project boundary 中文意思是什麼

project boundary 解釋
項目邊界
  • project : vt 1 投擲,拋出;發射(炮彈等);噴射。2 使突出,使凸出。3 設計,規劃,計劃,打算,籌劃。4 投影;...
  • boundary : n 邊界,疆界,限界 (between);(球場)邊線;界標;界限,范圍,分野。 aboundary dispute 邊界糾紛...
  1. The subject site mainly falls within the existing stt no. rdstst - 003 for the east rail extension project ( up to 31 august 2005 ), the proposed stt for kowloon southern link works area, the protection boundary for mtr ( i. e. mtr - rp no. 108 ) and the mtr construction limit ( mtr - rap no. 24 ). according to the scheme of the kowloon southern link gazetted on 26 march 2004, kcrc will continue to require the site for works area for a term from 1 september 2005 to 30 june 2008

    有關地點主要坐落於東鐵支線項目的現有短期租約第rdstst - 003號(有效至二零零五年八月三十一日止)和九龍南線的擬議短期租約的工程范圍、地鐵的防護邊界(即mtr - rp編號108 )及地鐵建設界限( mtr - rap編號24 )之內。
  2. The improvement plan for the right bank revetment of the first - step stilling basin for the normal spillway of huangbizhuang reservoir is optimized for many times, which has met the requirements to save the investment, shorten the construction period, guarantee the continuity of the boundary and satisfy the operation of the project at last

    摘要黃壁莊水庫正常溢洪道一級消力池右岸躺坡改建方案經過多次優化,達到了節約投資、縮短工程工期,保證了邊界的連續性,滿足工程運用要求。
  3. The entire hzmb is a 35km dual 3 - lane carriageway in the form of bridge - cum - tunnel structure comprising the 29km zhujiang section from the landing point at gongbei of zhuhai and a prola of macao to the boundary of the hksar, and the 6km hong kong section from the boundary of hksar to the landing point at san shek wan of lantau island. the project includes

    整條港珠澳大橋分為珠江和香港兩段,珠江段長約29公里,從位於珠海拱北和澳門明珠的大橋陸點至香港特別行政區區界,而長約6公里的香港段則由香港特區區界至位於香港大嶼山石灣的香港側陸點,工程范圍包括: -
  4. 18 hectares under cedd works project area 23 hectares under outline zoning plan boundary which includes also part of the wdii works project area

    在土木工程拓展署工程計劃下是十八公頃在分區計劃大綱圖界線下是二十三公頃,包括部分灣仔發展計劃第二期的土地
  5. In addition, in order to solve the differencing equations, feasible project is presented to deal with the first and second boundary conditions. finally, jacobi interation method is selected for the solution of the equation systems

    為了實現內點離散方程組的封閉,本文就第一、二類邊界條件在計算時的處理和邊界外虛擬點的外插法求值,給出了可行的解決方案。
  6. Tuen mun new cross - boundary ferry terminal project

    屯門跨境渡輪碼頭項目
  7. ( 2 ) transient jet - interaction phenomena, challenge project, is analyzed by computational unsteady aerodynamic method. boundary condition of transient jet is established

    ( 2 )將非定常空氣動力學數值計算方法創造性地應用於姿態控制發動機瞬態流場計算。
  8. The project of the experimental and theoretic research on friction reduction by microbubbles for high - speed ships, supported by the national natural science foundation of china ( no. 19772050 ), aims to study the key technology of air - jetting devices and its relevant problems, theoretically predict the law of bubble diffusing in the boundary layer and calculate the friction of the hull

    國家自然科學基金項目「高速氣泡船減阻試驗及理論研究」的目的在於研究高速氣泡船噴氣裝置的關鍵技術及其相關問題,並從理論上預測噴氣氣泡在船底邊界層的擴散規律和計算船體摩擦阻力,為將這一技術應用到實船上提供基礎。
  9. In order to solute the problem of diffluence mouth ' s uppityness in the underneath boundary in physics model, the dissertation adopts numerical model to calculate the area from zhuqi to baiyantan, and offer the physics model and the water level of wenshanli and kegong and the diffluence rate. at the same time, the dissertation compare the result between physics model and numerical model in different project

    為了解決物模下邊界分流口不易控制問題,本文同時採用數學模型進行更大范圍即竹岐至白巖潭計算,將文山裡、科貢水位、分流比提供給物理模型。同時,將方案計算結果與物理模型相互驗證。
  10. Since the boundary condition of river divertion during construction project is very complex, so physical model techneics are often used to checkout the design

