primary device 中文意思是什麼

primary device 解釋
一次裝置
  • primary : adj 1 第一的,最初的,初級的;初等的;基本的;基層的。2 主要的,為首的,第一位的。3 原始的,根本...
  • device : n. 1. 設計,計劃;方法,手段。2. 〈pl. 〉意志,慾望。3. 謀略,策略,詭計。4. 器具,器械,設備,裝置。5. 圖案,圖樣;花樣;紋章;標記,商標;(紋章上的)題銘。
  1. The corinthian painter's primary ornamental device was the animal frieze.

    科林斯畫家最初的裝飾圖案是動物形象的裝飾帶。
  2. " bor " the series product, uses now the international leading technology, american, german, the japanese import name brand electron primary device, the raw material production manufacture, at present has several series, 100 many kinds of specifications, the variety complete standardization series product, as well as the large - scale non - sign using plc, touches the screen and the labor controls the completely automatic ultrasonic wave clearer, the ultrasonic wave plastic welding apparatus which the computer control screen demonstrated, industry cold water machine, the commercially pure hydraulic engine and so on the non - sign equipment

    「博爾」系列產品,採用當今國際領先技術,美國德國日本進口名牌電子元器件原材料生產製造,目前有十幾個系列一百多種規格品種全的標準化系列產品,以及大型非標運用plc觸摸屏及工控電腦控制屏幕顯示的全自動超聲波清洗機超聲波塑料焊接機工業冷水機工業純水機等非標設備。
  3. Two kinds of improved design project are proposed : retrofocus project and image telecentric project. original structures are solved through gauss optics and primary aberration principle, and the aberration is optimized and analyzed too. to form staring opto - electronic countermeasure device, distributing of optical unit array is simply analyzed in the end

    針對初始設計方案的不足,提出兩種改進的設計方案:反遠距方案和像方遠心方案,通過高斯光學和初級像差理論求解出光學系統初始結構,利用光學設計軟體進行像差分析和優化,並且對設計的光學系統組成凝視型光電對抗設備時光學單元陣列分佈進行了簡單分析。
  4. Also analyzed are the problems which possibly occur during the design, assembly and alignment, and the relevant resolution method is given. the co - alignment device of the c02 and ld lasers is designed, and co - alignment adjustment technique is brought forward in this dissertation. and the system of infrared primary alignment is also designed

    探討了儀器的整體設計、裝配與調試等各個過程中遇到的問題與解決方法,進行了可見紅外共光路的設計,提出了共光路調整技術並設計了紅外干涉的初調系統,效果良好。
  5. Mainly by using the historically comparative experience method, and in view of chinese linguistics and certain relevant theories like bruners structuralism and modern cognitive theories, and yet on the basis of elaborating on discipline structure of teaching chinese literacy in the primary school and the characteristics of child ' s cognitive development, this thesis reflects upon the practice of teaching chinese literacy in china ' s primary school and emphasizes the importance of good resolutions of the following issues : the relation between chinese literacy teaching and chinese teaching system ; the stages of chinese literacy acquisition and the multiplicity of the approaches to such acquisition ; the issue of chinese phonetic alphabet as the instrument of chinese literacy acquisition or as its goal ; major device and auxiliary devices for the development of chinese literacy, etc. and finally by addressing the essential frameworks of the new curriculum standards, the ultimate aim of chinese literacy teaching as well as the striving direction for china ' s chinese teaching reform is defined as " teaching aims at self - teaching "

