one-stage design 中文意思是什麼

one-stage design 解釋
一階段設計
  • one : adj 1 獨一個的,單一的。 one hand 一隻手。 one shot 只出一期的雜志。 O swallow doesn t make a sum...
  • stage : n 1 講臺;舞臺;戲院,劇場;〈the stage〉戲劇,戲劇藝術;戲劇文學;〈the stage〉戲劇業;劇壇。2 ...
  • design : vt 1 計劃,企圖,立意要…。2 指定,預定;留給,留著。3 設計,草擬,擬定,籌劃;起草,畫草圖,打(...
  1. The main content of my thesis is making use of objectarx 2000 to study and exploit the cad of kitchens furniture, and my thesis provides the virtual situation in which designed product can be rendered, and by the animated show and virtual integration, all the problems which probably appear in the processes of design, product and sell could be solved at the stage of design, and the integral effect might be seen at the stage of design. in combination with the ideas of producers and clients, the product by optimal design might be one - off success

    本論文主要介紹如何運用objectarx2000對廚房傢具cad系統進行研究與開發,並且提供了設計產品進行渲染的虛擬環境,通過動畫展示和虛擬集成,將設計、生產和銷售過程中可能出現的問題都解決在設計階段,讓產品在設計階段就可以看到最終的整體效果,在結合生產者和消費者的信息的同時,通過設計的優化達到產品的一次性成功。
  2. This paper mainly discussed the optimization design of two - stage star - type gear transmission system. it covered the two sides : one - stage gear transmission and two - stage gear transmission. on the basis of their analysis and research, the mathematic models are created which include the objective functions of minimum volume and minimum center distance, the constraints of contact strength, bend strength and scuffing strength

    本文主要研究了航空發動機星型齒輪傳動系統的優化設計,對單級齒輪傳動和兩級星型傳動都進行了深入的分析和探討,分別以系統體積最小和中心距最小為目標函數,以齒輪的接觸強度、彎曲強度、膠合強度等為約束條件,建立了完整的數學模型。
  3. During the second stage of optimum design, a suitable ? omputation optimization, a suitable calculation method has to be selected at first and detail structures of one support scheme are optimized to formulate the optimum of engineering cost

    M值的選取,應注意適合於其相對應的支護結構位移的大小,而後者則取決于具體深基坑工程受周邊環境制約的程度。
  4. In the design, the mechanism of distributed power sources is applied to the power module in stage one, providing a highly reliable power supplying solution to board, which implements hot swap, slow power supply and automatically cutting off etc. thus to improve the sta bility of the power system

    其中,在階段一平臺的電源模塊設計中引入分散供電機制,設計了一種高可靠的板級電源解決方案,該方案能夠完成熱插拔、緩上電以及自斷電管理等功能,以提高電源系統的穩定性。
  5. By magnetic field analysis for the stage, three formulas reached : one is magnetic road magnetic force calculational formula of magnetic levitation system that except flux leakage, the second is magnetic driving force calculational formula for open magnetic road dc linear motor, the third is magnetic flux density calculational formula for dc linear motor. these formulas make reference for design, analysis and control

    本文對磁懸浮定位平臺進行了電磁場分析,推導出磁懸浮系統不計漏磁的簡單磁路、磁力計算公式和原理樣機所採用的開磁路直流直線電機推力及磁通密度計算公式,為設計、分析及控制提供參考。
  6. This overseas talent is responsible for every stage from ic design through to production ; they are responsible for helping to cultivate home - grown talent, and for selling the companys products. so far, te hsin has already recruited three experts from overseas ; between them, the three have a great deal of experience, and te hsin is using them to spearhead the development of its operations. dr. lu is one of the people that te hsin persuaded to return, and he has been responsible for the development of te hsins r d efforts

    公司成功的關鍵,一是留住高科技人才以及產品定位,產品定位可以幫助成長,也可吸引優秀工程師進來,例如定位在mcu其次是提供合適之成長環境,也就是留住人才第三是通路, ic半導體上中下游供應鏈關系,盛群和上游下游均有緊密的連結關系,且盛群在通路上也進行一些策略聯盟的投資,對重要的通路商會投資約10 % 20 % 。
  7. Directing against state of affairs at present, such as margin of type - selection parameters being selected comparatively large during design stage of air fans for boilers in thermal power plants, the opening degree of air fans in operation being often smaller ( for adjustment of inlet regulator ) or operation at lower revolution speed ( for speed - regulating operation mode ), and efficiency of air fans being lower etc., factors and corresponding measures having to pay attention in margin selection of air fan ' s parameters have been put forward through analysing practical example of retrofitting forced draft fans in one power plant, playing certain positive role for energy - saving and benefit - increasing in power plants

    摘要針對目前火力發電廠鍋爐風機在設計選型時參數裕量選取較大,運行時風門開度較小(對入口調節器調節)或低轉速運行(調速運行方式) ,風機效率較低的狀況,通過對某電廠送風機改造實例的分析,提出了在風機參數選擇中的裕量選取需要注意的因素及相關對策,對電廠的節能增效有一定的積極作用。
  8. Deducing the transfer function of the system, one controller is constructed and it has the wide frequencies isolation performance and zero force transfer rate. the active vibration isolation simulation is made and the results show that the two - stage isolation mounting with the controller constructed using the method mentioned in this paper has perfect isolation property and this provide new way for controller design. 4

