project area 中文意思是什麼

project area 解釋
投影面積
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • area : n. 1. 面積;平地;地面。2. 空地;〈英國〉地下室前的空地。3. 地區,地方;〈比喻〉區域;范圍。
  1. Avine habitats of perennial streams in the project area will be preserved and protected by buffer zones

    工程項目區內的常年溪澗的河谷生境將會被保留下來及受到緩沖地帶的保護。
  2. 18 hectares under cedd works project area 23 hectares under outline zoning plan boundary which includes also part of the wdii works project area

    在土木工程拓展署工程計劃下是十八公頃在分區計劃大綱圖界線下是二十三公頃,包括部分灣仔發展計劃第二期的土地
  3. According to the method of participatory monitoring and evaluation, it conducts project monitoring and evaluation on social, economic and ecological benefits of project area in jingning county gansu province of phase world bank loan loess plateau vegetation rehabilitation project in the form of various interviews and discussions of semi - structure, key persons and village groups and questionnaire for approaching the participatory method applied to the monitoring and evaluation of soil and water conservation ecological building projects

    根據參與式監測評估方法,對甘肅黃土高原水土保持二期世行貨款項目靜寧縣項目區的社會、經濟、生態效益等,採用半結構訪談、關鍵人物訪談、問卷調查、村民小組訪談等形式開展項目監評,以探討參與式方法在水土保持生態建設項目監測評估中的應用。
  4. The permeability of 12 types of geotextiles, used as sub - drain pipe filters, were tested andcompared under two kinds of soils sampled from ningxia yinbei drainage project area

    採用一維和二維滲透模型對土工織物作為農田暗管排水外包濾料進行了試驗研究。
  5. Abstract : the permeability of 12 types of geotextiles, used as sub - drain pipe filters, were tested andcompared under two kinds of soils sampled from ningxia yinbei drainage project area

    文摘:採用一維和二維滲透模型對土工織物作為農田暗管排水外包濾料進行了試驗研究。
  6. The degraded ecosystems include : > 25 dry land, mountain dry land, low density forest, grassland of low cover rate or moderate cover rate, all of which are the sources of soil and water loss. the low intensity of soil and water loss accounts for 55 % of the project area, the moderate for 23 %, and fierce for 12 %

    早地、山區早地、疏林地以及低、中覆蓋度草地,也是水土流失主要的策源地;其水土流失的強度也表現出微度侵蝕占項目區的55 % ,中度侵蝕佔23 % ,強度侵蝕佔12 % 。
  7. To set the project area and iteration properties

    設置「項目區域「和「迭代」屬性
  8. The survey should be completed on the same day or at most within a couple of days. it is important that a comprehensive and accurate survey is conducted to prevent and deter " imposters " from taking up residence in the project area afterwards and abusing the rehousing scheme

    市建局會在項目的開始實施日期進行凍結人口調查,以確定受影響人士領取特惠津貼和獲得安置的資格。這項調查應于當日或最多數日內完成,並必須全面而準確,以免有假冒居民魚目混珠,入住重建區,濫用安置資源。
  9. The whole park is divided into 8 function areas, surface treatment area, mep industrial area, major project area, bay & wharf area, commerce & market area, waterside service area, supporting service area and relocation area

    分表面處理區、機電工業區、重大項目區、港池物流區、商貿市場區、濱水服務區、配套服務區、拆遷安置區八個功能板塊。
  10. Stability variation of a slope associated with transient groundwater flow a case study on shiliushu - bao landslide in huanglashi landslides, three gor - ges project area, china

    長江三峽黃臘石滑坡群石榴樹包滑坡災害性分析
  11. 8 on completion of the decontamination works and before starting the proposed housing development at the project area, the permit holder shall submit the final soil quality report of the previously contaminated areas to the eia sub - committee of the advisory council on the environment for inspection

    在工程項目范圍完成除污工程后及在展開建議的建屋發展計劃之前,許可證持有人須向環境諮詢委員會環評小組委員會提交先前受污染地帶的最終土壤質素報告,以供查閱。
  12. Species richness of shrubland in the project area is considered very low

    工程項目區內的灌木叢的品種豐盛程度非常低。
  13. Bird density in shrublands on the project area is also very low by

    以香港的標準而言,工程項目區內的灌木叢的鳥類密度亦很低。
  14. In recent years, multisensor image fusion techniques have attracted extensive attention in remote sensing application and image project area

    近年來,多源遙感圖像融合已經成為遙感應用領域和圖像工程領域的研究熱點。
  15. Ningxiang county long tianfan the industry limited company is located within the boundaries of the beautiful and rich hunan province ningxiang county, the first period project area approximately 28000 square meters, have the fixed asset 2800 ten thousand yuan, the staff 200 people, the year productivity 240 tons ; the second phased project completion year after next productivity will amount to 500 - 600 ton

    寧鄉縣龍田釩業有限公司位於美麗富饒的湖南省寧鄉縣境內,首期工程佔地面積約28000平方米,擁有固定資產2800餘萬元,職工200餘人,年生產能力240噸;二期工程竣工後年生產能力達500 - 600噸。
  16. What are the primary industries and economic clusters in the neighborhood and project area ? what appear to be their primary inter - relationships or common " factor " needs

    社區和專題地區中,有哪些主要的工業和經濟組群?他們的主要相互關系或共同要素需求看來是如何?
  17. Child aid project : the project area is located in the eshan and xinping counties ; it has a focus in education, community development and hiv / aids prevention

    兒童援助項目:項目地在當地的峨山和新平,項目活動的中心是教育,地區發展和艾滋病。
  18. On the basis of a full investigation and study and an integrated analysis of the geological setting and rock - mass mechanical environment of the bank slopes of the hydroelectric project area on the mainstream of the jinsha river and by combining the qualitative analysis with the quantitative evaluation, the authors calculated the instability of the sliding masses according to 1 / 8 and 1 / 11 of the total cubic capacity of the materials falling into the river and the surge wave heights at the falling sites as well as at the xiangjiaba and xiluodu dam sites and in adjacent townships according to the calculation method of the surge wave diagram given by the american society of civil engineers, made the risk evaluation of the bank slope instability with respect to the operation safety at the dam, safety of the cities and townships around the reservoir and safety of the reservoir operation, and put forward precautionary measures for bank slope instability

    摘要筆者通過調查研究和綜合分析金沙江幹流水電工程區岸坡地質背景和巖體力學環境條件,定性分析與定量評價相結合,採用與三峽工程庫區岸坡失穩危險性評價相類比的方法,針對崩滑體失穩按總體積的1 / 8和1 / 11入江方量進行了計算和按美國土木工程學會涌浪圖解計演算法計算了入水點及在向家壩壩址、溪洛渡壩址和鄰近城鎮的涌浪高度,並圍繞大壩施工安全、庫區周邊城鎮安全,水庫運營安全等方面對岸坡失穩的危險性進行了評價預測,提出了岸坡失穩的防治對策。
  19. Remote sensing studies on active faults in the western south - north water transfer project area in china

    南水北調西線工程區活動斷裂構造遙感研究
  20. For the stone nullah lane area, it is proposed to form part of an adjoining redevelopment priority project area. the redevelopment project will be carefully designed to integrate with the preservation of a group of the adjoining buildings of heritage value. it will be carried out by the ura

    就石水渠街地區而言,建議可以納入毗鄰的優先重建地盤內,將重建及保存有價值的建築物一起融合考慮,設計出一個有創意的市區重建計劃。
分享友人