  1. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對沉降為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數值計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  2. Based on the close analysis of the influence factors of the vertical bearing capacity, circular aperture extension theory is employed to establish the computing formulas for the pile vertical stress and the foundation vertical bearing capacity, respectively. moreover, with analyzing the features of the calculation parameters such as materials of gunite mortar, jet pressure, diameter of the jet pipe, pile length, pile layout, a design theory for chemical churning pile composite foundation is proposed. then, the variation of the pipe deformation with loads, the deformation coordination of pile and soil are studied

    在此基礎上深入探討了旋噴樁的樁土受力特性及其復合地基的加固機理,從影響旋噴樁復合地基豎向承載力的因素入手,基於圓孔擴張理論給出了樁體豎向應力及旋噴樁復合地基的豎向承載力計算公式;通過對噴射漿液、噴射壓力選取、噴射直徑估算、樁長及樁位設計等各種計算參數的深入分析和研究,提出了一套相應的旋噴樁復合地基設計計算方法;通過計算分析,深入探討了旋噴樁復合地基變形隨荷載變化規律、樁和樁間土變形協調關系、樁土應力比及復合地基壓縮模量的確定,並提出相應的設計方法和修正參數;此外,結合工程應用,對旋噴樁復合地基的施工技術及其現場質量檢測方法進行了較全面的探討。
  3. As a new foundation improvement technology, the cast - in - situ concrete thin - wall pipe pile ( pcc pile ) is applied widely in the construction of the highway, civil architecture, haven and sea embankment etc. the pcc pile has a great prospect because it has superiority in the treatment of soils, such as construction period, cost and environment protection

    現澆混凝土薄壁管樁(簡稱pcc樁)及其復合地基是一種全新的地基處理新技術,已應用於高速公路、民用建築、港口、海堤等工程建設中, pcc樁在處理效果、工期、造價、環保等方面具有較大的優越性,因此在地基處理中具有廣闊的應用前景。
  4. The reason of blocking pipe while pouring the pile of bridge foundation is analyzed, and the dealing methods are expounded

    對橋基礎灌樁堵管進行了原因分析,論述了堵管事故的處理方法,闡明了灌樁堵管的具體對策。
  5. Abstract : the reason of blocking pipe while pouring the pile of bridge foundation is analyzed, and the dealing methods are expounded

    文摘:對橋基礎灌樁堵管進行了原因分析,論述了堵管事故的處理方法,闡明了灌樁堵管的具體對策。
  6. Performance of cast - in - situ concrete thin - wall pipe pile composite foundation under road embankment

    路堤下現澆薄壁管樁復合地基工作特性分析
  7. In which, it gives inquiring of the construction of deep - water foundations and the usage of floating crane. the construction program of bridge pier foundation will be fixed according to the water depth. if the water depth is less than 4m, pier foundation will adopt the method of building island by earth filling ; if the water depth is more than 4m and there is over burden at river bed, at the same time, it has sufficient bearing capacity to load steel pipe pile, the steel pipe pile platform will be adopted

    其中,對深水基礎的施工及浮吊的使用進行了探討,根據水深確定橋墩基礎的施工方法,對水深不超過四米的橋墩基礎,採用填土築島的方法:對水深大於四米,河床有覆蓋層,且能保證鋼管樁具有足夠的承載力的橋墩,採用鋼管樁平臺;對主河道上河床沒有覆蓋層,鋼管樁無法插打的橋墩,採用浮式平臺。
  8. Application of foundation pit support technology of steel - pipe pile with anchor

    鋼管樁附加錨桿基坑支護技術的應用
  9. That causes new problems of construction on making use of or abandon old basis structure. based on the characteristics of the bridge foundation, this paper in detail introduces the design of construction procedures, construction methods and technological process for large temporary structures in foundation construction and driven or pull out steel casing pipe etc, which are seldom meet in common bridge construction. about digging and con struction of foundation piles, dynamic detection method of pile foundation etc. are also introduced and analysized

    由於設計的變更,前期已施工的基礎結構與修改後的結構有較大差異,給施工帶來舊基礎利用和廢棄處理等新問題,本文針對該橋的基礎特點,詳細介紹了基礎施工中大型臨時結構、打拔鋼護筒等一般橋梁施工中很少遇到的施工工序的設計、施工和工藝問題,對于基樁的開挖和施工、樁基的動態方法檢測等問題也作了詳細介紹和分析。
  10. Study on calculation method about settlement of pre - stressed concrete pipe pile composite foundation

    預應力混凝土管樁復合地基沉降計算方法研究
  11. Taking the foundation pit engineering of shiji jiayuan as an example, the reinforcement technique that using porous board is proposed, which is combined with anchor nets of slope and steel - pipe pile support structure

    結合世紀家園基坑工程,提出了採用粉噴樁多孔板暗撐加固抗隆起技術,與邊坡噴錨網、鋼管樁聯合支護結構相結合。