    通過對雙層隔振振動主動控制系統模型的力傳遞函數的深入研究,構造了一種具有寬帶隔振性能的理論上具有零力傳遞率的控制器,並進行了數字模擬研究,取得了理想的模擬效果,為振動主動控制控制器的設計提供了新的思路。
  9. Eco - design is one of the best ways for " ecological management ". eco - design for cable products is only at the embryonic stage in china. the government in china has issued relevant regulations to forbid use of non - environmental cable for large and middle scale buildings or public sites, which urge us to further study eco - design

    生態設計是從源頭對產品進行「生態治理」的最為有效的途徑和方法之一,而電線電纜產品生態設計在國內剛剛起步,政府部門已頒布有關規定,在大中型建築或公共場所禁止使用非環保型電纜,這更加要求加快對電線電纜產品的生態設計研究。
  10. Local buckling capacity of steel composite beam subjected to combined bending, shear and patch loading is one of key problem in steel structures design. the computational formula for local stability of web was based on the assumption of infinite - elastic perfect plates in the steel structures design code ( gbj17 - 88 ). but in the revised code ( gb50017 - 2003 ), this formula was made big change with reference to british code ( bs5950, partl ) and australian code ( as4100 ), the related research result of our country was included as well. in the modified formula, influence of early geometric imperfection and elastic - plastic buckling stage were considered, which is compatible with both actual circumstance of engineering and the strength formula of beams under bending stresses ( considering partial plasticity of the section ). in this paper, the preceding problem is deeply analyzed and studied, considering the effects of various geometric parameters and stress combinations on buckling critical stress of web, the revised local buckling correlative formula for transverse and longituded stiffened web panels under combined stresses is analyzed and verified by finite element method

    組合鋼梁腹板在彎、剪及局壓復合應力作用下的局部屈曲承載能力是鋼結構設計中需考慮的問題,新的《鋼結構設計規范》 ( gb50017 ? 2003 )對此部分內容作了較大改動,原規范中關于腹板局部穩定的計算公式是基於無限彈性的完善板假定;新的規范則參考了英國規范( bs5950 part1 )及澳大利亞規范( as4100 )並結合我國相關研究成果,考慮了屈曲進入彈塑性階段以及初始幾何缺陷的影響。這不僅與工程實際情況相符,而且也與鋼梁在彎曲應力作用下允許截面部分進入塑性的計算公式相協調。
  11. Our company is one for your business to be held fashion shows, press conferences, theatrical show, the forum meeting, the meeting, promotions, roadshows and other public relations activities to provide stage design, lighting / audio / video equipment rental, event planners and other professional services enterprises

    我公司是一家為貴企業所舉行的時裝表演、新聞發布會、文藝晚會、論壇會議、年會、促銷路演等公關活動,提供舞臺設計、燈光/音響/視頻器材租賃、活動策劃等專業服務的企業。
  12. Long - span architectures represent one of the tendencies of the development of architectures nowadays. in design and creation of architectures fields, the structural application will meet many problems, and how to make full use of the structural mechanics characteristic and the construction system, and how to utilize reasonable construction form to mold the space appearance, and how to create out characteristic building in ages to really take the building design into a brand - new stage, will be a problem that the architects face and consider

    大跨度建築代表了當今建築類型發展的一大趨勢,在大跨度建築的設計與創作中,結構的應用會遇到諸多問題,如何充分利用和發揮結構體系的力學特徵,以合理的結構形式來塑造空間形態,並創造出具有時代特色的建築,以真正把建築設計帶入一個嶄新階段,將是建築師共同面對和思考的問題。
  13. Once the date of celebration was finalized, only one week remained for preparation. many fellow practitioners from different regions and possessing various talents or specialties soon came to help. since the show was scheduled to be held outdoors, many things needed to be done, including stage design, installation, decorating and lighting, setting up audio and video equipment, rehearsal, advertising, et cetera

    雖然整個活動的籌備時間非常緊迫,只有一個星期,活動場地又在戶外,但活動一經確定后,來自福爾摩沙各地,具有各項專長的同修即陸續加入工作,包括舞臺燈光音響與錄影器材的設計搭建布置,才藝表演與天衣秀人員的演練整合及活動的廣告宣傳等。
  14. Vehicle being over - load is one of main factor that result in the early stage damage of road in china, the research on it is not a few, but the accurate definition of heavy - load standard that guides pavement design is few

    車輛超載是導致我國公路早期破壞的主要因素之一,國內對此研究不少,但從路面設計角度給出重載標準的準確定義卻不多。
  15. A solid five - story structure, the main body of the building is built mostly of steel and concrete and partly of bricks and stones and shapes into a chinese japanese character " sun " japan " in chinese japanese means " root of sun ", with one courtyard each on the two sides. this solid building is well organized in structure, symmetric in shape, and distinctive in design. during the final stage of world war ii, bombardments seriously damaged the building

    整個總統府結構是一個日字型,屬五層樓建築物,樓身大多為鋼筋混凝土結構,部分混用磚石,總樓高約60公尺,樓面與樓面距離達9公尺,兩邊各有一個天井,辦公室圍繞天井四周而建,整體結構十分堅實,外圍以紅磚與灰泥搭配精緻簡潔的雕飾,充分塑造出典雅莊嚴的氣勢。
  16. After a lot of survey and careful design work, a one - dimensional test system with multi - function such as air stage and fuel reburning is built up

    本文經過大量的調研和仔細的設計、完善,建成了具有空氣分級、燃料再燃等多種用途的一維熱態試驗系統。
分享友人