loading site 中文意思是什麼

loading site 解釋
裝載地區
  • loading : n. 1. 裝貨。2. 裝載量;重量;載荷;(船隻等的)貨載。 3. 填充物,填料。4. 額外人壽保險。
  • site : n 1 地點;位置;地基。2 場所,現場。3 遺址。4 【計算機】網站,站點〈電腦網路用戶的網站地址〉;萬...
  1. Typically boh includes those areas of a venue designed to support the operations of the venue such as loading docks, administration offices, construction compounds, materials transfer, drop off areas, parking, salle ports, storage and site sheds

    典型的場館工作區包括用於支持場館運行這些地區:貨物裝卸地、辦公區、工程場地、物資交換地、工作人員候車區、停車場、倉儲區等。
  2. This paper related to a practical project that a high school is big bay building with teaching, experiment and studying, aim at the higher seismic fortification criterion region ( 8 degree of seismic fortification intensity ), aseismic disadvantageous building site ( iii type site ), and the building loading much ( the building " self - weight is over the 9. 0 kn / m2 ). compared to r. c. rectangle columns, studying the aseismic performance of the r. c. special - shaped columns pure frame structure, the r. c. special - shaped columns frame - truss structure and the r. c. special - shaped columns frame - shear wall structure

    本文,結合某中學大開間教學實驗綜合樓的具體工程,就抗震設防烈度較高地區( 8度)和抗震不利的建築場地(類場地) ,並且建築物所受荷載較大的情況(建築物自重超過9 . 0kn m ~ 2 ) ,通過與矩形柱分析比較的方式,研究了異型柱純框架結構、異型柱框架-桁架結構,以及異型柱框架-剪力墻結構的抗震性能。
  3. Considering the similitude law for shaking table test, we study the test results and obtain some conclusions which are a ) generally, the silty soil in test box liquefies and the liquefied time has relation with the amplitude of acceleration, b ) when the intensity is on and above eight degree, the silty soil deposit will be liquefied dramatically, c ) the relationship of the pore water pressure is relevant to the cycle loading which represents when the cycle loading ranges from little to great, the relationship is represent as a concave curve, or else as a protruding curve and tends to stability. ( 3 ) based on the triaxial compression test and the resonant column test, some studies are made such as a ) the duncan - chang parameters of constitutive model, b ) the dynamic shear modulus ratio and c ) the damping ratio of the site soil deposits. in order to deal with the test data, a computer program is compiled

    ( 2 )利用小型振動臺進行了k _ 0固結狀態下粉土的振動液化模擬研究,通過分析正弦荷載作用下的試驗資料,驗證了粉土的孔隙水壓力增長模式的合理性;從微分方程推導了基於土體振動臺模型試驗的相似律,並從模型實體、孔壓時程曲線和相似律等方面做出了分析,得出了如下結論:在小型振動臺試驗中,模型箱中的粉土都發生了液化,液化的時刻和輸入加速度幅值有關,而對頻率的變化不太敏感;粉土在相當於8 9度地震烈度的加速度幅值作用下可能產生嚴重的液化;孔壓的增長曲線形狀與施加的荷載有關:當施加荷載為由小到大的形式時,曲線形狀為上凹的曲線;當施加荷載為等幅的正弦荷載或荷載幅值由大到小時,曲線形狀為上凸的曲線,且逐漸趨于穩定。
  4. Measured results from in - site loading tests in tannin harbor and from in - door model tests were compared with predictions from the limit equilibrium methods. a method of estimating the bearing capacity for inhomogeneous medium was suggested to meet every case ; 4. according to the results from model tests, the elastoplastic fem were performed to study the procession of the change of the stress and strain in inhomogeneous medium and to simulate the procession of the forming of the failure surface during loading, and the failure mechanism was studied ; 5

    4 、結合模型試驗結果,確定出了符合非均質介質規律的彈塑性模式,在此基礎上分別運用二維、三維彈塑性有限元程序,模擬出了外荷載作用過程中非均質介質內部應力、變形以及破壞面的發展過程,分析得出了非均質介質地基的破壞機理; 5 、在港口工程地基設計當中,已經引入了可靠度理論計算分析基礎穩定性。
  5. Abstract : the transformation of the flowmeter and the control valve for water and oil phase flow, the control devices for oil - water phase ratio and blast hole charge and other control devices has eliminated the distinct dificiencies in the quality control of on - site mixed loading car of emulsified explosive and realized its automatic control so as to improve the quality of the products of emulsion and emulsified explosive and their blasting effect

