period planning 中文意思是什麼

period planning 解釋
時間計劃
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  • planning : n. 計劃,規劃。 an overall planning 全面規劃。
  1. Article 9 physicians shall, after pre - marital medical examination, give medical advice to those who are in the infective period of any target infectious disease or who are in the morbid period of any re - levant mental disease ; both the male and female planning to be married shall postpone their marriage for the time being

    第九條經婚前醫學檢查,對患指定傳染病在傳染期內或者有關精神病在發病期內的,醫師應當提出醫學意見;準備結婚的男女雙方應當暫緩結婚。
  2. By studying, we find many large egg chicken breeding farms developed in the period of planned economy. they neither had advanced marketing concepts nor systematic marketing planning

    究其原因,許多規模化的蛋雞養殖企業是計劃經濟時期發展起來的,經歷了計劃經濟體制下的統購統銷,營銷觀念滯后,缺乏系統的營銷戰略規劃。
  3. As an effective traffic of light rail transit, it has been widely adopted by many large cities over the vorld, and a few cities of china are planning or building the light rail transit in our country, which has characteristic of saving investment, short construction period, high flexibility and low life - cycle costs for the light rail transit which can be constructed underground or high frame in crucial area, which can be suitable for the requirements of large capacity, high speed, safety and punctuality

    輕軌交通便是其中一種有效的交通方式,近幾年來在世界上各國大城市得到迅速發展,我國也有十幾座城市計劃或正在建設輕軌交通。其具有投資少、建設周期短、靈活性強、運行成本低的特點,可在關鍵地段和市中心區採用高架或地下鐵道結構,使其能運量大、速度快、安全、準點。
  4. Abstract : this paper expatiated a masterpiece of landscape planning - from boston ' s emerald necklace to boston ' s metropolitan park system , to greenway planning for new england, aiming to introduce some advanced ideas abroad such as parkway 、 open space 、 greenway , and make people realize the long period of planning

    本文詳細介紹波士頓的「翡翠項圈」和波士頓都會的開放空間系統,以及剛剛完成新英格蘭地區的綠色通道規劃,旨在介紹一些國外先進的景觀規劃思想如公園道、開放空間、綠色通道等,同時讓大家認識到規劃是一個長期堅持不懈的過程。
  5. Their production plan levels and the characteristics are described, the improved algorithms for production order and mrp that are suitable for the demands of the production in fuda co. are developed. chapter four is focused on production scheduling. the production period planning and capacity planning in production are discussed respectively, and the method how to apply opt in production scheduling to optimize the control of production process is presented

    第四章是混合型生產作業計劃調度控制,首先討論了生產作業計劃調度在生產管理系統中的作用,進而結合富達公司的實際生產情況對生產周期的調度、設備能力的調度分別進行了討論,最後討論如何在生產過程中運用opt思想對生產過程中的「瓶頸」工序進行控制,從而對整個生產過程的關鍵工序和非關鍵工序生產作業計劃調度進行優化。
  6. As far as china is concerned, it is now experiencing the transition from the planning economy to a socialist market economy. china ' s institutional disequilibrium in this time period has its own characteristics in extents, forms, effects and causes. in china, the high political and ideological cost of institutional innovation is one of the most important causes of institutional disequilibrium

    中國從計劃經濟體制向市場經濟體制轉軌的這一過渡時期的制度非均衡具有以下幾個特點:制度非均衡普遍存在、制度供給過剩嚴重、制度創新的政治和意識形態成本高、收入分配效應大、非正式制度與正式制度沖突大等。
  7. The maintenance and repair work of cultural relics must be done well in real earnest during the " ninth five - year plan ” period with overall planning, concentration of funds, guarantee for major sites and efficiency

    要統籌規劃、集中資金、保證重點、講究效益,切實抓好「九五」計劃期間的文物維修工作。
  8. Study on the character and theotetic system of the national land planning system in new period in china

    關于新一輪國土規劃性質及其理論體系建設的思考
  9. This paper ’ s constructive land forecast is based on land planning and stat forecast. on the basic of analyse of constructive land actuality and the change mechanism in toksun county, apply four kind of forecast models to analyse the result. choose gm ( 1, 1 ) model and regression model according with the constructive land actuality and the change mechanism in toksun county. and combine the “ 十一 五 ” planning of government and the arrangement of emphases industry item to forecast the demand of constructive land and change current of land use structure in planning period ( 2010 and 2020 ). it adopt reasoning means of acceptability, according to constructive land scale, considering economy rationality 、 advancement and applicability of technic feasibility of constructive condition and sustainability of zoology environment, to analyse the feasibility of constructive land scale. at the last, put forward advice of the constructive land supply

    在托克遜縣建設用地現狀和變化機制分析的基礎上,採用4種預測模型進行對比分析,選取符合托克遜縣建設用地變化機理的模型: gm ( 1 , 1 )模型和回歸預測,綜合這兩種預測方法,並結合政府「十一五」規劃以及「十一五」期間重點工業項目安排情況,對規劃期( 2010年、 2020年)各類建設用地需求數量和土地利用結構的變化趨勢進行預測。採用合意度論證方法,綜合考慮建設用地預測規模的經濟合理性、技術的先進性、適用性、建設條件的可能性以及生態環境的可持續性,對建設用地規模進行可行性論證,最後提出建設用地合理供給對策。
  10. The characteristics of the production are with the high dissociation of parts, complexity of structures, long period of manufacturing, and high cost. in addition the manufacture needs high demands to the resource planning, ability in equilibrium, control of cost, consignment on time and so on

