priority section 中文意思是什麼

priority section 解釋
優先節
  • priority : n. 1. (時間、順序上的)先,前。2. 較重要;上席;上位;重點,優先(權);先取權。3. 優先配給;優先考慮的事。
  • section : n 1 (外科、解剖的)切斷;切割;切開。2 【外科】切片,【金相】磨石。3 (果子的)瓣。4 【數學】截...
  1. The thesis consists of four sections. in section one, we introduce some background of the topic, in section two we review some basic and recent results about the structure and hierarchies of the computably enumerable degrees which are closely related to our topic - the algebraic structure of the plus cupping turing degrees, in section three, we outline the basic principles of the priority tree argument, one of the main frameworks and tools of theorem proving in computability theory, and in section four, we prove a new result concerning the algebraic structure of the plus cupping turing degrees that there exist two computably enumerable degrees a, b such that a, b ? pc, and the join a v b of a and b is high

    本篇論文分為4個部分:第一部分介紹了這個領域的一些背景知識;第二部分主要回顧了前人在研究可計算枚舉度的結構和層譜時所取得的一些基本和最新結果,這些結果與我們的主題?加杯圖靈度的代數結構密切相關;在第三部分中,我們概要的描述了優先樹方法的基本原理,此方法是可計算性理論中定理證明的一個重要框架和工具;第四部分證明了一個加杯圖靈度代數結構的新結果:存在兩個可計算枚舉度a , b ,滿足a , b pc ,而且a和b的並a b是一個高度。
  2. It is proposed that the lrt system will adopt a standard rail gauge, power supply by overhead wires, main low - floor vehicles in six axes, one or two cars in one train set during the initial stage of revenue service, two or three cars in one train set in the later stage, 90m platform length, certificate payment system, type - b right - of - way on at - grade section, and signalling control for priority passing at intersections, etc

    建議採用之輕軌系統為標準軌距,架空線供電之大部分低底板輕軌車輛,每列車以二輛編組營運,月臺設計長度為60公尺,以付費證明系統收費,平面段采b型路權,交叉路口以交通號志管制,給予優先通行權。二線合計之建設成本,以89年幣值估算,約需新臺幣131億元。
  3. In the integrated scheduling service, hard periodic tasks are scheduled off - line to meet their real - time requirements, and each soft aperiodic task request is assigned a suitable deadline to enhance the aperiodic responsiveness. scheduling guarantees of hard periodic tasks are preserved through the on - line schedulability analysis. the sharing of critical section resources between the tasks is also considered in the integrated scheduling service ' s schedulability analysis, and bounded blocking for accessing the critical section resource is achieved by introducing the priority ceiling protocol

    在該模型中,對硬實時周期性任務集進行離線調度以滿足其可調度性保證:給動態到達的軟實時非周期性任務分配一個截止期,提高其響應性能,同時通過在線可調度性分析保證周期性任務的可調度性不受影響;集成調度服務模型在可調度性分析中還考慮了任務之間共享臨界區資源的情況,採用優先級上限協議對訪問臨界區引起的阻塞進行了定界分析。
  4. As marginal benefit equals marginal cost, the priority and key section for financial input can be decided

    根據邊際收益等於邊際成本的原則,可以得出財政各投入部分的優先順序及重點投入領域。
  5. Fabrication of the box beam is divided into such parts as reinforcement, formwork, concreting, prestressing, moving and storing of beam, pipe grouting under pressure, end sealing of the beam, water - proof layer on the bridge surface system, protective coating etc. the paper makes description of effective box beam construction technology and workmanship which can be adopted in other projects, such technologies as : manufacturing and fixing of reinforcement, steel reinforcement fixing baseplate, web plate and top plate respectively and lifting the steel skeleton into form, requirements of design and manufacturing and way of utilization for dismantling - erection type formwork and hydraulic formwork, optimization of concrete ratio, concrete pouring process of two ends of beam in priority over the middle, in sequence of first baseplate followed by web plate and top plate at last, concrete pouring in inclined section and in horizontal layer, concrete vibration mainly by external vibrator in assistance with internal vibrator, methods and regulation for steam curing of concrete, dual controls over stress and strain to ensure quality of prestressing workmanship, construction method of effective beam moving by heavy - weight special moving facility, some regulations and key notes about construction of grouting under pressure, beam ends sealing, water - proof layer on the bridge surface system, protective coating

    箱梁製造由鋼筋工程、模板工程、混凝土工程、預應力工程、移存梁工程、孔道壓漿工程、梁體封端工程、橋面防水層和保護層工程等施工環節組成。文中介紹的採用胎具製作和綁扎鋼筋,分底腹板和頂板分別綁扎並吊裝鋼筋骨架入模;拆裝式和液壓式兩種模板的設計、製作要求和使用方法;綜合考慮、優化混凝土配合比,混凝土灌注從兩端至中間、先底板、后腹板、再頂板的施工順序和斜向分段、腹板水平分層、附著式振搗為主、插入式搗固為輔的施工工藝,蒸汽養護的方法和規定;應力應變雙控制確保預應力施工質量的施工技術;採用重物移運器有效移梁的施工方法;壓漿、封端、橋面防水層和保護層施工的一些規定和注意事項等都是對箱梁製造行之有效的施工技術和施工方法,並可為以後類似施工作借鑒。
  6. Where the employing unit is to recruit personnel six months after the personnel reduction effected according to the stipulations of this section, the reduced personnel shall have the priority to be re - employed

    用人單位依據本條規定裁減人員,在六個月內錄用的,應當優先錄用被裁減的人員。
  7. Swc priority 2 - route 10 north lantau - yuen long highway ( r10 nlylh ) 5. 4 the northern section of r10 nlylh is required to follow on urgently after the dbl to relieve route 3 cps and tuen mun road

