plan phase 中文意思是什麼

plan phase 解釋
計劃階段
  • plan : n 1 計劃,設計,方案,規劃;方法;進程表;時間表。2 圖,圖面;平面圖,設計圖;示意圖;圖表;(街...
  • phase : n 1 形勢,局面,狀態;階級。2 方面,側面。3 【天文學】(月等的)變相,盈虧;【物、天】相,周相,...
  1. From 1980 to 1996, the amount of accident jet plan and turbine aerotransport which taking off weight exceed 5700kg all over the world is 621 times. in which there were 287 times wretched accident in the approach and landing phase, occupying 46 percent

    從1980年至1996年,全世界最大起飛重量5700公斤以上的噴氣式和渦輪螺旋漿運輸機發生重大死亡事故621起,其中發生在進近著陸階段的重大死亡事故287起,佔46 。
  2. Monitor apparatus can measure valid value of three phase voltage and current, power factor, three phase disequilibrium, instant flecker of short time and harmonic without twenty, degree and harmonic distortion total. the paper are laid on the following. ( 1 ) master plan and function of circuit, ( 2 ) hardware design including circuit and principle of a / d conversion, phase lock, liquid crystal display and keystroke and so on, ( 3 ) design of system software including digital filtering, fft, a / d conversion and monitor interface of pc, ( 4 ) system test

    監測儀能夠完成包括三相電壓、三相電流的有效值、功率因數、三相不平衡、電壓短期閃變、以及20次內的諧波、諧波相位、諧波失真總量等的測量。論文重點介紹了以下幾部分: ( 1 )電路的總體設計和功能; ( 2 )硬體設計,包括a d轉換、鎖相環、液晶顯示和按鍵輸入等原理和電路。 ( 3 )系統軟體設計,包括a d轉換、 fft 、數字濾波等程序的原理和演算法以及上位機監控界面的設計; ( 4 )系統測試。
  3. The efficiency and quality of passenger, railway station ' s tasks effects the accomplishment of the railway transportation directly. the dispatching work is the key of prt " s running and organization which depends closely on the phase plan and the cars " transferring plan

    客運站作業的效率和質量直接影響到鐵路旅客運輸任務的完成,客運站的行車組織工作以站調工作為核心,他的調度指揮工作是通過編制與執行階段計劃、調車計劃來實現的。
  4. Wan chai development phase ii review harbour - front enhancement review - wan chai, causeway bay and adjoining areas concept plan

    灣仔發展計劃第二期檢討優化灣仔銅鑼灣及鄰近地區海濱的研究規劃概念圖
  5. Have administrative staff no. 15 now, have people 300 more than staff, existing advanced electric motor car platforms wait for 200 of equipment already at first - phase, the plan expands the scale to 600 within the year, estimate when the time comes that the annual output will reach 100 million yuan

    現有管理人員15人,首期已有員工300多人,現有先進的電動車臺等設備200臺,計劃年內將規模擴大至600臺,屆時預計年產值將達到人民幣1億元。
  6. Note that the data from the provider is passed during the prerendering phase of the page and control cycle, so you should plan to process the data and update any logic in the consumer after prerendering is complete

    注意,由於是在頁和控制項周期的預呈現階段傳遞來自提供者的數據,因此在預呈現完成後您應計劃在使用者中處理數據和更新任何邏輯。
  7. Further investigated and analyzed composition structure and flow data that dsa ' s formation of image is systematic at first in this paper, carried on intact summing up to the data in the system, having given out the plan of design of high speed and large capacity data channel of digital formation of image system of x - ray ; deeper discussion of control way on sdram, give solution that many pieces of sdram works togetherses of realizing heavy capacity, designing of heavy capacity deposit board realize storing at a high speed to vision data by frame on the basis of this ; through further investigations of interface of pci bus, optimize back end state machine design and urge procedure making with lower, giving intact pci interface scheme that realize high speed dma data transmission and satisfy request of video transmitting ; further investigate the figure systematic design method of programmable logic devices, due to the difficult point of drifting about of enabled signal in fifo in common use and setting up and keeping of output signal, method has been proposed of improving stability of system making use of signal utilizing the phase locking ring in fpga to offer a lot of clocks to move thus realize coordinating the data between every module of system to transmit at a high speed by making use of fifo