    巴威公司的鍋爐產品是根據客戶要求製造的,其部件生產的離散性強、結構復雜、製造周期長,成本高,對資源計劃、能力均衡、成本控制、按期交貨等提出了很高的要求。
  11. The main points of hlsip quality control includes : during the design stage, it is necessary to control the scheme comparison and optimum design, esp. the waterwork, electromechanical device and irrigation region planning, to improve the design quality and pay attention to control the long - term benefits of design results ; during construction period, the supervisor should help proprietor choose construction contractor, sign the construction contract, supervise the manufacture of equipment and strictly execute the quality control procedure to subject the construction to controlled mode ; in addition, the contractors must improve their quality self - control, maintain the notion " quality first " and insist the full process, multiway, and multi system control of construction quality

    高揚程梯級提水灌溉工程質量控制的重點包括:設計階段控制好方案對比、設計優化,特別是水工建築、機電安裝、灌區規劃等多專業多目標的確定和協調,提高設計質量和深度,注重控制設計成果的長期效益;施工階段協助業主選擇好施工承包商,制定出嚴謹、完備的施工合同,搞好設備監造,嚴格執行質量控製程序,使工程施工時時處于受控狀態;同時要提高承包商的質量自控能力,堅持施工質量的全過程、多方法、多體系控制。
  12. During the period of shift from planning economy to market economy, china began the variance of industrial regulation. first, in 1980 " s there were some reforms of industrial regulation in frustrations such as telecom, electrics, transports industries, aiming at separating government and enterprises, hastening competitions, promoting efficiency. reforms is the original impetus of the variance of industrial regulation

    在由計劃經濟體制全面向市場經濟體制轉軌過程中,中國開始了產業規制變遷歷程,其標志是20世紀80年代初,以「政企分離,打破壟斷,促進競爭,提高效率」為目的,在電信、電力、交通運輸業等基礎設施行業進行的產業規制改革,市場化改革是中國產業規制變遷的初始原動力。
  13. Analysis and study are made on batch optimizing production, main production planning lay - out, important resource planning coordination method and calculation of safety in - advance period with mixed use of mrpii / jit

    採用mrp / jit混用思想,對生產批量的優化方法、主生產計劃編排原則、關鍵資源計劃協調方法、安全提前期的計算等進行了分析研究。
  14. Abstract : this paper studies and discusses new tasks in health legislation at the beginning of the 21th century. with entering the period of the knowledge economy and information society, health service development, strategic planning of the medical science and the realization of the target of health interest for all should have a legal norm. the author puts forward the guideline and fundamental principle of the health legislation as well as legislative characteristic at the beginning of the new century and gives a conception of the health legislation framework

    文摘:研究探討21世紀初衛生立法面臨的新任務,進入知識經濟和信息社會時期,衛生事業發展、醫學科學戰略規劃,人人享有健康權益目標實現,應有法律規范,並提出新世紀初衛生立法指導思想、基本原則及立法特點,提供了一份衛生立法框架構思。
  15. On the fiscal and tax development during the period of the quot; eleventh five - year planning quot

    時期我國財政稅收發展的幾點看法
  16. This paper discusses on the problem of the paid service of the power - supply enterprise, analyzed on the malpractices of the free service, a kind of thinking mode formed under the planning economic system, and points out that the paid service is an objective externalization of the trade purpose in the new period, and promoting the paid service is an evitable trend of the development of the power market

    論述了供電企業有償服務的問題,分析了計劃經濟體制下形成的無償服務的思維模式帶來的弊端,指出有償服務是新時期行業宗旨的客觀體現,推行有償服務是電力市場化發展的必然。
  17. 1 a fixed period of calendar time, generally between 1 and 6 weeks, for scheduling tasks and planning activities

    迭代( 1 )日歷時間的固定區段,通常為1到6周的調度任務和計劃活動。
  18. Female employee ' s maternity expenses, which are in accord with the national family planning policy, including check expenses during the gestation period, laboring expenses, and the abortion expenses for the married

    女性員工符合國家計劃生育法規的孕期檢查費、產婦分娩的費用、已婚者由於人工流產的費用。
  19. If you ' re going for an extended period of time or if you ' re planning to drink water you find along the way, bring along a filtering system or iodine water purification tablets

    如果你準備出行較長時間或者你打算在出行途中找到你要飲用的水,請帶上過濾系統或是水質凈化用碘片。
  20. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底水庫運用后水沙變化這一主要矛盾,通過分析研究以往典型時期的水沙特點和河道演變特點,收集分析河床邊界條件變化資料,小浪底水庫運用后水沙資料變化,結合現有河道整治工程建設情況,總結前人的研究成果,重點研究三門峽水庫運用後下遊河道河勢變化的規律和特點,探索小浪底水庫運用後下遊河勢變化情況,分析預測游蕩性河道鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河道整治工程建設的規劃和工程安排提供決策參考和依據。
分享友人