moving rail 中文意思是什麼

moving rail 解釋
輸送機
  • moving : n. 1. 活動,移動;煽動,感動。2. 〈pl. 〉〈口語〉電影。adj. 1. 動的;移動的。2. 使人感動的,動人的。3. 主動的,原動力的。
  • rail : n 1 (圍欄等的)橫木,橫檔;(釘帽架等用的)橫條,欄桿,扶手;〈pl 〉圍欄。2 軌道;鋼軌;鐵路;〈...
  1. Moving - block signaling system indicates the development tendency of urban rail transit signaling system

    移動閉塞是城市軌道交通信號系統的發展方向。
  2. In the us, truck rates for moving merchandise in small quantities are about the same as those for rail freight

    (在美國,用卡車搬運少量商品的運費,與鐵路搬運貨物的費用,大約相同。 )
  3. It also calculates theoretically the minimal time interval between two trains in quasi - moving - block signaling system and recommends approximate values for the length of coded digit track circuit. the rapid development of urban rail transit demands a deep understanding on the features of track circuit

    在此基礎上,針對當前應用廣泛的基於數字軌道電路的準移動閉塞atc系統進行了重點分析,詳細討論了數字軌道電路的原理、準移動閉塞系統的列控方式等內容,並對準移動閉塞下的最小列車追蹤間隔時間進行了理論計算和分析,給出了數字軌道電路長度的推薦值。
  4. As shown in this diagram, these factories can be concealed easily, either by moving ordinary - looking trucks and rail cars along iraq ' s thousands of miles of highway or track, or by parking them in a garage or warehouse or somewhere in iraq ' s extensive system of underground tunnels and bunkers

    正如這張圖表所示,這些工廠非常容易隱藏,它們可通過在伊拉克數千公里的公路和軌道上行駛的、看上去普普通通的卡車或軌道車來隱藏,可以停放在車庫、倉庫或其他伊拉克龐大的地下遂道和掩體里。
  5. It is found that by taking advantage of the simple constructed rail - guided carts, the labor saved ranges from 20 % to 44. 5 % for moving the seedlings into the nursery locations ; and 47. 6 67. 3 % labor can be saved for moving the seedlings out

    手推式與電動式跨植床軌道搬運車之入苗作業,比完全人力搬運節省勞動力20 44 . 5 % ;出苗作業時,節省勞動力47 . 6 67 . 3 % 。
  6. Analysis of dynamic characteristics of rail system induced by moving load

    移動荷載作用下軌道系統的動力特性分析
  7. And hong kong is fortunate to be equipped with a financial infrastructure that is as advanced, reliable and efficient as the road, rail and airport facilities that keep our city moving

    幸好,香港不僅具備優良的道路鐵路和機場設施,其金融基礎設施也同樣先進可靠和有效率,使香港能不斷向前邁進。
  8. According to the planning, airport light rail originates from the nanjing south railway station, running westward along the high speed railway corridor to the airport expressway, moving northward along the airport express corridor arriving at the lukou airport finally

    按照規劃,機場輕軌線在南京南站為始發站,出站后沿高速鐵路走廊向西至機場高速公路,然後沿機場高速公路走廊向南至南京祿口機場。
  9. Based on an analysis on the present situation and development of three kinds of signal systems ( the point system based on interrogator responsor, the quasi - moving block system based on digital track circuit and the moving block system based on wireless data transmission ) in urban rail transit, some suggestions on the localization of signal system of urban rail transit are put forward

    摘要在分析三種城市軌道交通信號系統制式(基於查詢應答器的點式系統、基於數字軌道電路的?移動閉塞和基於無線數據傳輸的移動閉塞)的現狀和發展基礎上,對實現我國城市軌道交通信號系統國產化提出建議。
  10. With an introduction of the moving block system applied in wuhan rail transit project, the author analyzes atc operation mode which is based on moving block technique, and fallback mode, an auxiliary safety operation when fault occurs in moving block system, finally describes the failure management in the operation of the 1st phase of wuhan urt line 1

    摘要以武漢軌道交通1號線一期工程信號系統的移動閉塞為例,介紹了移動閉塞技術下的atc模式以及針對工程項目制定的運營輔助手段後退模式,並討論了一期工程中運營的故障管理策略。
  11. The moving loads and reaction caused by rail are discrete by stepwise constant functions in time domain. the calculation of load effects is simply, but the calculation of the effect of react force is complicated. the calculation of the vibration caused by react force is discussed in detail, and compared with continuous model

    在時間域內,將移動荷載和其引起的軌道的響應利用階躍函數進行離散化,簡化了荷載作用的計算,但是由於反力的計算十分復雜,所以本文對由反力引起的振動的計算進行了詳細的分析,並與連續性模型進行了對比。
  12. Moving the alignment to the north will require the relocation of the sheung shui slaughterhouse, the shek wu hui sewage treatment works, and five dongjiang water mains located right next to the existing east rail

    若是把路線往北移,必須重置上水屠房、石湖墟污水處理廠及五條緊貼東鐵的東江水管,影響鮮肉的供應、污水處理及食水供應,對社會民生造成不便。
  13. According to different mechanisms, there exist several types of resonance, including the bridge resonance induced by the periodical actions of moving load series of the weights, centrifugal forces and lateral winds of vehicles, the bridge resonance induced by the loading rates of moving load series of vehicles, the bridge resonance induced by the periodical loading of train vehicles excited by rail irregularities, wheel flats and hunting movements, and the vehicle resonance induced by periodical actions of the regular arrangement of bridge spans and their deflections

    根據發生機理的不同,車橋系統可能發生幾種不同形式的共振,包括由車輛重量、離心力、橫向平均風荷載等形成移動荷載列的周期性動力作用引起的橋梁共振,由移動荷載列加載速率引起的橋梁共振,由軌道不平順、車輪扁疤、輪對蛇行等周期性加載引起的橋梁共振;由橋跨的規則性排列及其撓度的影響,對移動車輛形成周期性動力作用使車輛出現的共振。
  14. In this particular condition that studying the dynamic response of rail system under the speedy moving loads, it has been already proved by the calculation results that the rail models and calculating methods applied in this problem are rational

    在此基礎上選取euler梁模型以及timoshenko梁模型進行分析。從計算結果看,在研究高速移動荷載作用下軌道系統的動力響應這種特定情況下,本文提出的模型與計算方法是合理的。
  15. The major research of this paper is that : 1, it is analyze the displacement response of the elastic - foundation beam by the static loads and the moving loads, the dynamic response of winkler beam, analyze the influence of the sleeper in the dynamic response of the rail system. and compare the result with the experiment formulation. it is concluded that the continuous model only fit for the lower moving velocity of loads

    本文主要進行了以下幾方面的研究: 1 、首先對靜力荷載作用下彈性地基梁的位移反應、文克爾梁模型的動力響應,及枕木在軌道系統動力響應中的作用進行了分析,並與傳統採用的經驗公式進行對比,以此分析了連續性模型只適用於荷載移動速度較低的情況下,在速度較高的情況下,特別是接近臨界速度時,連續性模型是無效的。
分享友人