period project 中文意思是什麼

period project 解釋
期間計劃
  • period : n 1 時代;期;時期;期間;階段。2 〈the period〉現代,當代。3 周期;【地質學;地理學】紀。4 終結...
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  1. Canada s contribution to the project is estimated at cnd 19. 7 million approximately 120 million rmb over a period of 5 years and this will be supported by an equivalent counterpart budget from the government of china

    加方提供的項目經費為1 , 970萬加元約1 . 2億人民幣,執行期為5年,中國政府將提供等量的項目配套資金。
  2. Canadas contribution to the project is estimated at cnd 20, 000, 000 approximately 130 million rmb over a period of 5 years and this will be supported by an equivalent counterpart budget from the government of china

    項目實施期為5年,加拿大政府在本項目中將提供2000萬加元相當於1 . 3億人民幣的援助,中國政府也將提供相同額度的支持作為配套。
  3. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及水工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  4. Based on the national " ninth " five years " key project - study on the equipment and technique of raising and transplanting seedlings as the kind of factory, combining the no - tillage specialty which can shorten the working period and reduce the intension of dust devil, the key parts of corn no - tillage transplanter has been studied which can improve both the transplanting speed and reliability, reduce the labour intension of operator, further more, the method of automatic controlling whole working course has been applied by using single - chip microcomputer, the bedrock is made for transforming this technique into social productivity

    本文在原來國家科技部「九五」攻關項目「工廠化育苗、移栽工藝及設備研究」的基礎上,結合免耕工藝不僅縮短作業時間,而且可以對防止沙塵暴發生有利的特點,對可以提高栽植速度和工作可靠性、降低操作人員勞動強度的玉米免耕栽植機的關鍵部件進行了詳細的研究,進一步採用單片機控制技術對其工作過程實現了自動化控制,為該技術盡快轉化為社會生產力打好基礎。
  5. Because the investment scale of bot is large and it is the project of infrastructure that concerns the economic lifeline of the host country so it will greatly be affected by the environment of laws of the government of the host country. and on the other hand it will face many changeable factors possibly occurs with the long period construction, great the benefits and multitudinous participants and also with the complex relationship of laws

    因為bot項目投資規模大,且bot項目為基礎設施工程,關系東道國的經濟命脈,因此項目受東道國政府法律環境等影響大;另外bot項目工期長,工程利益參與人眾多,法律關系復雜,因此面臨的可變因素很多。
  6. The second passage of the article is the essential section, composed with macrocosm design, organization implement and feedback collection, designing and outlining the systemic model of certificate of leadership qualification, the whole assessment system pays attention not only to the macrocosm structure, proper and scientific frame, extensive applicability, but also to concrete steps, exiguous and intuitionistic programming, simple and convenient operation. the macrocosm design exerts modern examination theory and systemic project method to describe thoroughly the basic principles, applicable range, certificate categories, the setting of organization system, assessment target of leadership qualification, the choice of content and technology ; organization implement gives exiguous and concrete designs on the period of qualification examination, choosing time, confirmation of the certificate scale and qualification censor, written examination, interview, pub

    總體設計中運用現代考試理論和系統工程的方法,適應形勢,結合實際,對認證制的基本原則、適用范圍(正副廳、正副處、正副科等三等六級) 、認證的分類、組織體系的設置、任職資格認證評價目標、內容和技術的選擇進行了宏觀全面地闡述;組織實施中對任職資格考試周期、時間的選擇、認證規模的確定以及資格審查、筆試、面試、考察、公示的操作等進行了微觀具體地設計;反饋迴流中對認證工作的檢驗和評估、任職資格的跟蹤動態管理和認證制保障機制的建立進行了詳細說明。
  7. Satsuki exhibition, satsuki gardening class and more events such as the edo traditional craft workshop ( including charged experience ) are scheduled during the festival period. visitors may enjoy tour around other gardens on the special stamp rally project where you can access by the toei subway oedo line. those on the list are hama - rikyu onshi gardens, koishikawa korakuen gardens and kiyosumi gardens

    除江戶傳統工藝角(有可交納成本費體驗的活動)以外,同時從舊芝離宮恩賜庭園開始通過都營大江戶線連接的濱離宮恩賜庭園、小石川后樂園、清澄庭園等景點處,還可蓋上不同地方的精美郵戳。
  8. The subject is based on the study forward position of water resources management of liaoning province, and use the developed tendency and succeeded experience of world water resources for reference, take theory of sustainable development as guiding ideologue, adopt systematic project, protection of ecosystem and environment and theory of economy forecast engage in composite analyze, dynamic evaluate and forecast analyze, forecast developed tendency of water resources supplement and demand of liaoning province, put forward water resources rational disposition, economize on water, the prevention and control of water pollution and strength water resources protection etc. measures, supply decisional foundation for fight drought, economize on water and water resources optimized disposition, is water resources strategic research forward sustainable development, is a part of water conservancy developed program of liaoning province in the 15 period, and it has important significance to accomplish the sustainable development of economy and environment of liaoning province

    本課題立足於遼寧省水資源管理研究前沿,借鑒了國內外水資源發展趨勢和成功經驗,以可持續發展的理論為指導,運用系統工程、生態環境保護理論和經濟預測理論進行綜合分析、動態評價,進而預測遼寧省水資源供需發展態勢,提出了遼寧省水資源合理配置、節約用水、水污染防治和增強水資源保護等措施,為遼寧省抗旱、節水和水資源優化配置提供決策依據。本文是面向可持續發展的遼寧省水資源戰略研究,是「十五」期間遼寧水利發展規劃整體布局的一部分,對實現遼寧省經濟、資源可持續發展具有重要意義。
  9. The other research purpose is to discover characteristic information and reliable methods of reflecting spinal cord damage. due to typical damage indicators, amplitude and latent period, have bugs such as limited information and weak stabilities, this project recommends applying time - frequency analysis to monitoring spinal cord function. through analysing and comparing typical signal with stft and cwt, it is proved indicators under time - frequency distribution can be better in reflecting signal changes, espcially the wavelet transformation

