power water boiler 中文意思是什麼

power water boiler 解釋
動力水鍋爐
  • power : n 1 力,力量;能力;體力,精力;(生理)機能;〈常 pl 〉才能。2 勢力,權力,權限;威力;政權;權...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • boiler : n. 1. 煮器(壺、鍋等);熬煮東西的人。2. 汽鍋,鍋爐;〈美俚〉酒類干餾器。3. 〈俚語〉導彈。
  1. The main production includes heat - pipe, heat - pipe exchanger setting, rubber tyre hot water deaerate power station, boiler deaerator, tyre forming machine, rubber cutting machine, vulcanize, vulcanizing pot and the special carbon steel or stainless steel pot for oil, chemical engineering, medicine, chemical fertilizer field use

    濟南仙峰泰山化工設備有限公司主要生產熱管、熱管換熱器、橡膠輪胎廠子午胎斜交胎熱水除氧動力站、鍋爐除氧器、輪胎成型機、切膠機、硫化機、硫化罐,還有石油、化工、化肥、醫藥、冶金、建材等行業使用的各種碳鋼、不銹鋼、有色金屬的塔、罐、釜、換熱器等產品。
  2. The problem of modeling and control is a attention focus of people. the boiler water lever is importance index of industry boiler safety and satabilization. it is importance meanimg to ensure water level in definite range for increasing quality of steam and reducing wastage of equipment and insuring safety of whole hert - power - net at present, the mostly method is adopt the routine pid control

    鍋爐的建模與控制問題一直是人們關注的焦點,而汽包水位是工業鍋爐安全、穩定運行的重要指標,保證水位控制在給定范圍內,對于提高蒸汽品質、減少設備損耗和運行損耗、確保整個網路安全運行具有重要意義。
  3. With thermal spray technology, the surface of water wall tubes is easily covered by varied high performance coatings. in this paper, several new alloy and cermet coatings applied to water wall tubes were designed and their performance was studied according to the research item of hanchuan power station of hubei province " the study and development on the corrosion - resistant and wear - resistant coatings of water wall tubes in boiler "

    採用熱噴塗技術可以方便地在鍋爐管道表面獲得各種高性能的防腐耐磨塗層。本文結合湖北省漢川電廠的研究項目「鍋爐水冷壁管防腐耐磨塗層的開發研究」進行水冷壁管新型合金和金屬陶瓷復合塗層的設計和性能研究。
  4. The article takes a 600mw natural cycle drum boiler ( soot blow using steam ) as investigating object, establishes soot accumulation loss and soot blowing energy loss models for its water cooling wall, superheater, economizer and air preheater respectively, set up instructions for soot blower operating. simulating calculation results are compared with site data to verify usefulness of key models. the article introduced the operation optimizing design of soot blowers of yanzhou no2 power plant based on theoretical research

    本文以600mw汽包自然循環鍋爐(蒸汽吹灰)為具體分析對象,分別建立其水冷壁、過熱器、省煤器、空預器的積灰損失和各受熱面吹灰能量損失的模型,建立相應的吹灰器運行規則指導,對設計中的關鍵模型問題,通過模擬計算及與現場數據作比較的方法,驗證其可用程度。
  5. Four efficient ways of reforming hot - water boiler are introduced, the target of improving heat efficiency and saving energy power are achieved

    通過對熱水鍋爐實施綜合改造,可達到提高鍋爐熱效率和節約能源的目的。介紹了綜合改造的四個有效途徑。
  6. Abstract : four efficient ways of reforming hot - water boiler are introduced, the target of improving heat efficiency and saving energy power are achieved

    文摘:通過對熱水鍋爐實施綜合改造,可達到提高鍋爐熱效率和節約能源的目的。介紹了綜合改造的四個有效途徑。
  7. Project assessment, feasibility analysis, designing, installation, commissioning of auxiliary control system in power plant, include ash & slag system, coal conveying system, water treatment system, oil conveying system, auxiliary boiler etc

    電廠輔助控制系統(灰渣、輸煤、化學水處理、燃油、輔助鍋爐等)的項目評估,工程造價、設計、安裝、調試。
  8. Low power water boiler

    低功率水鍋爐堆
  9. Abstract : the design method of thinking of small scada system in a systematic way is studied. it based on the design and develop of “ the power plant boiler water scada system ”. it also puts out some points that should be pay attention to during developing small scada system

    文摘:通過「火電廠鍋爐爐水監控系統」的設計與研製,系統地研究了小型監控系統的設計思想和方法,並指出了小型監控系統研製過程中應注意的問題。
  10. The water wall tubes were leaked by the high temperature corrosions, which put the boiler units shut down and made the safety and economy operation of the power plants effected severely, which also made the safety generation and dispatch of the all power network effected severely

    鍋爐水冷壁高溫腐蝕造成水冷壁管爆漏,迫使鍋爐停機,嚴重影響了電廠運行的安全性和經濟性,對整個電網的安全生產和調度也造成了嚴重的後果。
  11. Concentric jacket pipe surrounded the test condenser. steam was generated in the boiler, flowed upward to the inlet of connection pipes, then flowed downward into the condenser tube, the cooling water flowed countercurrently through the annulus. the experiment covered the range of the pressure 1. 0 ~ 3. 0bar, heating power 2. 0 ~ 15. 0kw, steam mass flow rate 0. 001 ~ 0. 004kg / s, air mass flow rate 0. 0 ~ 0. 00163kg / s, and cooling water temperature 20 - 60 ?

