nail wall 中文意思是什麼

nail wall 解釋
甲廓
  • nail : n 1 指甲 爪;喙甲。2 釘。3 納爾〈舊量布尺度名 約合5 715cm〉。vt 1 敲釘 釘住 (on to)。2 〈口語〉...
  • wall : n 1 墻壁;(石、磚等的)圍墻;城墻。2 (形狀、用途)像墻壁的東西,障壁;土堤,堤防。3 (礦井、容...
  1. Between the corner of a wall and the plank must be remained 1cm to 1. 5cm to take the expansion and contraction crevice, the plank and the ground is fixed with the nail, dont permit to join with the glue water

    墻角與木板間需留1至1 . 5作為伸縮空隙,板條與地面用釘子固定,絕不允許使用膠水膠接。
  2. The sentry box of the activity fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make up finalize the design the prefab system. construction swift, being portable, especially suitable for urban municipal administration, entrance guard room, service department, etc

    活動崗亭是通過充分利用夾芯墻板及屋面板的自身強度,通過拉釘螺栓自攻釘將鋼結構底座墻面夾芯板和屋面板連接組成的房屋系統。
  3. The application of soil nail wall in base pit underprop safeguard

    基坑支護中土釘墻的應用
  4. This is a true story happened in japan, to decorate room, someone removed wallboards. in general, the structure of japanese style building is of double layers wall covered by lime, and the inside is empty. when he removed the wallboards, he found one gecko was fixed there, one nail from outside board tacked its tail

    在日本,發生了一件千真萬確的事:有人為了裝修家裡,拆開了墻壁日式住宅的墻壁通常是中間架了木板后,兩邊批上泥土,其實裏面是空的。他拆墻壁的時候,發現一隻壁虎被困在那裡,一根從外面釘進來釘子釘住了那隻壁虎的尾巴。
  5. 7, 0. 9cm to 1. 5cm place to the wall start to nail the first floor, that 0. 9cm to 1. 5cm the expansion and contraction crevice can be covered up with gangway and the angle line after the floor finished

    7距離墻邊0 . 9至1 . 5處開始面釘第一片地板,此0 . 9至1 . 5的伸縮空隙于地板完工後可用跳腳板或角線遮掩。
  6. He caught his coat on a nail projecting from the wall

    他的外套被墻上的一顆鐵釘鉤住了。
  7. Homeproductseven roof flat roof fully use internal wall panel and one s own intensity of the roof boarding, through draw nail, bolt, connection nailed to make

    是通過充分利用夾芯墻板及屋面板的自身強度,經過拉釘螺栓自攻釘的連接而組成的定型活動房屋系統。
  8. Drilling temporary soil nail for retaining wall no. 44 at cheung sha

    于長沙的擋土墻編號44進行臨時泥釘鉆孔的工程
  9. The study results reveal some laws : ( 1 ) two failure modes exist in different obliquity slope and influence the internal force of soil nailing ; ( 2 ) the connection between face shield and soil nailing determines the distribution of the axial force along length ; ( 3 ) the influence of face shield involves its connection with soil nailing and its stiffness on soil nailing wall ; ( 4 ) the transversal effect of soil nailing depended on the joint of nail head is little ; ( 5 ) the maximum axial forces of other soil nailings except the first soil nailing increase gradually with excavation

    研究表明: ( 1 )素土坡隨著坡角的變化,存在兩種破壞方式,破壞方式不同,土釘受力狀態不同; ( 2 )土釘和面層的連接方式決定著土釘長度方向上的軸力分佈形態; ( 3 )面層主要通過面層與土釘的連接和面層的本身剛度兩個方面對土釘內力和墻體變形產生影響; ( 4 )土釘橫向抗剪抗彎作用的發揮程度和土釘釘頭的連接方式有關,但作用不大,實際設計時可以忽略其影響; ( 5 )隨著坡體的開挖,第一排土釘的最大軸力變化不大,其它土釘的軸力都穩步增加。
  10. I, at least, had nothing more to do : there were my trunks, packed, locked, corded, ranged in a row along the wall of my little chamber ; to - morrow, at this time, they would be far on their road to london : and so should i, - or rather, not i, but one jane rochester, a person whom as yet i knew not. the cards of address alone remained to nail on : they lay, four little squares, in the drawer

    我的箱子已收拾停當,鎖好,捆好,沿小房間的墻根,一字兒擺開,明天這個時候,這些東西會早已登上去倫敦的旅程,還有我如蒙上帝恩允或者不如說,不是我而是一位我目前尚不認識的,叫作簡羅切斯特的人,只有地址標簽還沒貼上,那四個小方塊仍躺在抽屜里。
  11. Based on analysis of the characteristics of the composite soil nailed wall, simulating the soil nail, concrete layer, deep mixing pile and step excavation, a model is established to calculate the deformation of the wall, compiled simple and applied program of one dimension fem ; according to the field test data and the calculated data by the fem software this paper has developed, the design method and deformation of the wall in xi ' an area is discussed. the shape of destructive sliding surface of the wall in loess strata in xi ' an area with deep groundwater is gotten. finally the lateral deformation distribution and the experiential formula to predict maximal horizontal displacement of the composite soil nailed wall are given

    針對復合土釘墻構造的特點,建立了模擬復合土釘墻受力變形的一種計算模型,該計算模型可對土釘、面層、深層攪拌樁以及分層開挖等進行簡化模擬;編寫了簡單實用的桿系有限元程序;結合工程實測資料及有限元法分析的結果,探討了西安地區的土釘設計以及復合土釘墻的變形規律,得出了西安地區一般黃土在無地下水時的破壞滑動面形狀,復合土釘墻的側向變形曲線以及計算復合土釘墻最大水平位移的經驗公式。
  12. I will nail up the new pictures on the wall

    我會把這些新的圖畫釘在墻上。
  13. To nail bad guys ' asses to the wall like trophies

    … …像戰利品一樣把那些混蛋們的屁股釘在墻上
  14. The application of soil nail wall in base pitprop safeguard

    淺述土釘墻施工技術在基坑支護中的應用
  15. Application complex soil nail wall in deep foundation pit support

    復合土釘支護技術在大型深基坑中的應用
  16. Construction monitoring and accident analysis for deep foundation pit braced by soil nail wall

    某深基坑工程設計施工與監測
  17. Construction practice on composite soil nail wall support for deep foundation pit under soft soil conditions

    土釘擋墻技術在深基坑支護中的應用
  18. The study showed that soil - nail wall supporting technology not only supported the soil, but it had merits that the other supporting technologies did not have

    結果表明:土釘墻支護技術不僅能夠達到支護邊坡穩定安全,而且具有其他支護方案無法比擬的優點。
  19. Soil - nail wall supporting technology formed a gravity earth retaining wall by embedding some given size and given density slender bars and sprayed concrete in reinforced soil

    摘要土釘墻支護技術通過在被加固土體內植入一定長度和密度的細長桿件與噴射混凝土面板,形成了一個類似重力式擋土墻。
  20. Fifteen degree or so of nail and anchor inclination is the optimized. some certain value of nail space is proposed by which soil nailing structure and earth nail wall can be differentiated. the method to analyze the gravity retaining wall is applied to earth nail wall

    建議土釘和錨桿傾角採用15左右為宜;當土釘間距小於某一值,或土釘密度大於某一定值時,土釘支護形成重力式擋土墻,即土釘墻,此時可以採用重力式擋土墻的分析方法對土釘支護進行分析。
分享友人