    4繼后海灣干線后,必須盡快完成的工程項目,就是十號干線(北大嶼山至元朗公路)北段,以疏導三號干線(郊野公園段)及屯門公路的交通。
  8. To find a solution to these problems, starting with understanding of road function, this thesis grades road style with new standard, classifies priority of traffic volumes on different type of roads. this thesis also studies and analyzes the elements of cross - section, affords suggestion about each special contents and ideal road standard cross - section which match to practice. by these methods, it can increase the efficiency of road network, improve traffic environment and improve efficiency and service lever of traffic facilities

    針對這些問題,從科學發展觀出發,對橫斷面設計理論分析,從理清道路功能入手,對道路等級再次分級,區分不同類別的道路上各類交通的優先級,同時對橫斷面各組成要素研究分析,提出各專項內容的改進建議及理想的道路標準橫斷面,以提高道路網的運轉率,從而改善交通環境、提高交通設施服務水平與效率,為規劃、設計、管理部門提供基礎。
  9. Swc priority 1 - deep bay link ( dbl ) 5. 3 the dbl will be required urgently to connect the swc into yuen long highway ( ylh ) for access to route 3 country park section ( cps ) and tuen mun road

    3后海灣干線是深港西部通道接駁至元朗公路的重要通道,故須盡快興建,以便貫連三號干線(郊野公園段)及屯門公路。
  10. Section 6 right of priority

    第六節別除權
  11. Transverse rebar shall be overlapped in priority, in the same section of overlap area, proportion of overlapped rebar connections shall not be more than 50 % of total quantity of re - bar

    4梁板橫向鋼筋採用搭接,在同一連接區段內鋼筋搭接接頭面積配筋百分率應不大於50 % 。
  12. However, the interpretation of the standard clauses, the author considers to be specific cases, or contract interpretation apply general rules of priority or priority application, the standard clauses explain special rules, the judges have flexibility. section is on the judge to explain the mandate. although the rules of interpretation to the judges on the basis of analysis of the case law, but the rules are more abstract standard to explain the clauses of relevant laws and

    隨后,本文著重論述四種格式條款解釋規則即客觀解釋規則、不利解釋規則、限制解釋規則、優先解釋規則,通過對這些格式條款解釋規則之界定、意義、內容等方面的解析,指出格式條款解釋規則中存在的缺陷,並加以分析評價,從而進一步完善格式條款規則的立法。
  13. The 4th section was the key section of whole article, and conducted the countermeasure study in the following law fields : engineering payment ensurence surety, legal demand on the available construction project fund, restlessly contradicted right, contract dissolution right, subrogation right, engineering payment compensation priority, the punish rule of engineering payment in arrears, construction industry enterprise law consciousness and law enforcement consciousness and level, so as to solve the problem of engineering payment in arrears in construction field radically

    第四章是本文的重點部分,該章節從工程款支付保證擔保、建設項目資金到位的法定要求、不安抗辯權和合同解除權、代位權、工程款優先受償權、拖欠工程款的處罰規則、建築業企業的法律意識及執法意識和執法水平等方面進行對策性研究,以期從根本上解決建設領域的拖欠工程款問題。
  14. This year s special 301 report lists 52 countries or economies as priority foreign countries, priority watch list ( pwl ), watch list ( wl ) or section 306 monitoring

    本年度的「特別301 」報告將52個國家或經濟體列入重點國(
  15. If you select the access board section 508 check box, the wcag priority 1 check box is automatically selected and cannot be unselected

    如果選擇「 access board第508條」復選框,則「 wcag優先級1 」復選框會自動選定並且不能取消選定。
  16. Guidelines the validation performed by the accessibility validation tool treats the wcag priority 1 guidelines as a subset of the access board section 508 guidelines

    由可訪問性驗證工具執行的驗證將wcag優先級1準則視為access board第508條準則的子集。
  17. On the base of extend rough set theory, this paper put forward the improved data mining algorithm with priority attributes based on the priority relation. therefore, the classification precision of basic rough set and rough set with priority attributes reached unification and the classification rules by this model in the section are more curtail and rational. 4

    論文在粗糙集拓廣理論的基礎上,利用屬性的有序特性即優先二元關系,提出有序屬性的數據挖掘改進演算法,使基本粗糙集和帶有準則的粗糙集在挖掘分類精度上達到統一,且挖掘出的規則簡練、更具合理性和綜合性。
  18. Therefore, the complete list of access board section 508 errors and warnings consists of both the access board section 508 items and the wcag priority 1 items

    因此, access board第508條錯誤和警告的完整列表由access board第508條項和wcag優先級1項組成。
  19. If you run validation against the access board section 508 guidelines, the items that fail against the wcag priority 1 subset appear in the task list as wcag 1. 1 errors or warnings

    如果對access board第508條準則運行驗證,則未通過wcag優先級1子集驗證的項將作為wcag 1 . 1錯誤或警告出現在任務列表中。
  20. During 2003, the identification bureau ( ib ) accorded priority to enhancing communication and co - operation with mainland and macao counterparts, as well as to enhancing efficiency of the bureau. application of new technologies at crime scenes and in the advanced technology section ensured continued success in the identification of suspects

    二三年,鑒證科繼續致力加強與內地及澳門執法機關的溝通和合作,提升工作效率,並積極引進先進科技及改良技術核對指紋資料。該科不斷將嶄新的技術運用於罪案現場,其轄下先進科技課亦使用各種新技術,協助追查疑犯。
分享友人