    在系統壓力為0 . 1 0 . 3mpa ,加熱功率為2 15kw ,蒸汽質量流量為0 . 001 0 . 004kg s ,空氣質量流量為0 . 0 0 . 00163kg s ,二次側冷卻水溫度20 60的范圍內,系統研究了豎直下降管內含有空氣的蒸汽冷凝特性,獲得了不同壓力、不同空氣含量和不同加熱功率下,冷凝段的溫度分佈和局部熱流密度的數據。
  12. A large deviationoccurred when measuring water level on the left and right sides of unit 3 boiler drum inzhujiang power plant, which seriously impacted the safety of heating equipment

    珠江電廠3號機鍋爐汽包左右側水位測量偏差大,嚴重影響了熱力設備的安全運行。
  13. There are many plants that have the character of time - varying, large delay, large inertia in the process of production of modern power station such as the superheated steam temperature, the reheated steam temperature, the water treatment of boiler and the load regulation. some of them have the strong character of nonlinear and some of them are multivariable coupling systems it is very difficult to obtain good effect of control by conventional pid control. it is necessary to set up the mathematics models of controlled plants if applying control means of modern control theory such as self - adaptive control, optimal control , decoupling control and predictive control. and these control systems have large calculation and bad character of real time in general. these disadvantages make them be not able to meet the need of real production process and limit the application of them in modern power station. now the generator units are developing towards large capacity and high parameters. many new kinds of generating electricity means are coming into being. the characers of production units of power station become more and more complex but the demand to quality of control becomes more and more strict. the new control means are in bad need to control them effectively

    現代電站的生產過程中存在過熱汽溫、再熱汽溫、鍋爐水處理、負荷調節等許多大遲延、大滯后、特性時變的對象,它們中有些還是具有強非線性特性的對象或多變量耦合系統,採用常規的pid控制手段很難取得良好的控制效果。若應用現代控制理論中的自適應控制、最優控制、解耦控制、預測控制等控制手段,則需要建立被控對象的數學模型,而且往往控制系統的計算量大、實時性差。這些缺點使其很難滿足實際生產過程的需要從而極大地限制了其在現代電站中的應用。
  14. Electrically heated hot water high - pressure cleaner with k ? rcher power nozzle. triple - chamber boiler system. continuous running - resistant long - life pump with three stainless steel pistons. facility for integrated storage of spray lance

    電加熱冷、熱水高壓清洗機。三箱鍋爐加熱系統,非常友好的操做界面,底盤集成油箱,高壓管及附件存儲槽。
  15. The reason of the high temperature corrosion of water wall of no. 1 boiler of weifang power plant is the coal problem and separated of primary and secondary air

    濰坊電廠造成# 1爐高溫腐蝕的原因主要是煤質問題、煤粉顆粒粗及一、二次風分離。
  16. In the industry of thermal power plants, boiler tubes, especially water wall tubes in enginery of over 300mw, water wall tubes are easily corroded in high temperature and wore by dust when the coal with high content sulphur is used, which made water wall tubes become thin and burst

    在火力發電行業中,燃煤鍋爐管特別是300mw及以上機組的水冷壁管在燃用高硫含量煤時,易受到嚴重的高溫腐蝕和飛灰的磨損,使管壁減薄導致爆管事故。
  17. The paper is committed to the research on the application of fault diagnosis and fault tolerant control in the modern power plant. the new schemes of fault diagnosis both for boiler water level control system and unit coordinated control system are presented ; moreover, based on the lqg strategy, a scheme of fault tolerant control for unit coordinated control system is also proposed

    電廠熱工控制系統的安全運行已經成為人們日益重視的課題,在這種背景下,本文致力於故障診斷與容錯控制在電廠熱工控制系統中的應用研究。主要內容是針對電廠鍋爐汽包水位控制系統和電廠單元機組協調控制系統提出兩種故障診斷的新方案;並且把lqg控制策略應用於單元機組協調控制系統,提出了協調控制系統的主動容錯控制方案。
  18. The neural network - fuzzy control based on clustering analyse is applied to the water level control of boiler in power plant. it can be seen from the simulation that the control quality is high and robustness is strongo

    將基於聚類分析的神經網路?模糊控制器應用於火電廠鍋爐水位串級控制系統進行模擬研究,實驗表明該演算法確定的控制系統控製品質較高,魯棒性強。
  19. At present the phenomenon that high temperature corrosion of water wall and gas temperature deviation of shandong power plant is ubiquity. it brings the great harm to safety and economical operation of boiler

    目前,山東省大機組普遍存在著爐膛出口煙溫偏差和水冷壁煙側高溫腐蝕現象,給鍋爐的安全、經濟運行帶來很大危害。
  20. Industrial boiler and power plant : transfer of coal water slurry

    工業鍋爐、電廠:水煤漿的輸送。
分享友人