pipe tunnel 中文意思是什麼

pipe tunnel 解釋
管道隧洞
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • tunnel : n 隧道;地道;坑道;管道,煙道,風洞;【礦物】石巷,平峒。 tunnel warfare 地道戰。vt (〈英國〉 l...
  1. If the character of wall rock is finer, it is smaller for suffered force and distortion of tunnel pipe liner structure, contrarily it is bigger

    性態好的圍巖,隧洞襯砌的受力和變形較小,反之則較大。
  2. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河水庫供水工程取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水流流態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上水與泄水要求,對其過流能力也要經試驗確定,為碧流河水庫增建旁通管設計提供依據。
  3. In order to achieve the optimized tunneling approach, first, tunneling procedures, shift length, horizontal jet grouting length, bench length and space length between c and d part of crd method are optimized ; on the basis of these results, two kinds of tunneling schemes are calculated with three - dimensional fem and the optimized tunneling scheme is achieved. as results of the optimized scheme, the conclusion is made that the gas pipe above the tunnel of sk3 + 355 section is secure. the calculation results are verified through comparison of numerical simulation results and site - monitoring measurement data

    為得出適合本段工程的最佳施工路線,利用大型有限元通用軟體ansys對開挖順序、開挖進尺、水平旋噴長度、臺階長度及crd工法施工的c 、 d部相錯長度進行了有限元數值模擬和優化分析,並利用這些分析結果,進行了兩個施工方案的三維有限元動態施工模擬,得出了較優的施工方案,並利用施工后的地表沉降槽曲線,對sk3 + 355斷面處隧道上方的煤氣管線的安全性進行了分析,得出了利用此施工方案施工不會造成此處煤氣管線破壞的結論。
  4. The application of the shed - pipe advanced support to tunnel engineering

    超前管棚在隧道工程中的應用研究
  5. This paper presents the application technique of large steel - pipe - shed for dealing with collapse of tunnel combining the treatment practice of a tunnel collapse

    摘要以某隧道塌方處理為例,介紹管棚法處理隧道塌方的應用技術。
  6. In accordance with the water tunnel that liner have cooling pipe, thermal insulation temperature rise model adopt difference expression during its through or not water phase, and optimization back analysis of parameters is carried out

    針對本工程引水洞襯砌內布置有冷卻水管,對絕熱溫升模型在通水前後採用了不同的表達式,並分別對其進行了優化反演分析。
  7. Concerning the construction of the shallow cover and the special shallow cover in the tunnel under the special geology conditions, the principle of " to stabilize the slopes with protecting arch ; to strengthen the earth with the pipe - shield support grouting ; to dig a hole shallowly ; to blast slightly ; to use strong supporting structure. " has been adopted to enter the tunnel safely ; in terms of the broken belt, the effective actions such as the pipe - shield support grouting, strengthening the surrounding rock in advance with advanced bolt and steel grids, and so on, are taken to pass the poor conditioned part smoothly

    對于特殊地質中的淺理、特淺埋進洞的施工,堅持「護拱穩定邊仰坡,大管棚注漿加固土體,淺打眼、弱爆破、強支護」的原則,做到安全進洞;對于斷層破碎帶,則採取了管棚注漿,超前錨桿預先加固圍巖並結合鋼格柵支撐等有力措施,順利通過了不良地段。
  8. After a discussion of the heat transfer condition of the chilled water pipe which is installed in tunnel, the relation between the temperature of the chilled water and its transportation distance, the author holds that a central refrigeration system shall be adopted, and the loses of chilled water temperature in a long transportation distance could be overlooked on the condition that the pipe is heat insulated

    摘要分析了冷凍水管沿地鐵區間隧道敷設時與周圍環境的換熱狀況;認為採用集中供冷的方式,在隔熱情況下可不?慮冷凍水因長距離輸送而引起的溫升損失。
  9. Analysis on ground subsidence for tunnel pipe - jacking pre - support

    隧道頂管預支護的地表沉降分析
  10. Axial - flow ventilation fan is applicable to canging air ordissipating hear at such places as metal lurgical factory, steel rolling mill, chemical plant, refrigerating chamber, restaurant, grain depot, cultivating field, tunnel, storehousr, residence, ect. while removed the shell, it in the long echaust pipe with series connection method. the fan has complex structure, low noise, wide power selective range

