pressure water pipe 中文意思是什麼

pressure water pipe 解釋
壓力水管
  • pressure : n 1 壓;按;擠;榨。2 【物理學】壓力,壓強;大氣壓力;電壓。3 精神壓力,政治[經濟、輿論等]壓力。4...
  • water : n 1 水;雨水;露;〈常作 pl 〉 礦泉,溫泉;藥水。2 〈常 pl 〉水體;水域;水道;海;湖;河;海域;...
  • pipe : n 1 管,導管,筒。2 煙斗,煙袋;一袋煙。3 〈古語〉笛,管樂器;【航海】(水手長的)哨子(聲);〈p...
  1. Air pressure forces the water through the pipe

    空氣壓力使水通過管道
  2. Inside engine room frame # 14 # 16 portside, starboard side there is sea chest at each side, they are connected by main sea pipe, the sea water pump of main engine, auxiliary engine, general bilge pump, ballast pump, firefighting pump, condensator cooling water pump, and sea water pressure tank can suck sea water from them

    機艙內# 14 # 16左、右舷設有海水閥箱各一個,用海水總管相連,可供主機、輔柴油機的海水泵、艙底總用泵、壓載泵、消防泵、冷凝機組冷卻水泵及海水壓力水櫃吸水。
  3. Once the water reaches its maximum speed, the valve slams shut and pressure is built up in the pump. this pressure forces open a second valve linked to the delivery pipe. when nullah water falls past the hydraulic ram, its momentum will lift a tenth of the water to a storage tank located near the esther li building photo 2

    泵內有活門,當溪水在流動中受阻,會產生比正常壓力高十倍以上的瞬時水錘壓力,此時,泵內的另一活門會打開,把十分之一的溪水抽往設于李慧珍附近的儲水缸備用(圖二) 。
  4. Experiment on the pressure drop of crude oil - water pipe flow

    水管流壓降規律實驗
  5. Pipe bundle cleaning by high pressure water jet

    管束的高壓水射流清洗
  6. The product adopts the infalling through system on the structure of boiler pipe line, if equips safely valve an will stop working automatically in case hyperthermal, super - pressure and low water lever

    安全採用水管貫流式爐膽結構,並配備安全閥,溫度過熱,水位過低,壓力過高等四重保護,絕對安全可靠。
  7. ( 4 ) through the hydraulic property experiment of micro - hole lateral pipes of simple sdi in air, it was found that the average pressure of 60 mitre length lateral pipes was at the position of per 40o / o ~ ~ ~ 50 % of the effectual pipe length from the fist micro - hole, major pressure - loss was occurred at the ahead part of half pipe. the pressure uniformity reduced with orifice aperture ? increasing, and the relationship between pressure uniformity and initial water pressure was poor. running under the initial water pressure of 1. 5 meter, the discharge uniformity reduced with orifice aperture ? increasing, and when the orifice aperture smaller than or equal 1. 0mm, irrigation uniformity could achieve above 0. 6

    ( 3 )通過對空氣介質中簡易地下滴灌的微孔毛管試驗研究發現: 60m管長的毛管平均壓力水頭的位置基本上在距第一孔口的有效管長40 - 45的地方;大部分水頭損失發生在毛管的前半部分;壓力均勻度隨孔徑的增大而減小,但與初始工作水頭關系不密切;在1 . 5m以下的工作壓力下運行,沿程出流均勻度隨孔徑的增大而降低,當孔徑不大於1 . 0mm時,灌水均勻度可以達到60以上;當孔徑大於等於1 . 2mm時,灌水均勻度低於50 。
  8. Probes into the pressure regulating range of the water replenishing and pressure fixing system on the by - pass pipe

    旁通管補水定壓系統調壓幅度確定方法的探討
  9. The paper analyzes the non - lineal relations of the quantity of heat exchange and water flux of coil exchanger in part - load operating condition, the shortage of deciding the water flux in bypass pipe, the disadvantage that the operating condition of pumps and chiller ca n ' t be met with the load change of the air conditioning system in different operating condition of using pressure - difference bypassing control in primary water pump system. using load control method in the change of the operating condition of primary water pump system can realize that the load change is small and reasonable in the on / off condition of pumps and m m chiller by comparing load control method in primary variable - flow water pump system with pressure - difference bypassing control method, back water temperature control method

