normal water level 中文意思是什麼

normal water level 解釋
正常水位標準水位
  • normal : adj 1 正常的,平常的,普通的;平均的。2 正規的,標準的,額定的,規定的。3 智力正常的,精神健全的...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • level : n 1 水平儀,水準儀;水準測量。2 水平線,水平面;水平狀態;平面,平地。3 水平,水準;水位;標準;...
  1. Once the pressure of the main network returns to normal, the valve flap of drainage outlet closes under pressure, first, second level check valves open, the main network return to supply water to branch pipeline

    一旦主管網壓力恢復正常,排污口閥瓣受壓關閉,一二級止回閥打開,主管路恢復向支管供水。
  2. When the water is full, the bwf should be stopped immediately, then to weak firing and open blowdown and drain valves till the water level returns to normal

    滿水后應減少給水或及時排水,立即停止鍋爐給水,並減弱燃燒,開啟排污閥及流水閥,直到水位恢復正常后才關閉。
  3. The optimum normal water level is decided by the hamming approach degrees of each plan

    以待選方案與最優方案間的海明貼近度來決策水庫正常高水位。
  4. The safety factors of the most likely sliding paths are 4. 15 and 3. 05 for 9b and 4b respectively at normal water storage level

    另外,壩踵以下14m深度范圍向下游階梯式滑出也是安全系數較小的滑移路徑,但不是控制路徑。
  5. Based on the project scale argumentation of letan hydropower station, the paper briefly introduces the main results of scheme ' s technical & economical comparison and the main factors of scheme option in the option and design stage of the normal storage water level and installed capacity, as well as the evaluating opinions given by the specialist group of project proposal evaluating committee ; the main technical characteristics for similar project scale argumentation are summarized up according to the project scale design argumentation of letan hydropower station

    摘要通過樂灘水電站工程規模論證,簡述該工程正常蓄水位選擇和裝機容量選擇設計階段方案技術經濟比較的主要成果、取捨方案的主要因素、以及項目建議書評估會專家組的評估意見;並根據樂灘水電站工程規模設計論證總結類似工程規模論證時的主要技術要點。
  6. I analyzed dynamic characteristics of vapor wraps water level and combustion control system, i compared the normal pi controller with combined controller of fuzzy controller and fuzzy - pi controller through the computer

    分析了鍋爐汽包水位動態特性和燃燒系統的動態特性。通過計算機把常規pi控制器與fuzzy控制器及fuzzy ? pi組合控制器進行了比較。
  7. Water level in the tolo harbour was as high as 5. 4 metres above chart datum as compared with the normal high tide of 2. 2

    吐露港的潮水高度竟達海圖基準面以上5 . 4米,而正常的漲潮只有2 . 2米。
  8. " field observation of high rock - fill dams and feedback data analysis " and " dynamic analysis of high earth and rock - fill dams and aseismatic measures ", the concepts and methods obtained in the above two consulting items were creative and evaluated by the ministry of electric power as being of international level. the research findings were adopted in such large - scale projects as the tianshengqiao water contral project, ming tombs water control project. dahe water contral project, ming tombs water control project, dahe water control project and lianhua water control project and awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 2 ) the research on the stress - strain correlation of dam construction materials was awarded the second prize of scientific and technical advancement of the ministry of electric power. ( 3 ) the result of the field observation test and computational analysis for the tailing dam improvement project of xuzhou power plant was adopted by the east - china design institute of electric engineering with considerable economic benefit. ( 4 ) the result of the geotechnical test and data analysis of wenfu mine project was applied in the project with considerable economic benefit. ( 5 ) the field observation and data analysis of the kezier reservoir project provided a solid base for ensuring the normal operation and management of the reservoir

    「高堆石壩原位觀測和反潰分析研究」及「高土石壩動力分析及抗震工程措施研究」咨詢項目提出了具有開拓性的觀點與方法,經電力工業部鑒定評為國際先進水平,該兩項成果已應用於天生橋、十三陵、大河、蓮花等大型工程獲電力工業部科技進步二等獎; 「壩料土動力應力應變關系的研究」咨詢項目獲電力工業部科技進步二等獎, 「徐州發電廠灰壩加固工程勘測試驗與計算分析」咨詢成果已被華東電力設計院設計采納,工程效益顯著; 「甕福磷石膏渣場工程土工試驗與數值分析」咨詢成果已應用於國家重點工程甕福礦肥基地建設,效益顯著; 「克孜爾水庫工程原型觀測數據庫與資料分析」咨詢項目為水庫運行與管理提供了有力保證。
  9. When combined method is applied, damaged area develops from down stream to up - stream, besides, controlling effect of discontinuous joints is shown. at normal storage water level, the combined safety factors are 4. 05 and 3. 75 for 9b and 4b respectively

    結果表明,超載法時,破壞區從上游向下游發展,且破壞前鋒一直沿建基面附近;綜合法時,破壞區從下游向上游發展,並表現出裂隙結構面參數的控製作用。
  10. Based on the information entropy theory and fuzzy matter - element theory, an information entropy fuzzy matter - element model for normal high water level of reservoirs is described

    摘要基於信息熵理論和模糊物元分析理論,探討了水庫正常高水位的熵模糊物元決策模型。
  11. Venice was hit by a common seasonal phenomenon as winds and tides backed up the adriatic waters, causing levels in the lagoon to rise. according to the city ' s flood center, the water rose 1. 32 meters four foot four inches above normal sea level

    據法新社12月3日報道,威尼斯市洪水防範部門透露,截至3日晚上,威尼斯瀉湖的水面已經比正常情況下上漲了1 . 32米。
  12. Refers to areas that are effectively irrigated, i. e. level land which has water source and complete sets of irrigation facilities to lift and move adequate water for irrigation purpose under normal conditions

    指具有一定的水源,地塊比較平整,灌溉工程或設備已經配套,在一般年景下當年能夠進行正常灌溉的耕地面積。
  13. 2. the particular water level - controlling circuits and sensor circuits in the patrolling point can monitor the change of water level and the vibration of apparatus in order to inform managers in time. at the same time if the change is n ' t within normal range, the alarming circuit can send the message. 3

    2 、在巡檢點中設置了獨特的液位監控電路和傳感器電路以便及時監測水位變化和水輪機組振動情況,將變化數據快速通知管理者,若變化在規定范圍之外,巡檢儀中的報警電路將及時報警。
  14. After the three gorge reservoir, the yangtze river storing water to 175m ? ts normal water level, almost the whole fengjie city would be submerged

    長江三峽水庫正常蓄水175m后,奉節舊縣城幾乎將會被全部淹沒,需全部搬遷。
分享友人