    文摘:從水相和油相流量的流量計、控制水相油相流量的流量控制閥、控制油相水相配比的配比控制裝置、炮孔裝藥量控制裝置以及其他控制裝置的改造入手,改變原有乳化炸藥現場混裝車質量控制上存在的明顯不足之處,實現乳化炸藥現場混裝車的自動控制,提高了生產乳膠及乳化炸藥的質量和爆破效果。
  6. Provide on site support for customer ; co - ordinate with the truck drivers and warehouse staff, ensure safely and timely loading, as well as despatching

    為客戶提供駐廠式運輸調度及監裝服務;與卡車司機及倉庫人員協調,確保安全準時的裝車及發運
  7. Provide on site support for customer ; co - ordinate with the truck drivers and warehouse staff , ensure safely and timely loading , as well as despatching

    為客戶提供駐廠式運輸調度及監裝服務;與卡車司機及倉庫人員協調,確保安全準時的裝車及發運
  8. Based on a certain engineering practice, by analyzing many laboratory and in - site test data together with two groups of loading test, the variable regularity of physical mechanics properties of foundation soil is discussed

    根據某工程實例,通過室內外大量試驗數據的分析,並結合兩組靜載荷試驗,探討了地基土長期荷載作用下,土的物理力學性質的變化規律。
  9. This cpld based on - site monitoring data acquisition card can flexibly realize 3 triggering ways, including software triggering, hardware triggering and external triggering. in addition, this card can also realize optional 128 or 256 signal multiple frequency sampling. the fifo module in cpld ' s inner eabs ( embed array blocks ) further lead to the convenience of data saving and loading

    由於引入了cpld的控制技術,使數據採集卡的工作方式更靈活,可實現3種觸發方式的任意選擇,包括軟體觸發,硬體觸發和外部觸發;采樣率可控制,可選擇128或256信號倍頻;由於cpld內部有eab模塊,可實現內部fif0 ,使數據的存取更為方便。
  10. Videos can also be more demanding to loading a site

    視頻文件對站點的加載速度的要求也非常苛刻。
  11. Mission critical - must be done now else the whole thing goes down the tubes - e. g resolving a web hosting issue that stops your site from loading.

    任務關鍵人現在必須做全盤走低管子-育網路解決主辦地點的問題,你從裝車站
  12. Seven chapters are included in this thesis. the first chapter is the introduction about the necessity of bridge detection and common defect of the bridge. the second chapter introduces the structural basic condition and defect details of the bridge. the third chapter describes the preparation for the detection work. including the overall investigation of the diseases and the condition at operation, the set - up of loading test and control measures and structural computation. the 4th chapter is on - the - site detection, which consists of static and dynamic tests and necessary data collecting for analysis and evaluation. the 5th chapter is the analysis of detention data. according to collected data of loading tests, the results of static and dynamic tests are analyzed. the 6th chapter evaluates the strengths, rigidity. stability and dynamic characteristics of the bridge, so that the conclusion can be reached. the 7th chapter is summarization

    第六章是檢測評定結論,全面評定該橋的強度、剛度、穩定性和動力特性,從而給出檢測評定結論。第七章是總結,在對本項目的工作內容和工作特點進行總結的基礎上,指出了舊橋檢測存在的問題以及今後發展的方向。同時,通過對本次檢測工作的研究,初步形成了一套特大跨徑舊鋼橋的檢測評定方法,即:全面的病害和運營狀況調查、現實狀況計算分析、制定加載試驗方案和加載控制措施、加載試驗、綜合橋梁分析專家評定。
  13. Compared with conventional bracing technology, not only soil nailing will actively support soil masses, but also the effect of soil nailing and soil mass will be mobilized leading to utilize in - site strength of soils to a maximam degree. the disturbed soil masses that originally induce loading effect on bracing structure are transformed into a part of bracing structure. accordingly, the composite soil nailing bracing technique begins to applied to reinforcement of soft soils or foundations