    針對目前ep監測中判定脊髓損傷的指標(波幅和潛伏期)存在信息量相對較小、穩定性較差的缺陷,本課題提出利用時頻分析技術對術中脊髓功能監護進行研究,通過短時傅立葉變換和小波變換分析和比較典型信號的時頻分佈,證明時頻特徵參數能更有效的提取信號的變化信息。
  10. Construction ministry " housing project quality guarantees method " made lowest guarantee to housing project the regulation of deadline : among them 1, foundation foundation project and project of main body construction, to design the reasonable use fixed number of year of this project that the file sets ; 2, the waterproof project, toilet that has waterproof demand, room mixes the building outside of metope prevent leakage, for 5 years ; 3, heat addition and supply cold system, for 2 heating period, offer cold period ; 4, electric cop, to catchment conduit, equipment installation is 2 years ; 5, decorate a project to be 2 years

    建設部《房屋建築工程質量保修辦法》對房屋建築工程作了最低保修期限的規定:其中1 、地基基礎工程和主體結構工程,為設計文件規定的該工程的合理使用年限; 2 、房屋防水工程、有防水要求的衛生間、房間和外墻面的防滲漏,為5年; 3 、供熱與供冷系統,為2個採暖期、供冷期; 4 、電氣管線、給排水管道、設備安裝為2年; 5 、裝修工程為2年。
  11. This movement demonstrated several obvious features : it was an enormous project and lasted for a lengthy period ; it involved a multitude of participants in the militarized administration, under the guidance of a military - like superintend - dance

    根治海河表現出明顯的特點:工程浩大、持續時間長、大兵團作戰、軍事化指揮機構、民工的軍事化管理等。
  12. The period of project construction is one year, it takes one year to produce with various quick frozen fruits of 10000tons, including frozen apricot of 8000tons, frozen musk melon of 1000tons ; fozen grape of 800tons ; frozen fig of 200tons, annual revenue is 88million yuan, recovery period of investment is 6 years

    建設期一年,達產期一年,建成后可生產各類鮮果速凍產品10000噸,包括速凍鮮杏8000噸;速凍甜瓜1000噸;速凍葡萄800噸;速凍無花果等小漿果200噸,年收入8800萬元,投資回報期6年。
  13. The organizer of the exhibition this term will invite more project undertakers, wood door makers in the secondary and third markets, and international professional audiences, continue to the enhance service quality to make the exhibition gear to international standards, carry out intensified promotion campaigns among effective audience organizations and expos, and further enhance the academic level and authority of activities held during the period of exhibition

    本屆展會主辦單位將著力于加大對工程商、木質門二、三級市場以及國際專業觀眾的邀請,繼續提高展覽會與國際化接軌的服務標準,以及加強對有效觀眾組織和展覽會宣傳,並進一步提高展會期間活動的學術水平和權威性。
  14. Project construction, as the owners did not agree to pay for the contract, or other owners of the obligations assumed by the reasons caused the increase in construction costs, extended construction period, project contractor compensation to the owners of losses ( cost or time limit ) of a written request, known as the engineering claims

    工程建設中,由於業主未按合同約定支付工程費用,或其他應由業主承擔的義務等原因而造成的增加工程施工費用、延長施工期限等,工程承包單位向業主提出賠償損失(費用或工期)的書面請求,稱為工程索賠。
  15. The circumstances of systematic dispose of aluminium oxide, existing problems and suggestions for improvement in the third period project have been analyzed

    摘要分析了青銅峽鋁業集團三期工程氧化鋁超濃相輸送系統配置情況,提出了存在的問題及改進建議。
  16. Ningxiang county long tianfan the industry limited company is located within the boundaries of the beautiful and rich hunan province ningxiang county, the first period project area approximately 28000 square meters, have the fixed asset 2800 ten thousand yuan, the staff 200 people, the year productivity 240 tons ; the second phased project completion year after next productivity will amount to 500 - 600 ton

    寧鄉縣龍田釩業有限公司位於美麗富饒的湖南省寧鄉縣境內,首期工程佔地面積約28000平方米,擁有固定資產2800餘萬元,職工200餘人,年生產能力240噸;二期工程竣工後年生產能力達500 - 600噸。
  17. The first - period project has been launched with the investment amounting to usd 12 million

    常州市博大精細化工有限公司,其前身為常州市博大化工有限公司。
  18. At our country, the article specializing in valuation research of startup period project hasn " t seen

    在我國,專門研究創立期風險投資評估的文章還沒有見到。
  19. Undoubtedly, for a limited - period project, discussion and review mean abundant cost of time and it is not easy to arrange in most cases, especially in case of work occurring synchronously

    無庸置疑,對於一個時段限制的項目,討論和評審意味著你要花費大量的時間,並且在某些情形下這不易於安排,特別是在工作同時變故的情況下。
  20. Utilizing information technology, combined advanced logistics management thought is an important way to realize enterprise " s logistics management effectively. this paper, based on the first period project of cad / cims in qingshan indus. ltd. corp., present the layout for the first period project of cad / cims in qingshan indus. ltd. corp.,

    本文以重慶市製造業信息化重大專項子項目「重慶青山工業有限責任公司cad / cims一期工程」為研究對象,從企業信息系統規劃的高度,提出了重慶青山工業公司cad / cims一期工程的總體規劃
分享友人