    本文首先對數字減影血管造影( dsa )成像系統的組成結構和數據流向進行了深入研究和分析,並對系統中的數據流向進行了完整的歸納和總結,給出了x線數字成像系統中的高速大容量數據通道的設計方案;在對sdram的控制方式做了深入探討后,給出了實現大容量多條sdram共同工作的解決方案,在此基礎上設計了大容量幀存板實現對圖象數據進行高速存儲;通過對pci總線介面的深入研究,優化後端狀態機設計和低層驅動程序開發,給出了完整的pci介面方案實現高速dma數據傳輸,完全可以滿足視頻傳輸要求;深入研究了基於大規模可編程器件的數字系統設計方法,針對通用fifo使能信號漂移、輸出數據難于建立和保持等設計難點,提出了利用fpga中的鎖相環提供多個時鐘相移的信號來提高系統穩定性的解決方案,從而實現利用fifo來協調系統各模塊之間的數據高速傳輸。
  8. Through analysising the characteristics of the power system with floating neutral point deeply, the paper puts forward a new plan of single - phase to ground fault line selection on the base of s ' s signal injecton method and gives the hardware and software design. in this design, the high speed sampling and data processing is carried out through using dsp processor ; the large electrice current is drived through the application of a high - performance audio power amplifier and transformer ; the communication between host computer and detectors is realized through rs485 bus technology ; the difference multilevel frequency - selected amplifier is designed and the feeble signal of space is sampled on the base of the theory of magnetic induction ; the interface between dsp and exterior chip and rs485 interface logical is designed through using fpga ; the using of lcd module and keyboard interfacing chip makes the interface between human and machine ; the programme of host computer and detectors is designed through using blocking design method

    在本設計中,採用高速的dsp處理器,實現了對故障特徵信息的高速採集與處理;採用大功率的功放晶元與變壓器配合的方法,實現了大電流信號的驅動輸出;採用485總線技術,組建了裝置主機與多探測器之間的主從式通訊網路,實現了多干擾條件下裝置主機與多探測器的可靠通訊;設計了差分式多級選頻放大電路,採用磁感應的方法實現了對空間微弱信號的接收;利用fpga技術,實現了控制器與多外設的介面及數字信號的串並轉換;採用了先進的lcd液晶顯示模塊及鍵盤介面晶元,設計了人機信息交互的介面;採用了模塊化的軟體設計方法,開發了裝置主機及探測器的軟體程序。
  9. The detailed design for central reclamation phase 3, which connects central reclamation phases 1 and 2 with wan chai reclamation phase i, was completed in mid - 1997. implementation of this phase is under review subject to the finalisation of the statutory plan

    中環填海第iii期的詳細設計已於一九九七年年中完成,工程會把中環第i和第ii期填海區與灣仔填海工程第i期連接起來。
  10. The first phase 2006 - 2008, works mainly focus on the development plan and investments invitations, which a development platform for financial sector and industries related to it shall be established through re - vitalization of assets and building constructions

    第一階段2006年2008年,重點抓好和平金融街的發展規劃和招商引資工作,通過盤活資產和樓宇建設,搭建金融及相關產業發展平臺。
  11. Article 25 moi shall follow the conscription plan referred in article 24 hereof to prepare the conscription plan for each phase by month, and deliver the plan to each local government while keeping mod notified of the plan in writing

    第25條內政部應依前條兵員徵集計畫,按月訂定各梯次徵集計畫,送達各直轄市、縣(市)政府,並副知國防部。
  12. The then secretary for planning, environment and lands, under the delegated authority, directed the town planning board to prepare an outline zoning plan for central reclamation phase iii and its adjoining areas