    72型離心通風機可作為工三及大型建築的室內通風換氣,還可作輸入氣體,輸送空氣或其它不自燃的對人體無害的,對鋼鐵材料無腐蝕性的氣體,氣體溫度不得超過80 。
  11. 1. under the same kind of wall rock and the same condition, displacement of pipe liner is symmetry, for tunnel structure and suffered load are symmetry. as level terra stress is bigger, the maximum of displacement and the first main stress occur in tie - in of pipe liner structure, and its direction is radial and points in hole ; the direction of the third main stress is annular and its maximum occurs in top and bottom hole inner

    1 、同一類圍巖在同一種工況下,由於結構和荷載的對稱性,管片襯砌結構的位移也表現出對稱性,因水平向地應力較大,位移最大值、第一主應力的最大值發生在管片襯砌結構的接頭處,方向為徑向指向洞內;第三主應力的方向為環向,較大值發生在洞頂和洞底內側。
  12. In this paper, it is studied and analyzed characteristic of stress, distortion etc. of pipe liner structure combining dahuofang transport water tunnel practice project, tunnel boring machine construction, and it is considered that affects internal force of pipe liner for early stress of underground structure and digging load. in nonlinear finite element calculation model, folium cells have been simulated among pipe liner and pipe liner and wall rock. under varies load condition, it has educed that changing rule of stress, distortion and load characteristic pipe liner in kinds of wall rock tunnel by analysis and calculation

    本文結合實際工程,分析研究了大夥房水庫輸水隧道工程在採用掘進機施工方法的情況下,利用管片襯砌的結構應力、變形等受力特性,考慮地下結構初始應力和開挖荷載對襯砌內力的影響,採用薄層單元模擬襯砌管片之間、襯砌管片與圍巖之間的非線性有限元計算模型,通過分析計算得出不同荷載工況下各類典型圍巖段隧道襯砌管片受力特徵、應力和位移變化規律。
  13. The provision of a new pipe suction culvert under the cwb tunnel would impose construction difficulties and maintenance problems

    -在中環灣仔繞道隧道之下敷設新的吸水暗渠,在施工方面會出現困難,而維修方面亦會有問題。
  14. For the needs of second - term project for pudong airport there is possibility to construct a tunnel of serving driveway under the operating runway, but it s obviously of great difficulty, and nowdays there are few such projects for reference, so it is urgent to carry out the research to make sure of the feasibility for the construction based on the analysis of geologic information, cross section of the line and restriction of construction, in this paper three construction schemes and the effects of each scheme were analysed : cut and cover method, pipe roof culvert box advancing method. shield driving method

    摘要浦東國際機場二期工程建設存在著在運營跑道下實施地下穿越的可能性,在運營跑道下實施地下穿越難度很大,而目前國內外軟土地區在跑道下實施地下穿越工程很少,因此論文通過研究分析了服務車道地下穿越跑道區域的可行性及方案。
  15. The company has 8 departments, 1 office and 15 affiliated centers, including vehicle management center, equipments lease center, shield tunnel construction management center, pipe - jacking management center and pre - commissioning center

    公司設8部1室, 15個附屬中心,其中包括車輛管理中心,設備租賃中心,盾構工程管理中心,頂管工程管理中心,預投產工程管理中心等利潤中心。
  16. Means any place in which, by virtue of its enclosed nature, there arises a reasonably foreseeable specified risk, and without limiting the generality of the foregoing, includes any chamber, tank, vat, pit, well, sewer, tunnel, pipe, flue, boiler, pressure receiver, hatch, caisson, shaft or silo in which such risk arises

    指任何被圍封的地方,而基於其被圍封的性質,會產生可合理預見的指明危險,在不局限於這個一般性的原則下, 「密閉空間」包括任何會產生該等危險的密室、貯槽、下桶、坑槽、井、污水渠、隧道、喉管、煙道、鍋爐、壓力受器、艙口、沉箱、豎井或筒倉。
  17. To take an actual example, the triple pipe method has been adopted to consolidate the surrounding soil by rotary shot grouting pile and swaying shot diaphragm wall in the construction of vertical shaft and access drift of running tunnel from martyr ' s park to dong shan kou station in no. l line of guangzhou metro. it turns out that this method has met the double effect of both construction support and waterproof

    作為施工實例,在廣州地鐵一號線烈士陵園至東山口區間隧道的豎井及聯絡通道施工中,採用三重管法對周圍地層實施了旋噴樁和擺噴墻加固,達到了施工支護和防水止滲的雙重效果。
分享友人