open drain system 中文意思是什麼
open drain system
解釋
明溝系統-
So ansys is applied here to calculate the response of ground under moving loads in light railway system. at the locations with the big vibration, two measures for vibration - diminishing ? wave impeding block and open drain for isolating vibration are constructed, and the effective of vibration - diminishing is analyzed
因此在計算輕軌列車荷載作用下地基土的響應時,本文運用ansys軟體進行模擬,在振動較大的地方採用設置阻波區( wib , waveimpedingblock )和隔振溝兩種減振措施,同時對減振效果進行分析比較,得到了較為理想的結果。
分享友人