pipe-still 中文意思是什麼

pipe-still 解釋
管式蒸餾釜
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  • still : adj 1 靜止的,平靜的,靜寂的。2 溫柔的,低聲的。3 沉默寡言的。4 (酒等)不起泡的。5 沒有活力的,...
  1. Another reproduced the most singular combinations with a spinning - top ; in his hands the revolving tops seemed to be animated with a life of their own in their interminable whirling ; they ran over pipe - stems, the edges of sabres, wires, and even hairs stretched across the stage ; they turned around on the edges of large glasses, crossed bamboo ladders, dispersed into all the corners, and produced strange musical effects by the combination of their various pitches of tone. the jugglers tossed them in the air, threw them like shuttlecocks with wooden battledores, and yet they kept on spinning ; they put them into their pockets, and took them out still whirling as before

    還有一個耍彈簧地陀螺的演員,他使那些地陀螺滴溜溜轉起來配合得極其巧妙,看了簡直叫人難以置信,這些嗡嗡作響的陀螺在他的操縱下,活象是一些旋轉不停的有生命的小動物,它們能在煙斗桿上,軍刀刀口上,以及在那些拉在舞臺上的頭發一樣細的鋼絲上旋轉著跑個不停,它們能圍著幾個大水晶瓶打圈轉,它們能爬竹梯,能四面八方到處跑,同時發出各種不同的響聲。
  2. And doady, knock the ashes from your pipe, the seasoned briar you still fancy when the curfew rings for you may it be the distant day

    還有大肥,把你煙斗里的灰磕打掉吧。通知熄燈的晚鐘已敲但願那是遙遠的未來的事!
  3. In model zw. the indirect heating still is omitted. the condensor adapts calandria heat exchanger. of course the screw plate heat exchange and coil pipe cooler can also be provided as request. when adapt coil pipe cooler, the buffer tank

    冷凝器採用列管式換熱器,也可根據用戶要求供應螺旋板式換熱器,冷卻器採用盤管式冷卻器,採用盤管式冷卻器並配套供應穩壓罐和比重測定器。
  4. Such sub jade material as the white cover, black cover, purplish red cover or pipe oil cover, autumn pear peel, deerskin, etc., the cover does not invade the inside, the inside is still white, it is all first - class good material to be so long as moist

    白皮黑皮棗紅皮或煙袋油皮秋梨皮鹿皮等子玉料,皮不侵入內部,內部仍是白色,只要潤都是上等好料。
  5. With the fea software ansys and shell element which has high - precision, this dissertation optimize the size and thickness of skeleton section and seek steel pipe which still have strength and stiffness surplus under static state working condition : sinkage of 240mm of rear wheel. it ' s fully loaded in the state of static bending and torsion. after that, amelioration is achieved for even strength design

    本課題運用ansys有限元分析軟體,並且使用精度較高的shell殼單元作為建模單元,在靜態條件下,通過對左右後輪下沉240mm的彎扭聯合工況的模擬分析,尋找出骨架中存在強度和剛度富裕的構件,使之達到輕量化改進的目的。
  6. Construction technique of pressure filling concrete to still pipe inner arch of 75m span tie bar arch bridge

    系桿拱橋鋼管拱內混凝土的壓注施工工藝研究
  7. Despite having spent hk 1, 700 million on this shenzhen river regulation project, the shenzhen government still thinks the river is too polluted and that the next course of action is to spend a further rmb 950 million to build a pumping station at sha tau kok and a 13 km long pipe to bring water from mirs bay to flush the shenzhen river

    雖然這項深圳河調整工程耗資港幣17億,但深圳特區政府認為河道污染情況仍然嚴重,因此計劃進行次階段工程:耗資9 . 5億人民幣在沙頭角與建一座抽水站和13公里長的管道,把大鵬灣海水引進深圳河。
  8. All parts such as condenser, voltage stabilizing tank and cooling coil pipe which contact with alcohol equipments all adopts stainless steel material. distillation still adopts demountable u type heating pipe

    本裝置中凡接觸酒精設備部分如冷凝器穩壓罐冷卻蛇管等均採用不銹鋼,確保成品酒精不被污染。
  9. Standard ( conventional ) port balls are up to one pipe size smaller than nominal pipe size, but still have significantly better flow than globe valves

    標準(常規)流道球閥用於管道直徑比管道公稱通徑小的管道,但是其流通能力仍然比截止閥好得多。
  10. It has a bright prospect for application. however, application of the heat pipe applied in the air - conditioning system just begins and there are still flaws abouts it which need to be improved. in this paper, associating heat feature of air - conditioning system with running environment, an inclined gravity heat pipe as the structure of the heat pipe heat exchanger in air - conditioning system will be studied

