middle-pressure process 中文意思是什麼

middle-pressure process 解釋
中壓法
  • middle : n 1 中央,正中;中間,中部;中途。2 人體的中部,腰部。3 中間物,媒介物;中人,中間人,調解人;中...
  • pressure : n 1 壓;按;擠;榨。2 【物理學】壓力,壓強;大氣壓力;電壓。3 精神壓力,政治[經濟、輿論等]壓力。4...
  • process : n 1 進行,經過;過程,歷程;作用。 2 處置,方法,步驟;加工處理,工藝程序,工序;製作法。3 【攝影...
  1. By using ncep / ncar reanalysis data of height and wind, the inter - monthly lpac map, the climate lapc map, inter - annual anomaly map and mean variance map of monthly wind field of 850 and 500hpa and monthly height field of 850, 500, 150, 30hpa are calculated in a globe - belt area, which situates between 30 s and 75 n, from december 1957 to december 1997, according them we analysis the rule of the season transfer and anomaly of nh mean circulation. the results show that the climate map of lapc can describe the seasonal transfer process of large scale circulation better. the advance process of summer circulation establish is form south to north at the middle and lower level of the troposphere, that is reflected primly in the inter - monthly wind and pressure map of lapc ; at lower lever of stratosphere, the establish process is simulate to that of troposphere, and reflect of process of that the south asia high toward plateau ; at middle stratosphere the summer circulation establish begins at middle and high latitude initially, and then transmits to low latitude gradually, while the seasonal variability in mid - stratosphere is stronger than it in troposphere and low - stratosphere

    利用ncep ncar再分析高度場和風場資料,計算了30 s 75 n球帶區域1957年12月至1997年12月逐月850 、 500hpa風場及850 、 500 、 150 、 30hpa高度場月際局地型相似系數圖、多年平均圖(即氣候lpac圖) 、年際異常圖及均方差圖,在此基礎上,分析了北半球平均環流季節轉換及其異常的規律。分析表明,氣候局地型相似系數圖較好地給出了大尺度環流季節轉換發生的過程:在對流層中、下部,風、壓場月際局地型相似系數圖清楚地反映了夏季型環流建立由南向北的推進過程;低平流層夏季型環流的建立與對流層接近,其中,南亞高壓上高原過程有明顯反映:中平流層,夏季型環流的建立明顯表現為從中、高緯度開始,逐步向低緯傳播的特徵,且變化較對流層和低平流層明顯。
  2. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
分享友人