    當時的規劃環境地政局局長獲行政長官授權,指令城市規劃委員會為中環填海計劃第三期及其毗連地區擬備分區計劃大綱圖。
  13. In charge of one of major subjects of the national eighth five - year plan, i. e. " study on shotcreting techniques of polyacrylate emulsion cement mortar for impermeability coating of pu ding rcc dam ", the achievement of which has been appraised by the ministry of electric power and evaluated as reaching national leading level. 2. in charge of the major subject aided by the committee of national natural science funds, " study on durability of high bolumes of fly ash concrete ", the first phase achievement of which has been commended by the committee. 3. in charge of one of major subjects of the national ninth five - year plan, i. e. " study on high performance concrete in marine engineering, design and construction ". 4. acting as one of editors - in - chief of " technical specification for abrasion and cavities resistance of concrete in hydraulic structures ", which is issued by the ministry of water resources. 5. by providing the repairing and strengthening schemes on seepage and cracks of the basement of nanjing lukou international airport, the air traffic opening of the airport was ensured as scheduled. 6. consulting services on techniques of high performance and abrasion - erosion resistance concrete for three - gorges project, anti - corrosion of reinforced concrete strutures for the ore port of shanghai baoshan iron and steel works, mass fly ash concrete for jiangyin yangtze river bridge and pumping concrete for nanjing yangtze river second bridge

    主持國家「八五」攻關項目「普定碾壓混凝土壩上游面丙乳砂漿防滲層大面積施工工藝研究」 ,成果通過部級鑒定,評價屬國內領先水平; 2 .主持國家自然科學基金重大項目「高摻量粉煤灰混凝土的長期性能研究「 ,階段成果獲國家自然科學基金委通報表彰與獎勵; 3 .主持國家「九五」攻關項目「海工高性能混凝土成套技術研究」 ; 4 .水利部「水工混凝土抗沖磨防空蝕技術規范」的主編之一; 5 .為南京祿口國際機場地下室修漏與裂縫補提出技術方案被采納並實施,為機場如期通航作出貢獻; 6 .為三峽工程抗沖磨高性能混凝土技術、上海寶鋼礦石碼頭鋼筋混凝土防腐蝕技術、江陰長江大橋大體積粉煤灰混凝土技術、南京長江二橋泵送混凝土技術等提供咨詢建議。
  14. Participates in planning and execution of monthly hse campaigns and incentive / recognition plan and implement this plan during the project construction phase

    參與計劃和落實每月hse工作安排,制訂表揚和獎勵計劃,確保在施工階段順利執行。
  15. Participates in planning and execution of monthly hsse campaigns and incentive / recognition plan and implement this plan during the project construction phase

    參與計劃和落實每月hsse工作安排,制訂表揚和獎勵計劃,確保在施工階段順利執行。
  16. In the research of the project of multi - user vehicle software radio cooperating with a company in guizhou, the thesis analyzes firstly the characteristics of wire transmission that the co - worker applied in the previous phase. aiming at the vital weakness, the thesis proposes a substitute plan which adopts wireless time divided multiple use software radio communication system to meet the demands of multi - user accessing channel and high flexibility

    在與貴州某單位合作的多用戶車載軟體無線電臺項目中,本文首先分析了合作方前期使用的有線傳輸方案的特點,針對其機動性差的致命弱點,提出了一種採用無線時分復用的軟體無線電通信系統替代方案,以滿足其多用戶復用通道及高機動性的要求。
  17. With the launch of the mortgage - backed securities ( mbs ) in october, the hkmc entered the second phase of its business plan

    按揭證券公司在一九九九年十月推出按揭證券,正式進入第二階段的業務計劃。
  18. Plan phase of enterprise transformation

    企業轉化的計劃階段
  19. Let s take a closer look at the issues you will likely have to address during the plan phase

    讓我們深入了解一下您可能在計劃階段所遇到的問題。
  20. The plan phase involves stakeholders across the enterprise who will carry out the assessments defined in the discover phase

    計劃階段牽扯到將會貫徹在發現階段定義的評估的跨企業的風險承擔者。
分享友人