power distribution center 中文意思是什麼

power distribution center 解釋
動力分配中心
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • distribution : n 1 分配,分發,配給;分配裝置[系統];配給品;配給量;【經濟學】配給方法,配給過程;分紅;【法律...
  • center : n vt vi 〈美國〉=centre n 1 中心;中心點;圓心;中央;中樞,核心;中心人物;根源,起源。2 〈常C ...
  1. The thesis makes researches on technologies of call centers, voice disposing technologies and the synthetic application of these technologies. with setting up a call center which is called epcc ( electric power call center ) in a electric power company, the thesis describes pivotal technologies in call centers, such as voice disposing technologies >, crm ( customer relationship management ) and web technologies, the thesis represents standard schemes and standard frames of call centers, and the thesis describes pivotal technologies in voice disposing procedures, such as speech synthesize and speech recognize, and the thesis describes voice disposing technology " s applications in call centers that are called ivr ( interactive voice response ) systems, then the thesis discusses the acd ( auto call distribution ) program in epcc

    本論文通過建立呼叫中心的一個實例(電力呼叫中心) ,對呼叫中心、語音技術及其綜合應用進行了較為深入的研究。通過呼叫中心的電力應用,較詳細地論述了呼叫中心的關鍵技術:語音技術、客戶關系管理crm和web技術等;較深入地闡述了呼叫中心的典型方案和典型結構;較詳細地論述了語音信號處理技術的關鍵技術:語音合成技術及語音識別技術:深入討論了語音技術在呼叫中心的具體應用- - - ivr系統及其關鍵技術;較詳細地討論了電力呼叫中心中所採用的acd演算法,並基於acd演算法完善了呼叫中心的表現形式。
  2. The area of one scheduled time of shendang establish enterprise center is 60 mu, and building area is 58000m ?, there facilities such as worker dormitory, power distribution house, steam pipe network, sewage treatment pipe network

    沈蕩創業中心一期佔地面積60畝,建築面積58000平方米,配套設施有職工宿舍、配電房等,已建成廠房面積32000平方米,有蒸汽管網、污水處理管網。
  3. In connection with the difference and distribution characteristic of the samples in sample space rs based on dga, a new self - adapted weight fuzzy omean clustering model of fault diagnosis of the power transformer based on the potential function is proposed. meanwhile, from the aspect of geometry characteristic of fc - divided in s dimension sample space, a method is proposed for the purpose of getting an effective adjacent radius, adaptive cluster number c and original cluster center of x sample set. for the diagnosis sample x, the property measure and diagnosis rule are proposed, which under the condition of potential density function that determine c number of optimal fuzzy cluster p1

    根據以變壓器dga數據為特徵量的樣本空間各樣本差異特性以及樣本在空間r ~ s的分佈特性,首次提出了基於勢函數自適應加權的變壓器絕緣故障診斷的模糊c -均值聚類模型;同時,從s維樣本空間的f ~ c -劃分幾何特性出發,提出了一種求取樣本集的類勢有效鄰域半徑和自適應求取聚類數和聚類中心初值的方法;對一個待診斷樣本,設計了基於類勢密度函數意義下的屬性測度和診斷準則。
  4. The latest development of elmc, which is composed of distribution power center unit ( dpcu ) and electrical remote terminal ( ert ), is generalized in the paper. elmc scheme is presented according to the characteristic of avionics and the request of fault tolerant electrical power system ( ftep ). ftep structure based on 270v direct current is then designed to realize the demonstration of dpcu

    本文首先分析了elmc在國內外研究發展狀況,並依據航空電子系統特點和容錯供電要求,提出了由配電中心和控制中心組成的elmc的總體方案;完成了270v高壓直流供電的飛機容錯供電系統方案的設計,實現了供電系統中二次配電方案的控制與管理的模擬演示。
  5. Electricity supply : luohe is the biggest hub city of henan electric power distribution center. the total capacity is 1. 02 million kv, which can meet the needs of living and production

    供電:漯河是豫南地區最大的供電樞紐,總容量102萬千伏安,能充分保障生活、生產用電需求。
  6. Gck1 series motor control center is distribution device for ac 380v system and a control device for out - of - phase motor, suitable for distribution device for factories and mines and building, motor centralized - control for metallurgical indi = ustry, chemical industry and light industry production line. it can be equipped with programmable controller and microprocessor, and formed into power supply and power distribution automatic control system

