mine test equipment 中文意思是什麼

mine test equipment 解釋
水雷試驗設備
  • mine : pron 1 〈I 的物主代詞〉我的(東西),我的家屬,我的親戚。 The book is mine 這本書是我的。 He was ...
  • test : n 1 檢驗,檢查;考查;測驗;考試;考驗。2 檢驗用品;試金石;【化學】試藥;(判斷的)標準。3 【化...
  • equipment : n. 1. 〈常 pl. 〉設備,裝備,配件,配備物品。2. (一個企業除房地產以外的)固定資產。3. (工作必需的)知識,技能,修養。4. (火車)車輛;(汽車等)運輸配備。
  1. Coal mine equipment. troughed belt conveyors for loose bulk materials. cleaning scrapers and lateral bibs used for underground and for above ground. specifications. characteristics. test methods. acceptance testing

    採煤設備.鬆散集料用傳輸槽帶.地面和地下清除鏟運機和側閥栓.規范.特性.試驗方法.驗收試驗
  2. The company has advanced technologies and the first - class equipment of examination and test of products. main products as below, raw elevator guide rails, container beam channel, forklift beam channel, mine using inclined beam channel, tire steel, ship - making bulb steel, track steel, equal angle bar, angle with unequal, silicon steel sheets, etc. and among them, bulb steel and track steel are the special kinds of products paid much attention by country

    公司技術力量雄厚,檢測設備一流,產品主要有:電梯導軌毛坯集裝箱槽鋼叉車槽鋼礦用斜槽鋼汽車輪輞鋼船用球扁鋼履帶鋼等邊角鋼不等邊角鋼矽鋼片等,生產的「上三牌」電梯導軌毛坯技術含量高,是全國信得過產品,具有國際信譽。
  3. Coal mine equipment. flame retardation conveyor belts with steel cord for underground and for above ground. test methods and measurements

    採煤設備.井下和井上金屬簾線胎體防火焰送帶.試驗和測量方法
  4. Through the research on the reducer reliability and optimization design, the design quality of the drilling machine are improved greatly. it is proved that the type zk - 150 drilling machine capability is advanced and operation is reliable by examine and industrial test in coal mine. another advanced equipment provided to users has wide application foreground

    通過可靠性優化設計,使鉆機的設計質量得到很大提高,所研製的zk - 150型鉆機經性能檢測和工業性試驗證明:技術性能先進,機械運轉可靠,為煤礦提供了又一先進設備,具有廣闊的市場前景。
  5. Coal mine equipment. troughed belt conveyors for loose bulk materials. pulley covers used underground and for above ground. specifications. characteristics. test methods. acceptance testing

    採煤設備.鬆散集料用傳輸槽帶.地面上和地下滑輪蓋.規范.特性.試驗方法.驗收試驗
  6. With computer imitation and laboratory physical analog as the lead and on the basis of test ore blocks and industrial blownoff - ore rock tests, study on the enlarged - structure parameters of sublevel caving in meishan iron mine was carried out, which included single tests of drilling and blasting parameters , transition sublevels and equipment complementation. the timely popularization of this enlarging structural parameter technique has greatly improved the performances of the sublevel caving mining and promoted the technological advance of underground mining

    梅山鐵礦加大無底柱分段崩落法采礦結構參數研究,採用計算機模擬、實驗室物理模擬為先導,試驗礦塊、工業放出體試驗為基礎,分別進行了采場鑿巖爆破參數、過渡分段、設備配套等單項試驗,並在全礦及時進行了推廣應用,極大地改善了礦石開采過程中的各項指標,促進了地下礦山開採的技術進步。
分享友人