    本論文從目前空調工程中使用的變流量水系統入手,研究了盤管換熱器在部分負荷下水流量與換熱量的非線性關系,分析了文獻中介紹的旁通管通流能力選擇的不足之處和一次泵水系統採用壓差旁通控制時,工況轉換不能滿足系統控制要求的缺陷;比較了一次泵變流量水系統中壓差旁通控製法、回水溫度控製法、負荷控製法的精確性,並得出了在一次泵水系統的工況轉換時,採用負荷控製法能使冷水機組及其相應水泵在啟停時的負荷變化范圍較小,更符合建築物的冷量需求,節能效果較好的結論。
  10. For the purpose of solving the interconnection of the heating supply between the small high - rising building and multi - storied building, this paper advances that the pressure fixing system on the by - pass pipe should be used in the secondary network system, and probes into the pressure regulating range of the water replenishing and pressure fixing system on the by - pass pipe

    為了解決小高層和多層建築的供熱並網問題,提出了將旁通管定壓系統應用於二次網系統中,並對旁通管補水定壓系統調壓幅度進行了探討。
  11. By this way, however, the working pressure of the fire water system will be at higher level in case of the central stabilizing high pressure system and undesirable consequences related to the pressure - acceptance of the pipe and the joints shall come forth

    而在集中穩高壓給水系統中,這樣確定的穩壓泵揚程及設定壓力值,往往使消防給水管網始終處于較高壓力工況,因而使管網內水壓與管道及其介面的承壓能力這一對矛盾趨于突出。
  12. Plastic equipment for water saving irrigation - pressure compensating emitter and emitting pipe

    塑料節水灌溉器材壓力補償式滴頭及滴灌管
  13. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  14. To the steam generator a heat exchanger, which converts the feed water in the secondary circuit to high - pressure steam at about 67 bar or 6 700 kpa and deliver it to the " conventional island " via steam pipe for driving the turbine and generator

    內的高壓水帶到蒸汽發生器即熱交換器,蒸汽發生器會將二迴路給水轉化為約67巴或6 700千帕的高壓蒸汽,再經過蒸氣管送到常規島,以推動渦輪發電機。
  15. To the steam generator ( a heat exchanger ), which converts the feed water in the secondary circuit to high - pressure steam at about 67 bar ( or 6 700 kpa ) and deliver it to the " conventional island " via steam pipe for driving the turbine and generator

    內的高壓水帶到蒸汽發生器(即熱交換器) ,蒸汽發生器會將二迴路給水轉化為約67巴(或6700千帕)的高壓蒸汽,再經過蒸氣管送到常規島,以推動渦輪發電機。
  16. Aiming at the present low efficiency of well irrigation works and through pumping tests and theoretical analysis, the paper derives a method for calculating the optimum water yield, the best lifting distance and economic pipe diameter of low pressure pipe delivery system of irrigated area by wells, increasing the efficiency of motor - pumped wells

    針對目前井灌工程效率低下的問題,通過抽水試驗,經過理論分析,推導出了井灌低壓管道輸水灌溉系統的最優出水量、最佳揚程和經濟管徑計算方法,從而可提高機井灌溉效率。
  17. For example, the condenser algorithm considered the trouble condition such as the leak of tube, fail of seal in vacuum system, the lower shaft sea - ting steam pressure, pollute of tube, the high water level of hot - well. the heater algorithm considered the trouble condition such as the leak, pollute of feed - water pipe and high water level of heater

    如凝汽器演算法考慮了銅管泄漏、真空系統密封不嚴、軸封蒸汽壓力低、銅管結垢污染、熱井水位過高等故障項目,加熱器演算法考慮了給水管道泄漏、給水管道污染、結垢、加熱器水位過高等故障項目。
  18. The ascertainment of surges in surge tank and waterhammer pressure in pipe systems is the key point of the design of surge tanks and the safe function of the water power station

    調壓室中的水位波動以及壓力管道水擊壓強的確定對調壓系統的正確設計和確保電站調壓系統的正常運行至關重要。
  19. Technical requirements of plain concrete pipe for low pressure water conveyance in irrigation system

    灌溉用低壓輸水混凝土管.技術條件
  20. This article links to the plant no. 6 project, studying the measure of pressure reduction and energy removal of large caliber and long distance water delivery pipe in big difference of elevation and topographical form area. the writer gives new measure of pressure reduction and energy removal, according to the theory of pressure reduction and energy removal, planning a composite energy removal construction, and put to use effectively in many water supply projects. it is the first example that people use concrete construction to remove high pressure in large caliber and long distance water pipe in china

    本文結合西寧市第六水源工程,對高差大、地形地貌復雜地區大口徑長距離輸水管道消能減壓措施進行了研究探討,提出了全新的減壓消能方案,根據減壓消能原理,自行設計出了綜合式消能構築物,並應用於多項輸水工程中,效果良好,成為國內首例採用鋼筋混凝土構築物消除大口徑長距離輸水管道較高壓力的案例。
分享友人