mitigation of risk 中文意思是什麼

mitigation of risk 解釋
減輕風險
  • mitigation : 和緩
  • of : OF =Old French 古法語。
  • risk : n 1 風險,危險;冒險。2 【保險】(損失的)風險(率);保險金額;被保險人,被保險物。vt 冒…的危險...
  1. Information risk and mitigation of supply chain based on the bullwhip effect

    的供應鏈信息風險及其弱化
  2. Sparedescription : based on the author s research and information from the usa and japan, the development trend of flood control and disaster mitigation in economically developed countries is introduced, including the follow aspects : flood risk management, floodplain management, flood control standard, city rainfall flood storage, levee construction technology, public participation, flood insurance, management of storage and detention zones, flood control investment, study on flood control and disaster mitigation, and formulation of related laws and regulations

    描述:根據美、日等國最新文件和資料,結合作者多年的研究,簡明地介紹經濟發達國家在防洪減災方面的最新發展趨勢.內容涉及洪水災害風險管理、泛濫原管理、防洪標準、城市雨洪調蓄、堤防建設技術、公眾參與、洪水保險、蓄滯洪區管理、防洪投入、防洪減災科學研究、法規建設等諸多內容
  3. In addition, bp has distinctive strengths in energy statistics and information, risk assessment and management, corporate governance, and hse. it actively participates in the discussion of major global hot issues ( like global climate change and greenhouse gas emission ) and put into practice mitigation measures

    另外, bp公司在信息統計,風險預期與管理,企業良治,健康,環境與安全( hse )等方面都具有獨到的優勢,並積極參與全球重大熱點問題(如全球氣候變化和溫室氣體排放等)的探討和實踐。
  4. Reducing the probability and or impact of a risk to an acceptable level. risk mitigation is not risk avoidance

    將風險的發生概率和/或影響降低到一個可接受的水平。
  5. This article discusses risk assessment of urban earthquake disaster, which includes risk assessment, vulnerability assessment, disaster prevention and mitigation capacity assessment

    摘要從危險性評價、易損性評價以及防災減災能力評價3個方面闡述了城市地震災害風險評價內容。
  6. The present paper gives a description of the type, control and risk assessment of the geological hazards in danba, western sichuan, and some suggestions are made for the precaution and mitigation of the future geological hazards in this county

    摘要本文綜述了丹巴縣地質災害在地區、地理及季節氣候方面的發育分佈特徵,總結了地質災害的活動與危害現狀,進行了危害程度評億和地質災害分區評價,並提出了非工程預防和工程治災方面的地質災害防治建議。
  7. The phased approach to the soa - based enterprise architecture allows for easier mitigation of risk associated with changes to an enterprise it infrastructure

    基於soa的企業體系結構的方法使得在對企業it基礎架構進行變更時,相關的移植風險更小。
  8. It has not clearly addressed the risk of failure in implementing the mitigation measures, and what would be done if the recommended measures fail to achieve the expected ecological functions

    環評報告沒有清楚估量彌償措施失敗的危機,故亦缺乏應變計劃處理彌償措施未能達致預期功能的後果。
  9. Clear guidelines for evaluation of the appropriateness and effectiveness of the proposed ecological mitigation measures should be formulated so that the risk of failure of the proposed mitigation measures would be minimized

    制定清晰的指引,評估建議的生態緩解措施是否適用及有效,以免建議的緩解措施,不能達致預期成效。
分享友人