    由於施工導流工程的邊界條件比較復雜,因此通常採用物理模型試驗對工程設計進行論證。
  11. How many pumps were turned on should be based on the dynamic design according to project target. and how many pumps should be in operation in standard shut off procedure. it was approved that although the theoretical boundary of decline of groundwater level is 10m, the actual boundary is only about 6m

    提出了一些與真空預壓加固地基設計相關的概念和處理方法,如定義真空預壓加固區場地形狀系數,提出按加固土體體積來確定射流泵數量、根據工程需要動態設計開泵量、增加停泵標準中對開泵量的規定等設計思想等,論證了真空預壓加固地基時地下水位下降的理論極限深度為10m ,而實際極限深度約為6m 。
  12. A further cross - boundary project, which is part of the " sky city " at the hong kong international airport, is also under development by the airport authority

    而機場管理局現時亦正發展另一項設于香港國際機場航天城的跨境項目。
  13. Over the medium term, decisions have also been announced to construct the shenzhen - hong kong western corridor which would provide an additional boundary crossing point, and the spur line railway project which would greatly relieve the congestion problem at lo wu

    中期方面,政府亦已公布興建深圳西部走廊,以為兩地提供新的跨界通道;及落馬洲支線鐵路項目;大幅舒緩羅湖通道的擠塞情況。
  14. Horizontal circulation at the inlet of the upper approaching channel of three gorges project can affect the safety of navigation. boundary layers will separate along a curved dike causing horizontal circulation regions which affect the overall flow field and increase sedimentation

    類似的由於流動邊界出現凸出障礙物引起邊界層分離,導致迴流發展、流態惡化,造成泥沙淤積等一系列問題的情況,在水利、航道及電站等工程中普遍存在。
  15. Cross - boundary infrastructure project

    跨界建設項目
  16. Base on deeply researches on efm, the project of efm solving static emf is designed and the program is developed. in addition, the problems of weighted functions, boundary conditions are discussed

    本文通過對無單元方法的深入研究,自行設計編寫了求解靜態電磁場邊值問題的efm程序,並對權函數問題、邊界處理問題作了比較深刻地探討。
  17. This original presents the universal insulation materials and the general testing and evaluating method for pipelines " insulation of the thermodynamics power generating plant ; performs the insulation testing and evaluating of the high temperature steam pipelines of longfeng heat and power plant ; takes composite structural research on the high temperature steam pipelines, and establishes the relevant optimizing physical and mathematical model of the insulation layer, confirms the constraint and boundary condition, carries on optimizing design for the thickness of insulating layer ; in order to more systematically analyzing the present situation of insulation of the installation and pipelines of longfeng heat and power plant, develops a suit of software namely " the information associated decisive system for the insulation project ", taking advantage of this software can achieve. the design, evaluation and direction to building for the insulation project, examine the criterion of design and building, the perform ance and manufacture data of different insulation material, which is convenient to the selection of insulation material

    在進行保溫結構優化的過程中,主要是針對高溫蒸汽管道進行復合結構研究,並建立相應的物理及數學模型,找出其約束條件和邊界條件。同時為了更加系統地對龍鳳熱電廠設備及管道的保溫現狀進行分析,開發了一套「絕熱工程信息決策系統」軟體,利用該軟體可以實現絕熱工程的設計、評估及施工指導,並可以查閱設計及施工標準、各種絕熱材料性能和生產廠家的資料,便於絕熱材料的選擇。該套軟體的設計填補了國內空白,避免了絕熱工程改造、設計及施工過程中的無序現象,規范了絕熟工程市場,從而為我國絕熱工程的選材、設計、施工及管理提供科學依據。
  18. Leakage is defined as the net change of anthropogenic emissions by sources of greenhouse gases ( ghg ) which occurs outside the project boundary, and which is measurable and attributable to the cdm project activity

    為項目邊界之外出現的並且是可測量的和可歸因於清潔發展機制項目活動的溫室氣體( ghg )源人為排放量的凈變化。
  19. The project boundary shall encompass all anthropogenic emissions by sources of greenhouse gases ( ghg ) under the control of the project participants that are significant and reasonably attributable to the cdm project activity

    項目邊界項目邊界應包括在項目參與者控制范圍內的、數量可觀並可合理歸因於清潔發展機制項目活動的所有溫室氣體( ghg )源人為排放量。
  20. Account for and report on all ghg emission sources and activities within the chosen project boundary. disclose and justify any specific exclusions

    充分考慮並報告在確定范圍內所有溫室氣體排放的源及活動,並對任何排除在外的情況予以說明。
分享友人