    在對我國小學語文識字教學歷史經驗進行回顧的基礎上,分析其中的合理性與局限性,找出問題的癥結所在,探索如何將漢字構字規律與學生的認知規律有機結合起來,提高識字教學水平,是本文的主要研究目的。本研究主要運用歷史經驗比較法,借鑒漢語言文字學、布魯納的結構主義和現代認知心理學的有關理論,在論述我國小學語文識字教學的學科結構和兒童的認知特點的基礎上,反思我國小學語文漢字教學的實踐,提出識字教學必須處理好幾對矛盾:識字教學與小學語文教學體系、識字的階段性與識字方法的多樣性、拼音是識字教學的手段還是目的、識字的主要方法與次要方法等,結合新課程標準的基本精神,提出「教是為了不教」是識字教學的最終目標,也是我國小學語文教學改革的努力方向。
  6. And it investigates the appearance condition ( including joint, crack, eroding, corrosion, braking pole device rupture, crane - girder ' s gnawing railway and so on ) of the whole crane - girder system on the spot, at the same time, it also actually examines the stress of the beam, chemical ingredient, distortion and railway excursion, etc. through sampling, and based on the actually examined results, it checks and calculates the carrying capacity of crane - girder system. then, based on the investigating on the spot and the calculated result, it discusses the mechanism of fatigue failure of the upper part of welded steel crane - girder, analyses the reason of steel crane - girder in the high - frequency emerging the fatigue crack, institutes the strengthened method of damaged steel crane - girder of accurate packing up workshop of the primary mill plant. finally, it presents some advice and suggestions for the repairing and strengthening method of fatigue crack of upper part of steel crane - girder in the high - frequency

    針對包鋼初軋廠精整車間鋼吊車樑上部區域出現裂縫這一問題,本文首先綜述了國內外關于焊接鋼吊車樑上部區域疲勞裂縫的研究現狀;其次對整個吊車梁系統的外觀情況(包括連接、裂縫、腐蝕、銹蝕、制動桿件斷裂、吊車啃軌等)進行了現場調查,抽樣實測了梁的應力、化學成分、變形及軌道偏移等,根據實測結果,對吊車梁系統的承載能力進行了驗算;然後,根據現場調查及計算結果,探討了焊接鋼吊車樑上部區域疲勞破壞的機理,分析了重級工作制鋼吊車梁出現疲勞裂縫的原因,制定了初軋廠精整車間破損鋼吊車梁的加固方案;最後就重級工作制鋼吊車樑上部區域出現疲勞裂縫的修復與加固方案提出了一些意見和建議。
  7. The magneto is the primary device to supply the power for the motorcycle

    磁電機是摩托車最主要的電源裝置。
  8. Filament winding machine is the key device which uses continuous fibre reinforced plastics to wind produce, its primary function is through which continuous fibre ( such as glass, aramid, carbon fibres and wire ) or fabric is wound on the mandrel surface on which produce is shaped according to needed pattern laws by special mechanical moves and controls

    纖維纏繞機是用連續纖維增強塑料來纏繞製品的關鍵設備,其首要功能是通過特定的機械運動和控制,將浸漬過樹脂膠液的連續纖維帶(如玻璃纖維、碳纖維、芳綸纖維、金屬絲等)或布帶,按照所要求的線型規律排布在制品成型的芯模表面上。
  9. This paper founds mathematical model of twin - floater ocean wave generate electricity device, and analyzes primary parameters on the base of mathematical model for searching the optimal solution during designing this electricity device. it presents the method calculating the ocean wave forces on the several ideal floaters such as cube, vertical cylinder, horizontal cylinder, sphere by the theory that froude - krylow presupposition calculates a big diving body

    在研究浮子幾何形狀與浮子所受波浪力的關系的過程中,本文利用弗汝德-克雷洛夫假定法計算大尺度潛體上的波浪力的思想理論來推導作用在幾種常見理想浮體:長方體、垂直圓柱體、水平圓柱體和球體上的垂直波浪力。
  10. This system is based on the programmable controller and dh + network ( data high way plus network ), and it can supervise and control the whole flow of the seawater injection. as the primary device in the system, programmable controller implement the flex logic control for the flow and can collect the data in the flow to establish the control center

    該系統基於可編程式控制制器及dh +網路,實現了對注海水全流程(海水提升、海水粗濾、海水加藥、海水沉降、海水細濾、海水脫氧、氣水分離、注水罐、注水泵)的實時監控。
  11. Our primary user interface component, which in turn displays the results on the device, as shown in listing 15

