power sub station 中文意思是什麼

power sub station 解釋
電力支站
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • sub : adj 附屬的,輔助的,補充的。 a sub post office 郵政支局。n 代替物;代替者;〈美國〉候補隊員(=su...
  • station : n 1 站,臺,車站;航空站,機場。2 派出所;署,局,所。3 【無線電】電臺,電視臺。 4 駐地,部戍地,...
  1. Through the analyze of dividing the sub - systems, interaction with environment, interaction with man and machine, a coarse - grained virtual prototype of space station has been assembled by the user model and the common model of vpm, it include environment system, dynamic system, time system, gnc system and power system. ( 3 ) the space environment model design

    通過對空間站虛擬樣機系統的子系統劃分、與環境的交互、人機的交互的分析,採用用戶模塊和vpm系統提供的通用模塊初步組裝出一個空間站的粗粒度虛擬樣機系統,包括空間環境、動力學系統、時間系統、 gnc系統、電力系統; ( 3 )空間環境模塊設計。
  2. The main station software functiona is complete, divide into six function modules which is parameters setup, remote collection, data enquiries, the line loss analysis, data maintenance and system management, each unction module contains some sub - function windows, achieved roundly monitoring in the power supply and power utilization system

    主站軟體功能齊全,分為參數設置、遠程採集、數據查詢、線損分析、數據維護、系統管理等六大功能模塊,每個功能模塊下面包含若干子功能窗口,全面實現供用電系統監測。
  3. The road between the diamond hill funeral parlour and the china light power electric sub - station

    (二)介乎鉆石山殯儀館與中電電力站的道路。
  4. The southern kerbside lane of northbound po kong village road opposite to china light power sub - station

    (二)中電電力站對面的蒲崗村道北行線;
  5. The road between the diamond hill funeral parlour and the china light power electric sub - station ; and

    (二)介乎鉆石山殯儀館與中電電力站的道路。
  6. In a word, this thesis not only expounds the whole structure of stability control of power system based on the theory of control decisions, but also designs software and hardware of sub - control - station, which are different from others. there are several advantages as listed below : 1 ) distributed hardware architecture function modularization realization of communication between modules by high - speed network communication technology ( can ) ( interconnecting 256 modules or mainframes ) flexible, convenient, reliable expansibility of hardware and decreasing system risk. any broken cell only affects local cell

    總之,論文不僅在控制策略理論的基礎上,闡釋了穩定控制系統的整體架構,而且研製設計出新穎的區域穩控子站裝置軟硬體,其優點體現在: 1 )分散式硬體結構體系功能模塊化採用高速網路通信技術( can )實現模塊間信息交換(最多支持256個模塊及機箱之間的互聯)硬體擴展靈活方便、可靠,降低系統風險,任一單元損壞隻影響局部2 )實時信息網(控制網)和管理網(監測網)分開。
  7. Power sub - station

    電力支站
  8. The southern kerbside lane of westbound po kong village road opposite to china light power sub - station

    (二)蒲崗村道西行的南面路旁中華電力分站對面;
  9. The southern kerbside lane of westbound po kong village road opposite to china and light power sub - station

    (二)蒲崗村道西行的南面路旁中華電力分站對面;
  10. The access road between the diamond hill funeral parlour and the china light power electric sub - station ; and

    (二)介乎鉆石山墳場與中華電力分站之間的通道;及
  11. The metered parking spaces between the diamond hill funeral parlour and the china light and power electric sub - station will be temporarily suspended on the above dates

    介乎鉆石山墳場與中華電力分站之間的所有咪表泊車位將暫時封閉。
  12. The metered parking spaces between the diamond hill funeral parlour and the china light power electric sub - station will be temporarily suspended on the specified dates

    介乎鉆石山墳場與中華電力分站之間的所有咪表泊車位將暫時封閉。
  13. The metered parking spaces between the diamond hill funeral parlour and the china light and power sub - station will be closed to all vehicles, except for those belonging to the two venues

    (二)除了鉆石山殯儀館和中華電力公司的車輛外,其他車輛不準進入介乎鉆石山殯儀館和中華電力分站的一段停車場;
  14. However up to date, the 3rd version rodos announced by the ec publicly has only its contained two sub - systems ( i. e. asy and csy ) considered by the general public as relatively mature technologies ; while the core esy is now being developed. from the perspectives of what our country absorbed version rodos 3. 0, rodos system structure is large, complex and of which source is simple and not very open, that restricted the popularity of application and are likely to be not very suitable for our country ' s nuclear power station operation

    但時至今,歐共體向世界公開的rodos第三版中,只有分析子系統( asy )和對策子系統( csy )較為成熟,而輔助決策的核心部分決策評估子系統( esy )還在開發中,從我國引進的rodos3 . 0版本來看, rodos系統結構龐大、復雜,且要求在hp機上運行,運行環境封閉,資源單一且很不開放,如allbase數據庫管理系統。
  15. The metered parking spaces on the unnamed road between the diamond hill funeral parlour and the china light power electric sub - station ; and

    介乎鉆石山殯儀館與中華電力變電站之間無名路的收費表泊車位及
  16. The access road between diamond hill funeral parlour and the china light power sub - station ; and

    介乎鉆石山殯儀館與中華電力變電站之間的通路及
  17. Four temporary taxi stands will be erected on both sides of po kong village road, two opposite to china light power sub - station and junction of fung shing street respectively ( westbound towards kwun tong ), and two near plk no. 1 wh cheung college and bus terminus respectively ( eastbound towards wong tai sin )

    (三)四個臨時的士站將設于蒲崗村道的兩側,兩個分別位於中華電力公司發電站與鳳翔街西行線往觀塘方向交界,和兩個位於保良局第一張永慶中學及巴士總站側。
分享友人