pre-scheduling 中文意思是什麼

pre-scheduling 解釋
預排船期
  1. Crossbar scheduling algorithm based on pre - matched islip

    基於匹配預測的交換調度演算法
  2. Polyester brushed tricot, it interweave with 100 % polyester chemical fiber, with pre - finished, dyeing and finishing, scheduling, drawing by hair, finished product finalizing technics.

    本產品系全滌化纖原料交織,經前處理、染整、預定、拉毛、成品定型等工藝。
  3. Theoretical proof and simulation suggests that this constructive function has stronger heuristic power, and has better effectiveness for scheduling dag a task - replication based heuristic static scheduling algorithm is also proposed ( namely processor pre - allocation algorithm for dag tasks, ppa ), utilizing the aforementioned heuristic function aimed at rtrpmt

    通過理論證明與模擬實驗表明:本文構造的啟發函數具有較強的啟發能力,對dag圖的調度具有較優的效果。利用本文所構造的啟發函數,針對相關周期性多任務,提出了一種基於任務復制的啟發式靜態調度演算法( dag任務圖的處理器預分配演算法ppa ) 。
  4. This form of pre - emptive scheduling may be used when a job execution must be interrupted because a higher - priority job needs to run on the resource

    當任務執行由於更高優先級的任務需要使用資源來運行而必須被中斷時,就可以使用這種形式的搶占式調度。
分享友人