the am signal, which validates the key thinking of software radio

    .最後,本文基於中頻軟體無線電接收機子系統硬體平臺,通過ad662o的在線可編程、 tms32oc6713加載數字信號正交解調程序,實現了對中頻am信號的解調,驗證了軟體無線電關鍵思想。
  18. Firstly the method of rayleigh - ritz and galerkin were adopted to analyze the beams under loading combined antisymmetric end moments with transverse uniformly distributed load theoretically, and the results were compared with that offered by kirby, p. a and nethercot, d. a, it showed that result was approximate and even lower and so to some extent the approach used in the paper is practice. secondly several principal factors that affect the beam stability were analyzed respectively, especially the shortening effect was mentioned scarely in some literature so far. at last, the author adopted the matlab to program the finite element software to analyze numerically, the results derived from it were agreed well with it

    本文分別採用了rayleigh - ritz法和galerkin法從理論上分析了反對稱端彎矩及橫向均布載共同作用下樑的等效彎矩系數,並與kirby , p . a和nethercot , d . a分析結果進行對比,結果表明本文採用的方法得出的等效彎矩系數與其得出結果比較,在均布荷載與端彎矩比例相差不大時基本接近或偏小,說明此方法是可行的,而當均布荷載與端彎矩比例較大時,應根據均布荷載作用進行彎矩等效方法來計算。
  19. On the base of fatigue loading spectrum achievements, combining the characteristics of large - span grid structure with hanging cranes and the using - requirement on fatigue loading spectrum of grid structure with hanging cranes, this paper has firstly put forward the theoretic method for constructing fatigue loading spectrum of grid structure with hanging cranes, organized the relevant program - - gjfls. and elementally established the program loading spectrum

    在繼承疲勞載荷譜已有成果的基礎上,本文結合網架設置懸掛吊車的特點以及網架疲勞載荷譜的使用要求,首次提出了網架疲勞載荷譜編制的理論方法,並編制了相應的程序( gjfls ) ,初步建立了網架程序載荷譜。
  20. So people introduce highly effective loading technology to support embedded software development and system updating. loading is the process of loading program into memory ready for running. dynamic loading means runtime loading - load modules in when program needs

    所謂動態加載,指的是,程序在運行期間需要調用某一模塊的功能時,由加載器將該模塊裝即時載入內存,進行相應的重定位處理后將控制權交還調用程序。
分享友人