no-seam 中文意思是什麼

no-seam 解釋
無縫
  • no : adj 1 〈加在單數名詞前,相當于冠詞 a an 的否定形式〉(一個也)沒有。 Is there a book on the table...
  • seam : n 1 縫;線縫。2 介面;接縫;接合處;接合線。3 裂縫。4 (臉上的)皺紋。5 傷痕。6 【造船】(船板間...
  1. It is suitable for wearing corselet with no seam or with whole cups

    無縫胸圍或全杯的簡單設計最為適合。
  2. Concentration of harmful trace elements in no. 2 - 2 coal seam of majiata strip mine

    馬家塔礦煤層中有害痕量元素的質量分數特性
  3. Structural features of coal body in seam no. 8 and regional prognosis of coal and gas outburst in panji mine no

    大寧煤礦突出預測敏感指標及臨界值的探索
  4. Coal facies analysis upon no. 16 coal seam in yanzhou coal mining area of shangdong province

    山東兗州礦區太原組16號煤層煤相研究
  5. Several ways of safe drivage of directly mining no. 8 seam

    直采8號煤層安全掘進的幾點做法
  6. According to differences of construction process, boundary condition, temperature and stress of two schemes extending 3m deep short seam on upstream face in the middle of rcc overflow section and no short seam are calculated, what " s more, in this paper the equivalent line drawing of stable temperature field and unstable temperature field during construction and operation period and the duration curve drawing of typical points " s temperature and stress are plotted, and the results of peak and minimum on temperature in every month and maximum on tensile stress are attained

    根據施工過程和邊界條件,對溢流壩段中間上游面增設3m深短縫和不設短縫兩個方案進行了溫度和應力計算,並繪制出穩定溫度場等值線圖及施工期、運行期非穩定溫度場等值線圖,典型點溫度和應力歷時曲線圖,逐月最高、最低溫度和最大拉應力及相應位置等成果。
  7. The gaussian curvature of no. 3 coal seam in qinshui basin is calculated

    計算了沁水盆地3號煤層的高斯曲率。
  8. Part no. 1. butting seam for cup

    1 .杯位合拼縫及襯里
  9. The construction methods and caving protection measures for punching high thick and loosen soft coal seam in luling coal mine no. 2 dark tilt well in huaibei coal mine area are introducded. they include small section enlarged after the heading caving, high negative pressure and multi - raw drilling holes and strenous drawing - off, concentrated cross drill holes, cutting while drawing - off and putting the metal frame away

    介紹了淮北礦區蘆嶺煤礦2主暗斜井採用小斷面導硐后刷大、高負壓多排鉆強抽,密集交叉鉆孔邊掘邊抽及設置金屬骨架施工方法和防突措施揭穿高突特厚松軟煤層。
  10. The design of bolt - rope support in no. 9 seam entries

    9號煤半煤巖巷道錨桿錨索支護設計淺析
  11. Fully mechanized high top coal caving mining technology in hard coal seam of honghui no. 1 mine

    紅會一礦堅硬煤層大放高綜采放頂煤開采技術
  12. Gas - geologic characters of 720 coal seam and controlling of gas emission abnormally in no. 2 coal mine of pingdingshan coal group

    平煤二礦庚20煤層瓦斯地質特徵及異常湧出的防範
  13. Study of the roadway of no. 6 coal seam position layout in shigouyi mining area

    石溝驛礦區六層煤巷道層位布置研究
  14. Structural feature of quandian minefield, yuzhou coalfield and its influence on no. 21 coal seam

    禹州煤田泉店井田構造特徵及對其二1煤層的影響
  15. Fully mechanized longwall top coal caving mining with light weight hydraulic powered supports applied to no. 30 seam mining in dongrong no. 3 mine

    輕放工藝在東榮三礦30號煤層開采中的應用
  16. Application on predrainage of seam in hebi no. 8 coal mine

    預抽煤體瓦斯在鶴壁八礦的應用
  17. Discussion on implementation plan for anjialing open pit mine passing through no seam area

    安家嶺露天礦無煤區過渡實施方案探討
  18. It is a distributed and embedded supervision system which integrates an embedded system with network - linking function into a distributed control system with can bus. it caniirmly transmit information of industrial field and implement no - seam connect between control field and mis. it has been successfully applied in an actual remote supervision system for multi - module of inverters

    本文研究的基於can總線的分散式嵌入式遠程監控系統即由canbus這種優秀的現場總線組成的分散式控制系統與具有網路功能的嵌入式系統集成后的分散式嵌入式遠程監控系統,可使工業控制現場的數據信息實時可靠地傳輸,實現工控現場與管理信息系統( mis )的無縫連接。
  19. Preliminary test on prospecting of geological structure of coal face in no. seam of fenghuangshan mine

    煤層工作面地質構造探測的初步試驗
  20. Stainless steel seamless tube / pipe is a kind of long rolled steel products , which have hollow section , and the peripheral have no seam

    無縫鋼管即是一種具有中空截面、周邊沒有接縫的長條鋼材。
分享友人