pipe capacity 中文意思是什麼

pipe capacity 解釋
管道輸送能力
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • capacity : n 1 包容力,吸收力,收容力。2 容積,容量;【電學】電容,負載量。3 能力,才幹,本領;性能,機能。4...
  1. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  2. This paper analyzes the fire danger factors for torching system and vent pipe, and addresses the key design matters of deployment, height, discharging capacity and automatic monitoring device of torch as well as the discharging gas concentration, installation position and security device of the vent pipe

    文章分析了火炬系統和放空管的火災危險因素,並從火炬的布置、高度、排放能力、自動監控裝置以及放空管的氣體排放濃度、安裝位置、安全裝置等方面,重點論述了火炬系統和放空管的消防安全設計要點。
  3. Through the transforming, the annual production capacity must reach 100sets for 500kv china shell, 3000 sets for 110kv electrical capacity casting pipe sets for 220kv capacitance casting pipe

    生產瓷套的主要原材料粘土長石石英,鋁礬土等到可在陽泉市郊區和附近區域得到長期穩定充足的供應。
  4. The project involves decommissioning and disposal of a clinical waste incinerator with an internal furnace capacity of about 1 cu. m. and the entire incinerator flue pipe from the sub - lower ground floor up to the 7th floor and above the roof of tang shiu kin hospital

    工程包括清拆及處理位於鄧肇堅醫院的醫療廢物焚化爐(其容量為1立方米)及整個煙道(由下層至七樓向上伸展至醫院大樓頂部之上) 。
  5. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土受力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承載力的因素入手,基於圓孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承載力計算公式;通過對噴射漿液、噴射壓力選取、噴射直徑估算、樁長及樁位設計等各種計算參數的深入分析和研究,提出了一套相應的旋噴樁復合地基設計計算方法;通過計算分析,深入探討了旋噴樁復合地基變形隨荷載變化規律、樁和樁間土變形協調關系、樁土應力比及復合地基壓縮模量的確定,並提出相應的設計方法和修正參數;此外,結合工程應用,對旋噴樁復合地基的施工技術及其現場質量檢測方法進行了較全面的探討。
  6. Takes several energy saving measures for air conditioning system, nick a large capacity centrifugal chillers working with variable frequency nil capacity chillers, variable frequency and variable flow control on secondary pump water systems, cooling tower for four - pipe water system in winter, fan - coil unit for commercial peripheral zones aid all - air systems for interior zones, variable frequency control on supply and exhaust air fain, enthalpy control on fresh air cooling in winter and intermediate season

    採用了多項空調節能措施:大冷量離心冷水機組搭配變頻小冷量機組,二次泵變頻變流量空調水系統,四管制風機盤管冬季用冷卻塔換冷供冷設計,商業外區風機盤管、內區全空氣空調系統,送風機、排風機變頻控制,過渡季、冬季利用室外新風通風降溫的焓值控制設計。
  7. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  8. The scheme embraces four projects, namely ( 1 ) to build up sluices at anqiu bridge and nanzhou bridge ( and the one at anqiu bridge is the first choice ) so that pollutants can be from entering the lake ; 2 ) as a necessary accessory for the above project, to supplement water capacity from changdang lake as a strategic water source into the protection program, and culvert - pipe plan is recommended from two other alternatives through systematic analysis ; 3 ) to carry out comprehensive realignment for some reed regions which are located at the entrances of the lake, and to develop a wetland ecosystem mainly with some reeds ; and 4 ) to set up a green protection belt right round the lake, including planting reeds at lakebeach, building forest belt, developing bases of green foodstuff and disposing sludges in the lake base

    該方案由4個工程子系統組成, ( 1 )截污工程:在岸丘橋和南州橋位置各築一節制閘(而岸丘橋工程又是首選工程) ,以封住湖泊兩頭入流,杜絕污染物進入水源地的截污工程; ( 2 )引水工程:是截污工程的配套工程,利用下游長蕩湖來補充水量,並對3個引水工程設想進行了系統分析,推薦涵管方案,同時將長蕩湖作為該市戰略水源地一併納入保護體系中; ( 3 )濕地生態處理工程:對進入蕩區前的蘆葦區進行綜合整治,發展以蘆葦為主的濕地生態處理工程; ( 4 )環湖綠色自然保護帶工程:包括建設圍湖蘆葦蕩、環湖林帶、綠色食品基地以及污泥處置。
  9. Based on the analysis of the inadequacy of the lifting capacity of piling barge in large - diameter prestressed concrete pipe pile driving construction, the measure of applying buoyancy generated by cavity drainage to remedy the inadequacy is put forward

    摘要針對混凝土大直徑管樁沉樁施工時打樁船吊裝能力存在不足的問題進行了分析,提出了利用管樁空腔排水產生的浮托力來彌補的措施。
  10. Permissive length of seamless steel pipe used as slings for lighting load and its bearing capacity