    (我們的主用戶界面組件)上,它會在設備上顯示這個結果,如清單15所示。
  12. These results show that since the existent defects of combustion device structure and its hypothetical circle of contact, these make a poor primary and secondary wind rigidity in operation and a too big actual circle of contact. in addition, the coal used is extreme prone to burn and reside in boiler. under such a condition, the coal powder ignites earlier in a short time and short distance when it leave the jet - combustioning device, and splashes the water cooler, eventually this results in a burned coal residue in boiler

    針對宏偉熱電廠410t / h燃煤鍋爐嚴重結渣問題,對燃煤的結渣性、爐內溫度工況及空氣動力工況等進行實驗研究,由於燃燒器結構和假想切圓選擇的缺陷,使得鍋爐在正常運行時,一、二次風剛性較差,實際切圓過大,加上目前燃用煤質屬于極易燃、易結渣煤質,致使煤粉在離開噴燃器很短的時間、較短的距離內開始著火,並沖刷水冷壁,最終造成爐膛結渣。
  13. Band knife cutting machine is a primary device equipment in garment and knitting etc industries. it could accurately cut the pattern offabrics

    帶狀式裁剪機是各制衣、針織等行業的主要裁剪設備,可精確地裁剪彎曲度大的裁片。
  14. The first - order perturbation method correct for forcing decoupling method based on perturbation theory is put forward to decrease error ; iii. the complex modal method is introduced into analysis of non - classical damping systems to eliminate error of forcing decoupling method, and improve the complex modal response spectrum, which can apply to design of non - classical damping systems ; iv. for exerting the energy dissipation capability of each device, a two - step optimum method, whose controlling function is extremum expectation of interbedded displacement, is put forward to optimize the number and position of device ; v. the problem of iterative method applied to analyze energy dissipation systems is indicate, and give some primary advice based on pilot study

    為改善上述缺點,本文進行了以下的研究工作:在忽略耗能器附加質量的基礎上,推導出適用於耗能減震結構的攝動法,減少振型分解法在迭代計算過程中的工作量,加快計算速度;針對運動方程的強行解耦所產生的誤差,根據攝動法原理,對其進行一階攝動修正;為消除強行解耦振型分解法用於非比例阻尼結構分析時產生的誤差,引入狀態空間對系統進行復模態分析,並改進了基於復模態理論的、適用於非比例阻尼結構設計的雙反應譜方法;對于耗能器的數量和位置優化進行了一些探討和研究。
  15. Social insurance device establishs a lifelong and changeless individual account each to join the worker of primary endowment insurance

    社會保險機構為參加基本養老保險的職工每人建立一個終身不變的個人帳戶。
  16. Enterprise and worker owe capture, delay pay cost of primary endowment insurance, stop to still did not fill to the end of the current year capture, social insurance device is when circumstance of cost of settle accounts pay, should owe the capital that primary endowment insurance expends capture, delay capture and interest by formulary account

    企業和職工欠繳、緩繳基本養老保險費,至本年底止仍未補繳,社會保險機構在結算繳費情況時,應按規定記載欠繳、緩繳基本養老保險費的本金和利息。
  17. Calibration factor of the primary device

    一次裝置的校準系數
  18. Company take electronic technology software and hardware development and production primarily, by electronic primary device everywhere trades as auxiliary, the two complement one another, argues vigorously provides the highest quality most perfect most advanced product service for the enterprise

    公司以電子技術軟硬體的開發與生產為主,以電子元器件的海內外貿易為輔,二者相輔相成,力爭為企業提供最優質最完善最先進的產品服務。
  19. Energy performance contracting, the low risk and high benefit service manner can realize technology service and energy conservation share by retrofitting the primary device in technology and at last it can get energy caving and economic benefits

    通過合同能源管理這種低風險高效益的服務形式,對原有設備進行技術改造,實現技術服務和節能分享,從而獲得節電效益和經濟效益。
  20. Uses imports the microprocessor for the control core and the many kinds of high qualities import primary device

    採用進口微處理器為控制核心和多種高品質進口元器件。
分享友人