plan of schedule 中文意思是什麼

plan of schedule 解釋
進度計劃
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  • of : OF =Old French 古法語。
  • schedule : n 1 目錄。2 表(格);清單,明細表。3 〈美國〉程序表,計劃表;進度表;時間表。4 〈美國〉預定日期...
  1. The plan was fulfilled ahead of schedule

    這計畫比進度提前完成。
  2. We are delighted that the production plan has been fulfilled ahead of schedule

    生產計劃提前完成,我們感到高興。
  3. Let ' s work harder so that we may fulfil our plan ahead of schedule

    讓我們工作得更努力些,以便能提前完成任務。
  4. Visit labor and social security office according to heibei " plan as a whole about former trade the enterprise rested with backing down on january 1, 1999 personnel annuities plan hair transfers the announcement of method " ( ji lao company [ 1999 ] 36 ) file regulation, right due to illness ( contain because labour causes damage, be not ) deal with retire ahead of schedule ( quit working ) personnel, its are basic old - age pension is same send by country of the state council [ 1998 ] the plan hair way that 26 files provide and the specific measure that heibei saves plan hair

    根據河北省勞動和社會保障廳《關于原行業統籌企業1999年1月1日以後退休人員養老金計發過渡辦法的通知》 (冀勞社1999 36號)文件規定,對因病(含非因工緻殘)辦理提前退休(退職)人員,其基本養老金一律按國務院國發1998 26號文件規定的計發辦法和河北省的具體辦法計發。
  5. We work hard ( so ) that we may fulfil our plan ahead of schedule

    我們努力工作為了要提前完成計劃。
  6. Let ' s work harder so that we may fulfill our plan ahead of schedule

    讓我們更加努力工作,以便能提前完成計劃。
  7. As the production schedule is assigned, any department must carry out unconditionally. the production dispatcher should follow in time the implementation of the plan of the workshop to feedback the problem in time and solve them asap. 3

    加大綜合檢查力度,對那些有章不循違章違紀者給予相應的經濟處罰及必要的行政處理,在企業內部真正形成一種紀律嚴明緊張有序積極進取的良好工作氛圍。
  8. Forecasting irrigation schedule is the core of water management and the work for compiling a dynamic plan of irrigation water use to realize the strategic objective for integrated water - saving in irrigation districts

    灌溉預報是灌區水分管理、編制動態用水計劃、實現灌區綜合節水戰略目標的主要核心內容。
  9. Manugisticss transportation and distribution route plan can build up routes for daily operations, and set up the plan of main shift schedule during each plan cycle

    Manugistics的運輸配送路徑規劃,能建立每日運作的路徑,並且於各計畫周期中設定主班表規劃。
  10. The production cycle is long. 3rd, the stock of manufactured and semi - manufactured goods is larger. 4th, there are lots of alteration and breakthroughs in the production course, in view of this kind of specific condition, 1st, the authority of production process plan should be ensured. 2nd, the need plan for material should be in time. 3rd, the plan of shops operation should be well - conceived. 4th, the schedule plan should be reasonable. 5th, to ensure the accuracy of monitoring information

    針對這種具體情況,所設計的小批量訂貨型生產計劃與生產監控體系在實施生產計劃與監控時做到五點: 1 、要保證生產進度計劃的權威性; 2 、要保證物料需求計劃的及時性; 3 、要保證車間作業計劃的周密性; 4 、要保證日程計劃的合理性; 5 、要保證監控信息的準確性。
  11. Tentative plan of making classifical schedule for chinese medicine research documents in

    類編列中醫文獻研究旨歸分類表的設想
  12. Policy - holder is old period after life - insurance pay insurance cost, retreat ahead of schedule before insurance expires protect, two kinds are retreated differently maintain pattern, one kind is to arrive two years in retreat the poundage with already handed in insurance cost to deduct certain is pressed when protecting reimburse insurance cost ( the insurance cost that waits to will be received then undertakes returning returning after deducting poundage, not plan breath or do not keep a cost ) ; another kind returns cost of money namely, back down during exceeding particular insurance namely protect, right now insurance company according to previous provision each period cost of money undertakes returning returning to policy - holder, be equal to gold of repayment of capital and interest are returned to already paying insurance cost after deducting certain overhead expenses, the cost of money after arriving 2 years 3 years commonly has exceeded the insurance cost of original pay, will have compound interest rise in value according to fixed interest rate, the cost of money that these can add after clauses gets exact numerical value on the watch

    投保人為多年期的人壽保險繳納保費后,在保險到期之前提前退保,有兩種不同的退保方式,一種是一到兩年之內退保時按已交保費扣減一定的手續費退還保費(等於是將收到的保費在扣除手續費后進行返還,不計息或不保值) ;另一種就是退還現金價值,也就是在超過一定的保險期間後退保,此時保險公司按照先前規定的各期現金價值對投保人進行返還,等於在扣除一定的治理費用后對已交保費返還本金和利息,一般二年到三年後的現金價值就已經超過原來繳納的保費,並將按照一定的利率進行復利增值,這些都可在保險條款后所附的現金價值表上得到準確的數值。
  13. Photo of schedule for implementing village sewerage projects under the port shelter sewerage master plan and its review

    牛尾海污水收集整體計劃及檢討計劃鄉村污水工程的實施時間表圖片
  14. Photo of schedule for implementing village sewerage projects under the north district sewerage master plan and its review

    北區污水收集整體計劃及檢討計劃的鄉村污水工程實施時間表圖片
  15. Photo of schedule for implementing village sewerage projects under the tolo harbour sewerage master plan and its review

    吐露港污水收集整體計劃及檢討計劃鄉村污水工程的實施時間表圖片
  16. Photo of schedule for implementing village sewerage projects under the yuen long kam tin sewerage master plan and its review

    元朗及錦田污水收集整體計劃及檢討計劃的鄉村污水工程實施時間表圖片
  17. According to the procedure of activity definition - - - activity ordering - activity time estimating - working out schedule plan - control of schedule plan, schedule plan should be established, which is used to control the whole process. in additional, project time management should be brought to objective management system

    按照項目活動界定? ?項目活動排序? ?活動時間估計? ?進度計劃編制? ?進度計劃控制的程序,制定出項目進度計劃,據此進行過程式控制制;並將項目時間管理納入目標管理體系。
  18. After the part that repays ahead of schedule or the capital that borrow money entirely are repaying no longer plan receive interest

    提前償還的部分或全部貸款的本金在償還后不再計收利息。
  19. 8. since the existing production plan of discrete processes or continuous processes ca n ' t meet the demand of hybrid processes, a four - staged planning method that may be used to generate operation plan of hybrid process is brought forward. 9. taken northwest zircotube co. ltd as an example, the schedule system of this hybrid process is researched and implemented successfully

    由於混合型生產過程的特殊性,使得無論是離散型還是連續型的生產控摘要制方式都無法滿足要求,因此,本文應用「年、季(月) 、周、日(班) 」四級計劃控制方式,這種控制方式遵循「時間分段滾動、規劃分層決策」的原則,並採用多級自動反饋機制。
  20. This system has been implemented to plan and schedule lunar satellite " payloads. at last, the simulation result is given and it shows the feasibility of algorithms

    該系統的模型和演算法具有一定的通用性,經過適當的改進,成功應用在探月衛星有效載荷的規劃與調度問題上。
分享友人