plate-to-plate calculation 中文意思是什麼

plate-to-plate calculation 解釋
逐板計算
  • plate : n 1 厚金屬板 〈cf sheet〉 板(片);(記有姓名等的金屬)牌子,(尤指醫生的)招牌,藏書牌;【印刷...
  • to : adv 到某種狀態;〈特指〉到停止狀態;關閉。 ★也常和動詞結合,略去其後賓語,而構成成語: The door i...
  • calculation : n. 1. 計算,計演算法。2. 推定,預測。3. 深思熟慮,精打細算;慎重的計劃;算計。
  1. Being aimed to the irrationality and inadaptability of different calculation methods for wide cantilever plate, study of space numeric simulation analysis about concrete box bridge cantilever plate can be carried out for three dimension solids based on ansys

    摘要針對混凝土箱梁懸臂板諸多演算法的不合理性,應用大型通用有限元分析軟體ansys ,以三維實體單元對混凝土箱梁懸臂板進行空間數值模擬分析研究。
  2. In light of the elastic thin plate theory, the author induced equilibrium differential equation of bi - direction cellular slab, which was proved correct through analysis and comparison to result of ansys to with theoretical calculation. through the deflection and bending moment coefficient calculation of bi - direction cellular slab under various boundary conditions, the author brought forward the theory that the deflection of mid - span and bending moment coefficient calculation of mid - span and support of bi - direction cellular slab could be in accordance with solid plates ", which could satisfy the precision of engineering

    本文根據彈性薄板理論,導出了雙向空腹板的平衡微分方程,並通過理論計算和通用有限元程序ansys結果對比,驗證了其正確性;通過對各類邊界條件下雙向空腹板撓度和彎矩系數的計算比較,本文提出:雙向空腹板跨中撓度及跨中、支座彎矩可使用本文空腹板剛度公式查找現有的實心板撓度彎矩系數表進行計算,完全能滿足工程精度要求。
  3. This paper introduce a software which used to the calculation of the baiting size of the spiral baffle plate and spacer pipe, the dimension of the manipulator, and the maximal arrangement the baffle palte, and the rest spaces

    介紹了一個程序用於螺旋折流板和定距管下料尺寸、折流板加工胎具的尺寸計算以及折流板最大排布數量和剩餘空間量的計算。
  4. Content : the advanced manufacture technologies such as cims , am , cad / capp / cam are developing fastly with the development of computer, network, aritificial intelligence and distributed calculation technologies, which provides a opportunity for manufacturing industry of china to enhance its technology and reach the level of developed countries. computer network is the basic plate for network manufacture, but network security problem is so important that can not be neglected

    隨著信息技術、計算機技術、網路技術、人工智慧、分散式計算等技術的日趨成熟,計算機集成製造、敏捷製造、 cad / capp / cam等先進製造技術也在蓬勃發展,給我國製造業的發展提供了良好的發展環境和發展鍥機,它使我國製造業可以實現跨越式前進,迅速縮短與先進國家的差距,快速提高我國製造業水平。
  5. This paper try to mix the finite strip method and hybrid stress element, and deduce a numerical and computer method which combines the advantages of the two methods - mixed hybrid finite strip method ; analyze the intensity and stability of the orthotropic plate by this method ; deduce the formula of the orthotropic plate ' s analysis and calculation under this method ; compile the program of orthotropic plate ' s mixed hybrid finite strip method ( hfsop. for ) with fortran - 77 language, and perform them under fortran90 environment of pc computer ; comparing with traditional methods by example of computing, prove that the mixed hybrid finite strip method have better degree of accuracy, moderating the stiffness of plate, coming more close to actual conditions, avoiding over - hard or over - soft ; finally, this paper analyze the stability of a orthotropic plate by this method, and deduce the - value of critical stress

    論文將有限條法和應力雜交元法兩者結合起來,導出一種兼有兩者優點的數值計算方法? ?混合雜交有限條法。運用這種方法對正交異性板的強度和穩定進行了分析,推導出正交異性板在這種方法下的分析計算公式,用fortran - 77語言編寫正交異性板混合雜交有限條法程序( hfsop . for )在微機fortran90環境下運行。通過算例與傳統的方法比較,驗證混合雜交有限條法有更好的精度,使板的剛度適中,更接近實際情況,避免「過硬」或「過軟」 ;最後,論文還用此方法對一正交異性板進行了穩定分析,得出臨界應力值。
  6. In view of the construction peculiarity of non - bracket construction trait of y - shape pier upper plate beam in goughexin road viaduct project, the author uses the beam - rod finite element to calculate the whole construction period by steps, compares the result with engineering practice, and finally proves, the calculation can offer reference for the construction and design of non - bracket upper plate beam

