overburden structure 中文意思是什麼

overburden structure 解釋
上覆巖層結構
  • overburden : vt 裝載過多,使負擔過度,使過勞;壓垂。 trees overburdened with fruit 果子結得過多的樹。n 1 過重...
  • structure : n. 1. 構造,結構;組織;石理,石紋。2. 建造物。3. 【化學】化學結構。4. 【心理學】(直接經驗中顯現的)結構性,整體性;整體結構。adj. -d ,-less adj.
  1. Through analyzing all kinds of construction methods of building metro station under shield driven method in many countries, this paper studies the construction technique ( method ) of building metro station under shield driven method, taking in guangzhou no. 3 metro line, and linhe xilu station as the actual object. according to station class, function and topography and geology, the station schemes of twin - bore tunnel ( island ), firstly, three parallel tunnels ( island ), tri - bore tunnel ( island or side ) and four parallel tunnels ( island or side ) are proposed. secondly, the shape and main parameters of station structure on two schemes are analyzed with load - structure mode, for different overburden depth of tunnel and lining thickness, etc. thirdly, the construction process is simulated in 2d fem.,

    根據建站的規模、使用功能及站位地形地質條件,提出了兩連拱結構島式站臺車站、三條平行隧道島式站臺車站、三連拱結構島式和側式站臺車站以及四條平行隧道島式和側式站臺車站方案;採用荷載?結構模式,對四種方案的主體結構的形式和重要參數進行分析研究,分不同的埋深、襯砌結構厚度和拱形結構的拱跨比進行了多組數值計算;採用平面有限元方法對四種車站結構的開挖施作過程進行了模擬分析。
  2. Considering the above reason, this paper, by the action - reaction model in the design theory of underground structure, and by fem, establishes an analysis frame based on the characteristics of the cavern - pile method. the influences of tunnel span, height, overburden depth, and excavation sequence on the cavern - pile method are discussed by a careful interpretation of the modeling result. in addition, a comparison of surface settlement and engineering quantity of the cavern - pile method with those of the binocular excavation method, bench cut method and cd method are made in the paper

    本研究主要是依據目前地下結構設計及計算理論中的地層結構法,以有限單元法為計算手段,針對淺埋暗挖洞樁法的自身特點確定了模擬分析方案,並通過計算結果的處理和分析指出了洞室跨度、高度、埋深、施工工序等因素對淺埋暗挖洞樁法的影響規律。
  3. Elementary analysis on breaking feature of overburden rock during mining under special nappe structure

    特殊推覆體下開采覆巖破壞特性淺析
  4. Through shaking table test, in this paper the rule of the underground structure reaction to earthquake is summarized and the distortion of the structure and the mechanism of wreck are analyzed, especially the effect of overburden and the vertical earthquake to underground structure are studied

    摘要文章通過振動臺試驗,總結了地下結構地震反應規律,分析地下結構的變形機制,並重點分析上覆土層和豎向荷載對地下結構動力性態的影響。
  5. In order to systematically summarize research outcome of mining under buildings and further accelerate its development, by consulting a large number of literature and making synthetic analysis, this paper presents an overall summary of the latest research outcome of mining under buildings from the following three aspects : protecting measures of mining under ground, of buildings on the surface, and grouting of overburden, and analyzes the current research state of coordinating action of ground, foundation and structure of buildings in mining area

    摘要為了系統歸納建築物下採煤的研究成果、進一步促進建築物下採煤學科的發展,採用查閱大量文獻資料和綜合分析的方法,對目前建築物下採煤在井下采礦措施、地面建築物保護措施、覆巖離層注漿等三個方面的研究發展現狀進行了全面的總結,並對采動區建築物地基、基礎與結構協同問題在理論研究和現場實測方面的研究現狀進行了分析。
  6. The site overburden layer with the structure of different foundation soil strata and different rigidity of soil layer transforms structure of frequency of ground micro - tremor with different degree

    土層結構不同、土層剛度(值)不同,覆蓋土層對地脈動源頻率結構的改造程度也不一。
  7. Fourth, there exists some corresponding relationships between spectral structure characters of ground micro - tremor and shear wave velocity of site soil layers. the outcomes of these two kinds of tests can be conferred each other. fifth, the correlations between predominant period of ground micro - tremor and thickness, and value of shear wave velocity of overburden layer are established

    第五,建立場地土覆蓋層厚度、剪切波速與地脈動卓越周期之間的相關關系,有助於通過勘測場地土覆蓋層厚度的結果估算場地地脈動的卓越周期,以及揭示場地土剪切波速與地脈動卓越周期的內在相關規律。
分享友人