pier arch 中文意思是什麼

pier arch 解釋
墩拱
  • pier : n. 1. 碼頭;防波堤。2. 橋腳,墩。3. 【建築】窗間壁,戶間壁,扶壁;柱,角柱。
  • arch : n 1 【建築】弓架結構;拱廊;拱門;弓形門;穹窿,拱洞,拱頂。2 弓形,半圓形。vi 1 【建築】作(成)...
  1. A finite element numerical model for arch dam - gravity pier - foundation system was established to evaluate the effect of high gravity piers on the stress, deformation and anti - sliding stability of sizhai arch dam, taking the following factors into account, such as the possible elastoplastic deformation of foundation rocks and the nonlinear interaction between the interfaces of gravity pier - dam foundation, the joint surfaces beneath the right bank, and the interfaces of arch dam - gravity pier

    摘要為評價高重力墩對四寨拱壩的應力變形和抗滑安全的影響,建立了拱壩重力墩地基系統的有限元數值模型,其中考慮重力墩基礎、右岸夾層和拱壩重力墩等交界面的非線性相互作用,以及基巖材料的彈塑性變形行為。
  2. In order to optimize the perpetuation tensioning tonnage of prestressed pier anchor wire of goupitan arch dam, first the scheme contrast method is adopted to define the perpetuation tensioning tonnage combination of the primary and secondary anchor wire, but the optimization result is that the pull - anchor coefficient is too big ; then the body form of the pier is optimized ; finally the anchor wire perpetuation tensioning tonnage is optimized by using ansys optimization design module based on parametric fem, the optimization result is acceptable and the pull - anchor coefficient is lowered down

    摘要為優化構皮灘拱壩中孔預應力閘墩錨索永存張拉噸位,首先採用方案優選的方法確定主次錨索永存張拉噸位組合,但優選結果拉錨系數偏大,再對閘墩體型進行優化,然後採用基於參數化有限元的ansys優化設計模塊對主次錨索永存張拉噸位進行優化,優化結果滿足應力控制要求,降低了拉錨系數。
  3. The main component of this article is study arch - dams stress distribution in difference earthquake and difference water level with finite element analysis. and the study compare the adversed stress distribution on the position whether existed opening hollow areas and pier or not

    在考慮了壩身開孔和閘墩的存在後,壩體應力場也將發生一定的變化,特別是在開孔及閘墩附近,與不開孔及無閘墩情況相比將會有顯著的不同。
  4. The result of the study included two aspect : one is the affection when hollow opened and pier on arch - dam with statics calculation, earthquake response spectrum analysis and analysis of time - history i. e step - by - step integration analysis

    本文完成的主要工作有兩個方面:一是通過靜力分析、反應譜分析和時程分析研究壩身開孔及閘墩對壩體整體動力反應的影響。
  5. This article is part of the study of national item which is important part of high arch - dam earthquake protection. in the result of studying the effect to earthquake, the article analysis dam - stress at diference earthquake wave, to procure design parameter on the gate & pier areas

    本課題是「九?五」國家重點科技公關項目中有關高拱壩抗震分析的組成部分,是在有關研究成果的基礎上,對已確定的壩型及其壩體及附屬物(閘墩、孔口)進行動力分析,確定有關設計參數,同時也是對以往研究成果的校核。
  6. The hydro - pressure over - loading method and the strength reduction method were applied to numerical simulation of gravity pier - arch dam system, and the integral stability of the system was evaluated based on the suggested index for safety evaluation of the gravity pier

    分別採用水壓超載法和折減強度參數法對重力墩拱壩系統進行數值模擬,並基於建議的重力墩安全評價指標對系統整體穩定性進行判定。
分享友人