    復合土釘支護技術中,土釘主動支護土體,並與土體共同作用,盡可能保持、利用、提高基坑邊壁土體的原有強度,將傳統支護方式中對支護結構形成荷載效應的擾動土體轉化為支護結構的一部分,從而可以有效地應用於軟土地區等特殊地質條件下的基坑支護。
  14. Compared with conventional bracing technology, not only soil nailing will actively support soil masses, but also interaction effect of soil nailing and soil masses will be mobilized leading to utilize in - site strength of soils to a maximum degree. the disturbed soil masses that originally induce loading effect on bracing structures are transformed into a part of bracing structures. accordingly, the composite soil nailing bracing technique begins to be applied to reinforcement of soft soils or foundations

    復合土釘支護技術中,土釘主動支護土體,並與土體共同作用,盡可能保持、利用、提高基坑邊壁土體的原有強度,將傳統支護方式中對支護結構形成荷載效應的擾動土體轉化為支護結構的一部分,從而可以有效地應用於軟土地區等特殊地質條件下的基坑支護,而且具有工藝簡單、造價低、工期短等優點。
  15. In order to fully develop the theory of squeezed branch piles, in particular, the justification of its superior performance in terms of the bearing capacity and sinking displacement, we have derived the analytical formulas of the axial load and the strain at arbitrary depth ; based on existing static loading test results and research on belled pile, together with the analysis of on - site testing data, we have applied the expand theory on sphere holes to the computation of radial stress of squeezed branch piles under hole expansion ; taking the oil pressure of hole expansion in to account, we have find the a branch force under certain hole pressures, hence we can estimate the maximum bearing capacity of single piles ; we have introduced the experiential formulas for the bearing capacity of squeezed branch piles based on its stress characteristic and pile testing data ; we have also done numerical simulations of squeezed branch piles utilizing finite element method software ansys ; we have matched the simulation res ults with those of on - site basic load experiments, regenerating the distributions of stress fields and strain fields of squeezed branch piles, and from those distributions, we can determine the optimal distances between plates and piles

    為了完善支盤樁的設計理論,探求支盤樁高承載力和低沉降量的內涵,本文推導出了支盤樁任意深度的截面荷載以及位移隨深度變化的理論公式;基於已有的靜載試驗成果及有關擴底樁的研究成果,從對現場測試數據的分析,將球形孔擴張理論引入到支盤樁擴孔時徑向應力的計算,考慮到擴孔時的油壓數據,求得某一孔壓下的支盤力,據此估算單樁極限承載力;同時根據對支盤樁的受力特點和試樁數據的分析,提出了支盤樁承載力計算的經驗公式;用有限元分析的方法,利用大型有限元分析軟體ansys對支盤樁進行數值模擬,並將模擬結果同現場的靜載試驗結果進行對比,再現了支盤樁在荷載作用下土中應力場和位移場的變化,根據應力場和位移場的變化范圍,指出最佳盤間距和樁間距;為支盤樁的設計和施工提供了一個可量化的設計依據。
  16. This paper, focusing on the construction in the tunnel section with the worse geological conditions, discusses systematically the theory and the actual application on natm, and puts forward the proposal that the natural states of surrounding rock must be disturbed as small as possible and the self - loading of rock should be made full use of. as emphasizing the main point of the method the study of doing extensively the work of the measurements and the relevent analysis in the site takes up the much space in the paper

    本文針對不良地質地段的隧洞施工,系統論述了新奧法的理論和在工程實踐中的應用,提出了應盡可能少地擾動圍巖的自然狀況並充分利用圍巖自身承載力;重點是要在現場廣泛開展監測工作和相應的資料分析;然後根據現場的監測信息以及對圍巖的觀察和認識,對設計進行及時反饋,及時優化支護和施工參數用於和指導現場施工。
  17. That often involved nonstandard tags or tricky shortcuts such as using tables to lay out a page, which could slow page - loading times drastically and complicate web site content management

    這常常涉及到非標準的標記或巧妙的捷徑,如利用表格設計頁面,這可能大大放慢了頁面的裝載速度,使網站內容管理復雜化。
分享友人