    熱管作為一種高效的傳熱元件,有著諸多優點,但就目前而言,熱管用於空調系統能量回收利用的應用還處于推廣階段,本論文結合空調系統運行的環境,研究應用於空調系統的傾斜式重力熱管,它可以根據空調系統室外新風的季節變化,通過調節熱虹吸管的傾斜角度,實現全年的排風能量回收。
  11. With the integration of a thermometer in the handle of the ball valves the cost of the on - site assembly is slightly reduced, at the same time this compact assembly enables a still more space saving layout of the pipe system

    採用球閥集成溫度計,可以適當減少現場裝配的成本,同時這種緊湊的裝配也可以為管道系統節約空間。
  12. Model w still may use disassembled u type heating pipe. when maintenance, it can be removed out to the still. so it is very convenievt to clean the outer wall of heating pipe and the inner wall of still

    W型之蒸餾新釜採用可拆式u型力口熱管,在檢修時可將u型加熱管移出釜外,便於對加熱管外壁及蒸釜內壁進行清洗。
  13. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變流量測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱量、熱泵空調器供熱量(製冷量) 、熱泵空調器輸入功率、埋管單位管長換熱量、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱泵運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱泵系統停機一周內地溫恢復特別快。
  14. Flat miniature grooved heat pipe ( fmghp ) has attracted increasing attention from researchers for its prospect on cooling the micro - electronic elements. some creative works have been done by foreign researchers, but it is still lack of relevent research in our country 。 this paper studies the fmghp with grooves in one side of the plate in a detailed way based on the theoretic works made by the former researchers

    微小型槽道平板熱管因其在微電子設備冷卻領域的廣泛而又重要的應用前景,已經越來越受到研究人員的重視。國外對該種熱管的研究已經取得了一些開創性的成果,但是相關研究在我國還較缺乏,處于起步階段。
  15. This paper includes : on the basis of ty160c bulldozer made in tianjin construction machinery works, completing the design and intensity verifying of dgsy - 25 pipe crane ; using high - grade 3 - dimensional plotting software ug ( unigraphics ) to sculpt ; using adams ( automatic dynamic analysis of mechanical systems ) to establish virtual prototyping model and do dynamic simulation, and verifying the feasibility of this design precept and provide the basis for trial - manufacture of physical prototyping. at the same time, still simulating all kinds of danger operating mode in the course of production, which provides the theoretical foundation for rationally selecting ballast type to prevent the occurrence of overturn accidents

    本文在天津建築機械廠生產的ty160c推土機的基礎上,完成了dgsy - 25型吊管機的改裝設計及強度校核;使用三維實體建模軟體ug建立了模型;使用機械繫統運動學/動力學模擬軟體adams建立了液壓? ?機械一體化的虛擬樣機模型,並進行了動力學模擬,驗證了設計方案的可行性及結構設計的正確性,為物理樣機的製造提供了參數依據;對生產作業過程中的各種危險工況進行了模擬分析,為科學地選用配重類型以防止傾覆事故的發生提供了理論依據。
  16. But the low pressure pipeline technique is not widely used in north china, the main reasons are the irrigation are is more larger the north china, and the low pressure pipeline irrigation system is very large, the corresponding pipe, pipefitting is very lack, all these make the use of low pressure irrigation in south china very little, and now there is still not the standard of low pressure pipeline irrigation for south china

    由於南方地區灌區面積大,管灌系統規模大,與其相配套的大口徑管材、管件規格少,配套建築物較多,灌區類型多樣,壓力變化范圍大,技術難度高,基層工程技術人員了解和掌握不充分,至今尚無適合南方地區低壓管道輸水灌溉工程設計的規范,這些是影響南方低壓管道輸水灌溉技術發展的因素。
  17. In addition, at this strong coupling, heavy inertia, non - linear, uncertain system, it initial proposes and adopts multi - mode segmented intelligent fuzzy control strategy. the control strategy was carried on the simulation experiment by the data making through producing the scene, having made the good control result. considering still that change of environmental temperature impacts on temperature of steel pipe, in which fbe is colloidized, it put forward the method of adjusting temperature setting value according to environmental temperature

    另外文中又對這一強耦合、大慣性、非線性、不確定系統,提出了採用智能模糊多模態分段控制策略,通過在生產現場取得的數據對該控制策略進行模擬研究,取得了良好的控制效果;還考慮到環境溫度變化對fbe膠化時鋼管溫度的影響,提出了依據環境溫度變化調整溫度給定值的方法,模擬證明了該演算法的有效性。
  18. They got theirs with a lead pipe, and i ' m still here surviving

    他們死在鉛管下面而我仍然活著
  19. They got theirs with a lead pipe, and l ' m still here surviving

    他們的腦袋被插了鉛管,而我還在這里活著
  20. Atmospheric pipe still

    常壓管式爐
分享友人