plate crane 中文意思是什麼

plate crane 解釋
板材吊車
  • plate : n 1 厚金屬板 〈cf sheet〉 板(片);(記有姓名等的金屬)牌子,(尤指醫生的)招牌,藏書牌;【印刷...
  • crane : n 克蘭〈姓氏〉。n 1 鶴;〈口語〉蒼鷺,鷺鷥,鸛;〈C 〉【天文學】天鶴座。2 起重機,吊車,攝影升降...
  1. The total area of the corporation covers about 200 chinese acres and the length of coastline is about 1, 140 meters, the auxiliary facilities have taken shape the main facility and the equipment include the 30, 000 dwt dry dock which is 192 meters long by 40 meters wide the gate width 32 meters and 10 meters deep, is to date the biggest dry dock in fujian province ; one fitting wharf length 65 meters, width 17 meters ; 16 tons portal crane 1 set, 16 tons gantry crane 1 set, mobile cranes 50t1 25t1 12t2 8t4 and other necessary transportation, coatings, the precision work equipment supplying air 120 m min, spraying grit more than 4, 000 m day, renews the steel plate 12 15 t day we can finish repairing all kinds of ships under 40, 000 dwt within 7 to 10 days our corporation obtains the first - class dockyard to repair and build steel - made ships lisence in 2001, passed the national environmental protection appraisal in august 2002, was designated shipbuilding in fujian for maintaining foreign ships in octobet 2002, the dry dock, passage channel, the turning area, fitting wharf are passed by passage safety appraisal in march, 2003

    主要設施和設備有: 3萬噸級干船塢一座長192米寬40米塢門凈寬32米深10米是福建省目前最大的干船塢舾裝碼頭一座長65米寬17米16噸門座起重機1臺10噸門吊1臺汽車吊8臺50噸1臺25噸1臺12噸2臺8噸4臺以及與其相配套的運輸噴塗精加工設備。每分種供氣120立方米,日噴砂面積4000多平方米,日換鋼板15 20噸。一般修船工期為7 10天。
  2. To meet this challenge, a research project was supported by ministry of communication and bv shanghai zhenhua port machinery co. ltd. focusing on analysis of tdtcd ( traditional design theories of crane drums ) the paper has studied the impacts of features under the binding force of wire ropes, the end - plate and rope slot. this study is based not only on the thin shell theory and viscoelastic mechanics to calculate the strength and stability of drum, but also on an experiment with technology in " state of act "

    本文結合交通部重點科技項目「港口起重機鋼絲繩傳動件高性能技術研究」和上海振華港機股份有限公司委託項目「起重機焊接捲筒極限壁厚研究」 ,針對起重機捲筒傳統設計方法偏於保守的情況,以薄殼理論和近代力學為基礎,以現代試驗技術為研究手段,對鋼絲繩緊箍力作用下的外載特性、端板、繩槽等因素對捲筒強度和穩定性的影響進行了系統的理論研究,在深入開展捲筒強度、穩定性和實驗模態分析等試驗的基礎上,提出了有別于傳統方法的捲筒強度、穩定性計算方法。
  3. The conclusion of reappearing analysis is that crane bridge be used as usual because main weld maximum stress of upper cover plate of main beam lower than yield limit though it higher than permissible stress. inner stress of secondary beam was over ultimate strength, and deforming is ultra big. so it was unfit for produce and secondary beam must be changed

    再現分析得出的主要結論為:橋架的主樑上蓋板主焊縫的最大應力超過了許用應力,但小於屈服極限,可以繼續投入使用;副梁內部的應力遠遠超過了強度極限,變形特別嚴重,不能滿足生產要求,因此更換新的副梁;端梁內部的應力超過了屈服極限,小於強度極限,在應力較大的位置焊接補強板;投入使用后,要對整個橋架進行定期檢查。
  4. Using this new web, the material and stiffening plate of web may reduce too much to reduce the main girder weight of overhead traveling crane and reduce the produced cost

    運用這種腹板,可以大大減少腹板的材料和其上的加強筋,從而使橋式起重機的主梁得以大大減輕,從而降低製造成本。
  5. The results show that welding the appropriate reinforcement plate to the girder crack can eliminate crack expanding and assure crane safe operation

    結果表明,採用參數適當的補強板,可降低起重機主梁裂紋尖端的應力,從而保證起重機的安全。
  6. Using the ansys finite element analysis software, this paper analyzes reinforcement plate of different length welded to crane girder crack and find out the girder ' s stress and deformation

    摘要採用ansys有限元分析軟體,對因出現裂紋的起重機主梁而添加的補強板進行系列計算,得出修補後主梁裂紋的應力及應力強度因子的變化規律。
分享友人