north lantau expressway 中文意思是什麼

north lantau expressway 解釋
北大嶼山快速公路
  • north : n 諾斯〈姓氏〉。n 1 〈通常作 the north〉北,北方,北部。2 〈N 〉英國北部;〈N 〉美國北部各州。3 ...
  • lantau : 大嶼山
  • expressway : ( 城市 ) 快速路
  1. Transport - roads - landscape works along north lantau expressway

    運輸-交通控制-快速公路路線指示標志改善工程
  2. The patronage forecast for the airport express line ( ael ) made in the new airport master plan ( the plan ) in 1991 was based on a number of assumptions, including competition from buses, ael s fare level, air passenger volume and composition, and congestion on north lantau expressway

    於一九九一年擬訂的新機場總綱計劃(計劃)中所預測的機場快線乘客量,是基於一系列的假設,包括來自巴士的競爭、機場快線的票價水平、飛機乘客量和組合,以及北大嶼山快速公路的擠塞情況。
  3. North lantau expressway and lantau fixed crossing

    北大嶼山快速公路及青嶼干線
  4. The tsing ma control area ( tmca ), a 17 - kilometre expressway network comprising tsing kwai highway, cheung tsing tunnel, cheung tsing highway, north - west tsing yi interchange, lantau link, ting kau bridge and part of north lantau highway, is operated and maintained by a private management contractor. tmca is equipped with extensive traffic control and surveillance system

    青馬管制區(管制區)包括全長17公里的快速公路網,由青葵公路、長青隧道、長青公路、西北青衣交匯處、青嶼干線、汀九橋及部分北大嶼山公路組成,由私營管理承辦商負責營運和維修。管制區裝設了大覆蓋范圍的交通管制及監察系統。
  5. The tsing ma control area ( tmca ), a 17 - kilometre expressway network comprising tsing kwai highway, cheung tsing tunnel, cheung tsing highway, north - west tsing yi interchange, lantau link, ting kau bridge and part of north lantau highway, is operated and maintained by a private management contractor

    青馬管制區(管制區)包括全長17公里的快速公路網,由青葵公路、長青隧道、長青公路、西北青衣交匯處、青嶼干線、汀九橋及部分北大嶼山公路組成,由私營管理承辦商負責營運和維修。
  6. Route 9 - an expressway to the hong kong international airport at chek lap kok and tung chung new town. it consists of the north lantau highway and lantau link and serves as the main and only land connection between lantau island and the mainland

    九號干線-一條通往國際機?及東涌新市鎮的快速公路,包括北大嶼山快速公路及青嶼干線,亦是連接市區與大嶼山的唯一主要陸上通道。
  7. A new expressway system comprising the north lantau highway, lantau link, cheung tsing highway, cheung tsing tunnel, tsing kwai highway, west kowloon highway and western harbour crossing, was opened to traffic in mid 1997

    一個新的快速公路系統已在一九九七年年中通車,包括北大嶼山公路、青嶼干線、長青公路、長青隧道、青葵公路、西九龍公路及西區海底隧道。
  8. Regarding the traffic arrangements for the north lantau expressway since it was opened to vehicles, will the government inform this council

    關于北大嶼山快速公路通車后的交通安排,政府可否告知本局:
  9. North lantau expressway taking shape with chek lap kok airport site in the background, airport railway depot and rail reserve on the right

    赤?角機場作背景的北大嶼山快速公路,右方為機場鐵路車站及鐵路預留空間
  10. Furthermore, the north lantau expressway is already forecast to be congested, connection to the cross links will further stretch its capacity

    政府已預測北大嶼山快速公路將會十分擠塞,如再連接跨界通道,只會進一步加重其負荷。
  11. A dedicated route away from residential area is adopted. it starts from north lantau expressway, tsing ma bridge, cheung tsing highway, tsing yi road west, tsing yi road and finally reaches cwtc at the southern side of the tsing yi island

    (二)運送路線遠離住宅區,以北大嶼山公路作起點,經青馬大橋、長青公路、青衣西路和青衣路,最後到達位於青衣南端的化學廢物處理中心。
  12. The exhibition centre has five exhibition areas, introducing the hong kong international airport and its related infrastructure projects, including the lantau link, the airport railway, the western harbour crossing, the north lantau expressway, travel route 3, the western kowloon expressway, the west kowloon reclamation, the central and wanchai reclamation, and the tung chung development

    展覽中心設有5個展區,介紹香港國際機場和相關的龐大基建工程,包括:青嶼干線、機場鐵路、西區海底隧道、北大嶼山快速公路、三號干線、西九龍快速公路、西九龍填海計劃、中環及灣仔填海工程和東涌發展計劃。
  13. These included the community chest western harbour crossing walk on march 16 ; a duathlon on the north lantau expressway on april 20 ; the tsing ma bridge marathon and 10 km race on may 4 - the largest single individual participation event in the history of running in hong kong with over 5 000 local and overseas runners from 14 countries - and the community chest lantau link walk on may 11, with around 80 000 members of the public participating

    這些活動計有三月十六日的公益金西區海底隧道百萬行、四月二十日的北大嶼山快速公路兩項鐵人錦標賽、五月四日的青馬大橋馬拉松及十公里賽(香港歷來最大型的個人參賽項目,共有超過5000名來自本地及海外14個國家的健兒參加) ,以及五月十一日的公益金青嶼干線百萬行(約有8萬名市民參加) 。
  14. Whether the government will consider relaxing the present speed limit imposed on other major highways in the territory to bring it in line with that imposed on route 3 and route 9, so as to avoid the occurrence of bottlenecks on those highways as a result of traffic coming in from the direction of the new airport and the north lantau expressway ; if not, why not

    會否考慮放寬現時對本港其他主要公路施加的車速限制,使之與三號干及九號乾的車速限制看,藉以避免有關公路在新機場啟用及北大嶼山快速公路通車后,
  15. The strategic expressway system to lantau and north - west new territories needs to be carefully managed to ensure smooth traffic flow

    為使這個通往大嶼山和新界西北部的快速公路網保持交通暢順,完善的管理是必不可少的。
分享友人