paths of water 中文意思是什麼

paths of water 解釋
水徑
  • paths : 共創成長路
  • of : OF =Old French 古法語。
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  1. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高拱壩壩身泄洪孔口、泄流過程以及壩下水墊塘的布置優化問題進行了討論。主要內容和成果有1
  2. During the second phase of the east lake lakeshore scenery construction project, an approach was taken to establish a public domain including a cha - gang lose - water " observation platform, bathing beach and parking lots. the design and analysis of all these elements have been addressed in the following article as well as other components such as roadway alignment, installation, water bank stabilization, planting, street lighting, sculptures and accessible paths for disables. the proposed landscape will ensure a systematic visual system with enhanced cultural, artistic, and unique characteristics, and properly arranged facilities along the shoreline

    本文通過東湖環湖景觀建設綜合整治二期工程中的茶港親水平臺、沙灘浴場及停車場的道路和景觀設計,對東湖環湖的路面、鋪裝、駁岸、綠化、亮化、燈飾、小品、殘疾人通道等多個方面進行了分析,以期建立一個統一有序的視覺體系,增強東湖環湖旅遊線的文化性、藝術性和獨特性,合理安排布置配套設施,使之成為一條步移景異,集秀、翠、幽、雅為一體的湖畔風光游覽路。
  3. According to statistics parameters of the typical clouds over xi ' an region and cloud data obtained from the global distribution of cloud cover under the auspices of world meteorological organization, for xi ' an region typical cloud, the parameters of khragian - mazin cloud drop size distribution are obtained. based on xi ' an cloud water content profile, on earth - space paths, attenuation due to cloud are calculated by means of the k - m distribution. it is shown that the attenuation induced by cloud are taken into account at ka - at elevation angle smaller than 30 and v - band paths

    第三,根據西安地區氣象觀測數據,討論了西安典型雲的宏觀和微觀物理特性;根據西安典型雲的觀測結果和世界氣象組織提供的數據,得到西安典型雲的k - m雲滴譜參數;並根據西安地區雲的液水含量,計算了地一空路徑上雲的衰減,結果表明,在v波段和仰角小於30度的ka波段路徑,雲的衰減需加以考慮。
  4. A garden without paths is nothing but milk and water, because of no surprises

    沒有小徑的花園是平淡的,少了點柳暗花明的意外喜悅。
  5. Returned to the edge of the precipice and see myself have a cave along the winding down the stairs, enter the cave, in the water beside the paths, pick up a three charge

    退回,來到懸崖邊,看到崖底有一山洞,沿著蜿蜒的石階往下,進入山洞,在棧道旁的水裡拾到一個三分管。
  6. The safety factors of the most likely sliding paths are 4. 15 and 3. 05 for 9b and 4b respectively at normal water storage level

    另外,壩踵以下14m深度范圍向下游階梯式滑出也是安全系數較小的滑移路徑,但不是控制路徑。
  7. A properly designed watts pvs valve station provides redundant flow paths, a continuous supply of adequate water, testing and servicing of an individual valve without supply interruption, and long service life

    正確設計的美國瓦茨pvs閥門站提供重復的流路,能夠連續提供適量的水,能夠在不中斷水供應的情況下對某個閥門進行檢測和維修,使用壽命更長。
  8. According to the geological conditions of baise project, erosive bands and joint fissures, f6 fault and grout curtain are fully simulated to establish 3d numerical model of the dam and its foundation. 3d non - linear fem is used to analyze the stress and strain and to appraise the operation state of both the dam and it ' s foundation under different operation conditions. by overloading the upstream water level and reducing rock strength parameter, the dam foundation ' s degradation process is simulated and the damage pattern and paths are determined, and finally the safety factor is determined

    2 、根據百色的地形地質條件,充分模擬了蝕變帶、節理裂隙、 f6斷層、灌漿帷幕等,較為真實地建立了壩體與地基相互作用的整體三維數值模型;採用有限元法對壩體及壩基在不同工況下的應力應變狀態開展分析,評價各工況下壩基的運行狀態;而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑,最終確定壩基超載安全系數和綜合安全系數。
  9. Talking about the effective paths of solving the crisis of fresh - water resources

    淺談解決淡水資源危機的有效途徑
  10. The people in that area were so poor that they did not have the money to dig wells or build irrigation canals. all they could do was pray to god for help. from the river to their home was a long distance along rugged paths that were exhausting enough to travel empty - handed, let alone while carrying a 20 - liter - bucket of water

    由於這里的人民非常窮,沒有錢挖井或引水灌溉,一切只能靠老天爺人們喝水要走到河流去扛水,崎嶇的小路,空手走都很費力了,更何況還要扛著一個二十公升的水桶。
  11. Firstly, the displacement, stress, strain fields and the working state of dam body and foundation are evaluated by fem. by overloading the upstream water level and reducing rock strength parameters, the failure process of dam foundation is simulated and the failure mode and paths are determined. the results show that when overload method is used, damaged area develops from up - stream to down stream with failure front stays near the interface between dam body and bedrock

    首先採用非線性有限單元法對壩體及壩基在不同荷載工況下的變位、應力應變狀態展開分析,評價各工況下壩基的運行狀態,而後採用超載法和綜合法對大壩穩定性進行分析,模擬壩基的漸進性破壞過程,追蹤巖體破壞狀態的發展演變過程,從而得到壩基在超載和強度下降過程中的破壞模式和破壞發展路徑。
  12. First, considering the change of stress conditions in excavation slopes by means of triaxial equipment, the triaxial tests of three kinds of stress paths of q3 and q2 loess, including lateral unloading, keeping mean normal stress changeless and conventional axial loading, is carried out under different water content and consolidation stress conditions

    本文就黃土挖方高邊坡工程問題,首先在三軸儀上考慮邊坡開挖過程應力條件的變化,進行了q _ 3 、 q _ 2黃土不同含水量條件下圍壓卸荷、等p剪切及軸向加載三種應力路徑的試驗。
  13. The controlling box collects the temperature and the humidity of the experiment box and the temperature of the water tank with platinum resistance transducer that has three paths. then they are sent to the microprocessor 89 c55 to dispose by a / d and sent to the d / a to be an 4 ~ 20 ma output of simulant value. at the same time, the outputs of six paths switch quantity drive respectively the relaies of heightening temperature reducing temperature alarm and so on

    「恆溫、恆濕控制箱」由三路鉑電阻傳感器採集試驗箱的溫度、濕度和水箱的溫度,經12位a d送至微處理器89c55處理,送至d a輸出4 20ma模擬量,同時,輸出六路開關量分別驅動加濕1 、加濕2 、升溫、降溫、除濕、報警等繼電裝置。
分享友人