primary treatment of sewage 中文意思是什麼

primary treatment of sewage 解釋
污水初級處理
  • primary : adj 1 第一的,最初的,初級的;初等的;基本的;基層的。2 主要的,為首的,第一位的。3 原始的,根本...
  • treatment : n 待遇;作業;處理,處置;討論,論述;【醫學】治療,療法;(種子的)消毒(處理)。 preferential t...
  • of : OF =Old French 古法語。
  • sewage : n. 1. 陰溝污物;污水。2. 下水道。vt. 1. 用污水灌溉[作肥料]。2. 裝設下水道于(某地)。
  1. So far, 24 kilometres of large tunnels under the central urban area and a sewage treatment works at stonecutters island, providing chemically enhanced primary treatment for up to 3. 5 million cubic metres of flow per day, have been commissioned

    到目前為止,市區中心地帶已建成24公里長的大型污水隧道,而設于昂船洲的污水處理廠亦已啟用。該污水處理廠採用化學輔助一級污水處理方法,平均每日處理的污水流量多達170萬立方米。
  2. Abstract : the applications of chemically enhanced primary treatment process at home and abroad were reviewed. the experiments of urban sewage treatment by activated sludge process and cept - activated sludge combination process were presented. and the further research fields about cept were proposed

    文摘:論述了城市污水化學強化一級處理法在國內外的運用成果,結合小試結果,比較單純生物處理及化學強化一級處理與生物處理聯合的區別,並提出了cept工藝研究的發展方向。
  3. Stage 1 of hats, which was brought into full operation in late 2001, included the construction of a chemically enhanced primary sewage treatment works on stonecutters island

    凈化海港計劃第一期工程已經於2001年底全面投入運作,包括于昂船洲建造一個化學強化一級的污水處理廠。
  4. After the completion of stage 1 in 2001, which involved the construction of deep underground tunnels to transport the sewage generated from kowloon and the northeastern part of hong kong island to a chemically enhanced primary sewage treatment plant at stonecutters island, the government is considering proceeding to a two - phased hats stage 2

    第一期工程包括修建地下管道,將九和港島東北部產生的污水,運到昂船洲的化學加強初級污水處理廠,有關已於2001年1月完成。如今政府正考慮分兩階段推行凈化海港計劃第2期。
  5. A major deep tunnel collector system and treatment works were designed to handle sewage generated from all districts around the victoria harbour area. so far, 24 kilometres of large tunnels under the central urban area and a sewage treatment works at stonecutters island, providing chemically enhanced primary treatment for up to 3. 5 million cubic metres of flow per day, have been commissioned

    政府根據污水處理策略設計了一個大型的深層污水隧道收集系統和污水處理廠,處理維港范圍附近各區所產生的污水。到目前為止,市區中心地帶已建成24公里長的大型污水隧道,而設于昂船洲的污水處理廠亦已?用。
分享友人