    Gck1系列電動機控制中心是交流380v系統的配電和異步電動機的控制設備,適用於廠礦及建築物的配及冶金、化工、輕工生產線的電動機集中控制,還可於程序控制器和微處理器組成供需自動控制系統。
  7. The construction of the project mainly includes : storage tanks for crude oil 、 intermediate oil and product oil, processing equipment, torch assembly, railway for product oil, highway for loading and transport, sewage disposal plant, heat supply, wind supply, power transformation and distribution, heating and ventilating, communication and other public and storage - transport works, control center and off - set facility for analysis and assay 、 maintenance and repair 、 office work

    該項目的范圍主要包括原油、中間油及成品油罐儲區、工藝裝置、火炬、成品油鐵路、公路裝運、污水處理、供熱、供風、變配電、發電、暖通、通信等公用工程及儲運工程,控制中心,分析化驗、維修、辦公等輔助設施。
  8. Along with the unceasing reformation of power system is unceasing, the government and social put forward the more demand to the market for the power industry, and the tenet of power industry is “ people power for people ”. they continue improve on the style, service quality, and management level of power industry service. a lot of provinces and cities are pressing on with the foundation of client service system through the modern computer and technique of communication web, and building the information system of power distribution, and the call center etc. these systems are the centre of market and customer, and convenience for clients, and optimization the flow of operation, and innovation the way of

    隨著電力體制改革的不斷深入,政府和社會對電力市場服務提出了越來越高的要求,電力部門圍繞「人民電業為人民」的宗旨,不斷改進服務作風、提高服務質量和管理水平,國家電力總公司把2001年作「電力服務質量年」 ,各省網公司、地市供電企業也加緊建立和完善客戶服務支持系統,運用現代計算機和通信網路技術,建立電力營銷管理信息系統、電力客戶服務中心系統、配電網管理信息系統等相關系統,以市場和客戶服務為軸心,以方便客戶為宗旨,優化重組業務流程,創新服務方式,強化監管能力,提高企業決策和管理水平。
  9. The leading industries are digital control machine and processing center, heavy steel casting and precision processing, wind power equipment manufacturing, power distribution equipment, crane facilities, electric instrument industries, etc

    主要發展以中高檔數控機床及加工中心、重型鑄鋼件及精加工,以及風力發電設備、配電裝置、起重設備、電工儀器儀表為主導的產業。
  10. The paper designed a project of plant online load optimal distribution system, which could change the mode of load control between electric power distribution center and power plant. with the use of plant online load optimal distribution system, the power distribution center will not control each power unit directly , but delieve instruction of load to plant online load optimal distribution system which shall assure each unit to operate more economically

    本文針對國內熱力發電廠負荷優化分配中存在的問題,提出了廠級在線負荷優化分配系統的設計方案。該系統的成功應用將改變現在電網總調對電廠負荷控制方式,總調不再直接控制機組,而是針對整個發電廠發出負荷指令,經在線負荷優化分配系統處理后,根據分析計算結果實現各機組的負荷最優分配。
  11. As the important load center of power system, the establishment and evaluation of distribution system ' s reliability index has his characteristics

    作為電力系統的重要負荷中心,城市電網配電系統可靠性指標的建立及定量評估有其自身的特點。
  12. On the base of investigating the research status of adptive protection system, an adaptive protection system of power supply and distribution line of 35kv or under 35kv is constructed based on devicenet fieldbus, industrial ethernet and the offered system ’ s overall structure. it is composed of production process level, bay level, substation level and central control center level

    在充分調研國內外自適應保護系統研究現狀的基礎上,基於devicenet現場總線與工業以太網以及給出的系統體系結構,構建了適用於35kv及以下電壓等級由生產設備層、間隔層、變電站層與集控中心層組成的供配電線路自適應保護系統。
  13. The performance evaluation of distribution is the important part of strategy management in the distribution center. effective evaluation can help the distribution center find the gap and the cause, which motivates the distribution center to strengthen its management and improve its integrated power

    配送績效評價是配送中心戰略管理的一個重要組成部分,有效的配送績效評價能幫助配送中心挖掘經營差距及其原因,從而促使配送中心加強經營管理,提高綜合實力。
分享友人