    摘要針對共和新路高架橋y型墩上蓋梁無支架的施工特點,採用梁桿單元,對上蓋梁施工過程的各工況進行了分步計算,並與現場測試結果進行比較, ?上蓋梁無支架施工設計提供依據。
  7. At the same time, the mathematical models of the electric field and the flow field distribution were established from the theory of electrostatic enhancement of heat transfer. employed finite differential method and over - relaxation iteration method, according to certain boundary conditions in the wire - plate electrode space, the electric field and the flow field in the wire - plate space were numerically simulated under different initial velocities of r11 stream and different magnitudes of applied voltage. the calculation results agreed with theoretical analysis satisfactorily

    同時從靜電強化換熱理論出發,建立了表徵線板電極間的電場和流場分佈的數學模型,並根據線-板電極間的邊界條件,利用有限差分法和超鬆弛迭代法,分別就不同氣流初速度和不同外施電壓的情況下,對線-板空間的電場和流場進行了數值模擬,計算結果與理論分析基本一致。
  8. According to the working situation of plate rubber support, the contact calculation was simplified ; the calculating amount was reduced

    根據受力情況對平板橡膠支座的接觸方式進行了簡化,降低了計算量。
  9. In order to solve the problem of the difficulty for the complicated shell in stripping away from the mould, the technical trait of the complicated shell has been analyzed, the twi - ejector using stripper plate and ejector sleeve has been designed, the mould operational principle and the structure trait have been discussed, and the die casting machine has been selected based on the swelling force calculation

    摘要針對復雜殼體壓鑄件難以脫模的問題,分析了復雜殼體的工藝特性,設計了卸料板、推管二次推出壓鑄模,論述了模具工作原理和結構特點,並且通過脹型力的計算選擇了壓鑄機。
  10. How to estimate roughly in lamination temperature field and temperature stress field of mass concrete of base - plate are presented. physical and mathematical model of calculation in lamination is established. calculation formula is given and so is the result

    提出了底板類大體積混凝土結構溫度場及溫度應力場的分層計算方法,建立了分層計算物理與數字模型,推導了數學計算式,並給出了底板類大體積混凝土溫度場計算的解析解,從而為初步估算底板類大體積混凝土結構的溫度場及溫度應力提供了方便適用的手段。
  11. Machining deformation of aircraft monolithic component is simulated by finite element method ( fem ) and validated by experiment. the initial residual stress in pre - stretched plate is generated by simulating quenching and stretching processes. with a single tool - tooth milling process fem, the machining loads in monolithic component material removing is obtained. restart - calculation is put forward to complete the whole simulation of machining process. to verify the fem result, an experiment is carried out. the deformation distribution of the monolithic component resulting from fem shows a good agreement with the experiment result, which indicates that the key technologies presented in the paper are practicable and can be used to simulate the milling process of monolithic component to predict its deformation. lengthy and expensive trial and error experiment process can be avoided

    在模擬淬火、拉伸過程獲得含有初始殘余應力的預拉伸板材以及模擬單齒切削過程獲得切削載荷的基礎上,提出並採用接力演算法,對一航空整體結構件的材料銑削過程進行有限元模擬,同時進行了試驗研究.結果表明,有限元模擬的整體結構件的變形與試驗具有一致性,從而證明提出的整體結構件加工模擬關鍵技術的可行性,避免了為研究加工變形而進行的繁瑣的試錯法
  12. The end - plate bolted connections are most calculated and designed as rigid connections in traditional designing, which leads to the significant difference between the calculation result and the real stressed state

    摘要傳統鋼結構設計中將高強螺栓端板連接作為剛性節點,而實際情況下這種連接形式與計算結果有差異。
  13. In order to improve the design of technique within edible oil engineering, according to the structure feature of the plate column used in oil plant recently, the method of calculation has been studied, including the detail calculation of dieter, height, number of plates and effciency of the plate column

    摘要針對目前食用植物油加工過程中廣泛應用的板式塔的結構特點作了較為詳盡的工藝計算,給油脂工程設計尋求到充分的理論依據,從而使板式塔的計算更加精確,促使油脂工程設計水平達到一個新的高度。
  14. The calculation formulae of the segmentation height of the conical transition according to the steel plate width were given, therefore, the length of the steel plate to be used can be calculated