    用無縫鋼管作起重吊具的允許長度和承載能力
  11. Rivet welding : 805000mm folder, 1200t oil press, 12t edge planner, 620m - 250mm digital controlled cutting, 70mm didital controlled pipe bender, max elevating capacity is 160t

    鉚焊: 805000mm卷扳機1200t油壓機12m刨邊機620m - 250mm數控切割機70mm數控彎管機最大起重能力160t 。
  12. The results reached are compared and discussed. the ways and means that are presented by schmertmann and the steel pipe society of japan of making certain of the bearing capacity of a single pile through the knocks of spt are verified. finally some views and suggestions of authors are arrived at

    對豎向荷載作用下,單樁的承載力理論、承載力的確定方法進行了一些歸納和總結,並結合一實際打樁(小直徑預制樁)工程對幾個典型的單樁豎向承載力計算公式進行驗證,並與能夠代表真實值的靜力載荷試驗結果對照,分析特定條件下各計算方法的精度及其局限性。
  13. The aberdeen lower reservoir had a capacity of 91, 000, 000 gallons and a catchment area of 1, 009 acres. water was transferred by an 18 - inch diameter water pipe through island road, victoria road and via sandy bay to filters in the western district, known as the elliot

    香港仔水塘儲存的雨水,由一條直徑18寸的輸水管,經香島道、域多利道、大口環至西區( elliot )濾水廠過濾,供市民飲用。
  14. On the basis of investigation into the basic situation of the seamless steel pipe industry of our country, and by using industry organization theory and sorter ' s competition forces model, a detailed analysis is made on the present situation, ambient condition, organizational structure and competiveness of the industry, and the integral development strategy concept of total quantity control and structural reform and three strategic modes of establishing big scale strategic corporation, one point focus strategy and multiple operation strategy to realize the strategy concept is proposed hi this paper in order to strengthen centralization and speed up the structural reform of the whole industry so as to enhance its international competitiveness and profit making capacity

    本文在調查研究我國無縫鋼管行業基本情況的基礎上,應用產業組織理論和波特競爭力量模型對行業的現狀、環境條件、組織結構和競爭性進行了比較詳細的分析,並據此提出了控制總量、調整結構的總體發展戰略思路和組建大型戰略集團、集中一點戰略和多樣化經營戰略三種實現這一思路的戰略模式,以提高行業的集中度和加速整個行業的結構調整。從而提高行業的國際競爭能力和贏利能力。
  15. Handan qunshan foundry co., ltd is an export enterprise, with a capacity of 20, 000 tons yearly, and mostly exports directly. the main materials are ductile iron, grey iron, stainless steel, colored alloy and so on. the main product range includes manhole covers, gratings, mobile accessories, pipe fittings and so on, which widely used in airport, expressway, city instruction, electrical power establishment machinery and so forth

    邯鄲群山鑄造有限公司是一家以直接出口為主的外向型生產企業,主要生產球墨鑄鐵灰鑄鐵不銹鋼有色合金等鑄件,年生產能力兩萬噸,產品主要有城建用下水道井蓋系列水柵系列汽車配件系列管件系列等,廣泛用於機場高速公路城建電力設施機械車輛等,產品遠銷到歐美中東及東南亞等十多個國家和地區。
  16. This will appeal to engineer in the design process of the public building air condition system, satisfied the room function request, at the same time, proceeding sound attenuation sound absorption design of the air condition system reasonably. according to the noise of air - condition system and the pipe regenerative noise, compute demanded sound deadening capacity. designing and choosing the right type and equally outline measures

    目前,在建築設計過程中通常首先計算空調設備運行時產生的設備噪聲以及空調管道工作時產生的再生噪聲;然後根據建築設計手冊中相應的噪聲允許值的規定計算出系統所必需的消聲量;最後根據空調系統的實際情況,科學地確定適宜的消聲器類型和規格,以此達到使用空間的噪聲要求。
  17. 6th, wear resistant, pipe wall friction coefficient low, the resistance to flow is small, delivery capacity

    6耐磨性強,管壁摩擦系數低,流阻小,輸送能力強
  18. Specifically , dtm divides fiber pipe capacity into frames of 125 microseconds , which are further divided into 64bit slots

    具體地講, dtm把光纖的通道容量分成125微秒的幀,而這些幀又進一步分成64位的隙。
  19. The main technique measures for the design and construction of steel pipe pile are confirmed based on the calculation of vertical and horizontal bearing capacity

    通過計算鋼管樁的垂直承載力和水平承載力,確定了鋼管樁工程設計施工的主要技術措施。
  20. Abstract : pushing force calculation and main motor capacity calibration are conducted for the three push bench pipe mills currently used in the country

    文摘:對我國現有3套頂管機進行了頂推力計算,對主電機容量進行了校驗。