pert analysis 中文意思是什麼

pert analysis 解釋
項目評估與總結法分析
  • pert : 〈P(rogram) E(valuation and) R(eview) T(echnique)〉 程序計算檢查系統〈將一系列互相依賴的...
  • analysis : n. (pl. -ses )1. 分解,分析;【數學】解析。2. 梗概,要略。3. 〈美國〉用精神分析法治療(= psychoanalysis)。
  1. In an attempt to tackle the most common resource conflict problem of i - mes, a conflict resolution model that is based on multi - agent cooperation is proposed. from the perspective of conflict management full life circle, the problems of conflict checking, conflict analysis and conflict resolution are studied extensively. meanwhile a conflict analysis method based on program evaluation an review technique / critical path method ( pert / cpm ) is provided, which categorizes all kinds of resource conflict

    針對可集成製造執行系統最常見的資源沖突問題,提出了一種基於多agent合作的沖突消解模型,從沖突管理的全生命周期角度,詳細研究了沖突檢測、沖突分析、沖突消解等問題,提出了一種基於pert cpm的沖突分析方法,對各種資源沖突進行分類,並建立了相應的沖突消解策略及基於kqml的沖突消解規則。
  2. Basic project planning, critical path, critical chain, or pert analysis may mitigate such failings

    基本的項目計劃、關鍵路程、重要鏈子,和計劃評審技術分析也許會減低失敗的幾率。
  3. Use this view when performing a pert analysis on a task ' s duration or on your project ' s schedule

    當對任務工期或項目日程進行pert分析時可使用此視圖。
  4. Used in conjunction with microsoft project ' s other pert analysis features to evaluate the probable duration, start date, and finish date of a task

    與microsoftproject的pert分析功能聯合使用,可以估計某項任務的可能工期、開始日期和完成日期。
  5. Used in conjunction with microsoft project ' s other pert analysis features to evaluate the expected duration, start date, and finish date of a task

    與microsoftproject的pert分析功能聯合使用,可以估計某項任務的預期工期、開始日期和完成日期。
  6. Used in conjunction with microsoft project ' s other pert analysis features to evaluate the best - case duration, start date, and finish date of a task

    與microsoftproject的pert分析功能聯合使用,可以估計某項任務在最佳狀況下的工期、開始日期和完成日期。
  7. Used in conjunction with microsoft project ' s other pert analysis features to evaluate the worst - case duration, start date, and finish date of a task

    與microsoftproject的pert分析功能聯合使用,可以估計某項任務在最壞狀況下的工期、開始日期和完成日期。