    摘要推導了根據鋼板寬度確定錐體分段高度的計算公式,對錐體進行排料並推導出了排料所需鋼板長度的計算公式。
  15. In this paper, three - tower building with name of oriental tunes square in xiamen is analyzed by the international current program sap2000, considering seismic action in two directions. by structural modeling and calculation, the characteristic of vibration of the multi - tower structure is analyzed, the influences of the rigid ratio of the enlarged base to top tower and translation - torsion coupled effects among several towers are investigated, the inter - story displacement, displacement of the top tower and deformation of tower ' s base floor in x and y major orientation under earthquake action are contrasted with those under wind load. at last, the distributing characteristics of stress of transfer plate and of the normal, shearing stress of mostly vertical elements under earthquake action are studied

    本文以具有3個塔樓的廈門東方時代廣場為分析對象,採用國際通用有限元分析軟體sap2000進行結構建模和分析,考慮雙向地震動輸入,研究結構的振動特性,分析底盤與塔樓剛度比對結構的影響以及多塔之間的扭轉效應和平扭耦聯作用,對比風荷載和地震作用下塔樓在兩個結構主軸方向的層間位移、頂點位移以及塔樓底層的變形,分析地震作用下轉換層樓板的應力分佈特點及主要豎向構件的正應力和剪應力分佈特點。
  16. The mostly content is as follows : ( 1 ) such plate was analyzed continuously in the stimulating sandwich plat method, according to the overseas tests ’ phenomena and results, a crack mode is supposed in the test, and a formulas is deduced to calculate the punching capacity of thin - wall core box cast - in - site reinforce concrete hollow slab, the calculation results agree well with the test results

    主要研究內容如下: ( 1 )採用夾層板理論對這種空腹板進行連續化分析,根據國外的試驗現象和結果,假定破壞模式,推導出薄壁箱體現澆混凝土空腹板柱節點在豎向荷載作用下的抗沖切承載力計算公式,公式的計算值與試驗值吻合良好。
  17. According to the nonhomogeneous anisotropic elastic theory, a calculation model of composite material plate with circular hole in common structural connection section was developed

    摘要針對工程中常見的連接結構中含圓孔的復合材料板,根據非均質各向異性彈性理論建立計算模型。
  18. Exact solutions are derived for the forced vibration of plate on elastic foundation to moving loads, which is based upon the use of the 2 - d fourier transforms to the motion equations and boundary conditions. following a series of deduction, a calculation programme by the methods of numeric integration in fortran is provided

    由系統的運動方程出發,利用界面連續條件,運用積分變換方法對原方程及邊界條件進行了二維fourier積分變換,把偏微分方程組變成常微分方程組,求出加鋪層板系統在移動荷載作用下的撓度解析解。
  19. This paper studied the warp and stiffness of end - plate connection, and studied how the actual stiffness of end - plate connection influence stiff frame ' s displacement, and some design improvements are proposed. a methodology based on finite element modeling is used to establish strong bolted end - plate connection calculation model, and solved the interface between end - plates question and how to add bolt pretension when imitating end - plate connection ' s elastic material characteristic. through analyzing and comparing calculation results and experiment data, this paper summarized bolt force distribution, connection moment resistance, moment - rotation relationship and connection stiffness

    筆者採用有限元方法,建立高強螺栓端板連接的計算模型,模擬了節點彈性階段的工作狀態,較好的解決了高強螺栓端板連接中的接觸面問題和螺栓預拉力的施加問題,通過對計算結果的分析以及與實驗數據的比較,總結出端板連接在彎矩作用下的螺栓拉力分佈規律、節點抗彎承載力及其影響因素,以及節點剛度特性及其對剛架性能的影響,同時,對端板連接受力變形性能也做了十分有益的分析,為輕鋼節點設計方法的改進提供了依據。
  20. ( 3 ) according to the calculation result of 2 - d fe model, a 3 - d fe model was established for the jintang xiangjiang bridge to analyse the effects of the tendons in the top deck, the base plate and the web on the web

    ( 3 )結合平面有限元計算結果,本文依據衡陽金堂大橋建立了實橋的空間節段模型,分析了頂板索、底板索和腹板下彎索對腹板受力的影響。
分享友人